监理工程师通知回复单(类) A5

上传人:Za****n* 文档编号:160266870 上传时间:2022-10-10 格式:DOC 页数:1 大小:23KB
返回 下载 相关 举报
监理工程师通知回复单(类) A5_第1页
第1页 / 共1页
亲,该文档总共1页,全部预览完了,如果喜欢就下载吧!
资源描述
监理工程师通知回复单( 类)工程名称: 长安福特马自达发动机项目餐厅工程 编号:A5 01致: 重庆联盛建设项目管理有限公司 (监理工单位) B2204 号监理工程师通知单的内容完成情况如下(逐条对应写明):1, 工序报验已在完善,并报验。The declare of procedure is being advanced and has been declared.2, 土建交接资料已补做。The documents for exchange to CC has been made up.3, 对焊缝局部高度,宽度,厚度等严重情况进行现场修复整改。The at-site rectification is being made to height, width and thickness of partial serious crack .4, 对肋板凸出钢梁侧面7MM等已进行了现场整改。At-site rectification has been adopted to 7mm balance found between rib board and beam.5, 钢梁连接端板,现吊装之前已整改完成,对以前吊装构件进行高空整改。The rectification has been made to beam and bottom connection before rigging, as the same to those components that have been rigged.6, 对飞溅物,毛刺,飞边等进行沙皮打磨处理。The polishing has been made to slag, burr and sharp edge condition.7, 对钢构及零部件切割平面度差,割纹深度大等进行补焊处理。The rectification welding will be adopted to structure and components that has poor plane degree and deep welding crack.8, 油漆损坏大,局部有流坠现象,在高空用沙皮打磨后补漆,半成品保护差已通知公司进行保护。Any serious damaged coating and partly coating rests should be dealt with polishing in upper-air, the protection failure for semi-product has been delivered to company more careful protection. 承包单位项目经理部(章): 项目经理: 时间: 项目监理机构签收人姓名及时间承包单位签收人姓名及时间监理审核意见: 项目监理机构(章): 专业监理工程师: 总监理工程师: 日期: 注:监理工程师通知回复单分类为:进度控制类(A51)、质量控制类(A52)、造价控制类(A53)、安全文明类(A54)、工程变更类(A55)。江苏省建设厅监制
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 建筑环境 > 建筑工程


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!