资源描述
2011年6月英语六级考试冲刺练习:阅读篇753200字 2011年6月英语六级考试结束,毕业整理六级阅读资料,助大家备战下半年考试! In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of 论文代写 standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months. 开题报告 /html/lunwenzhidao/kaitibaogao/ There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building. 总结大全 /html/zongjie/ After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid. 开题报告 /html/lunwenzhidao/kaitibaogao/After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work. 作文 /zuowen/ In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.1. The main difference between panel method and the method discussed in the last paragraph is_. 作文 /zuowen/A. the latter uses ready-made internal features 思想汇报 /sixianghuibao/B. panels are cast in a level position 论文代写C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms 总结大全 /html/zongjie/D. the former is more expensive than the latter 论文代写22. Which of these statements is TRUE of system building? 思想汇报 /sixianghuibao/A. It employs more men. B. It is difficult and dangerous. 思想汇报 /sixianghuibao/C. It can save both time and money. D. It means less mechanization. 23. According to the passage, the principle of system building is that_. 开题报告 /html/lunwenzhidao/kaitibaogao/A. construction methods are safer 毕业B. buildings are made from a set of standardized units 思想汇报 /sixianghuibao/C. similar buildings can be produced 作文 /zuowen/ D. all units are produced on the site 毕业论文24. The usual fixed length in the modular system is_. A. twenty centimeters B. ten millimeters 简历大全 /html/jianli/C. fifty centimeters D. ten centimeters 开题报告 /html/lunwenzhidao/kaitibaogao/25. What lifts the concrete panels onto the building? 总结大全 /html/zongjie/A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks. 简历大全 /html/jianli/21. A 22. C 23. B 24. D 25. A 毕业论文
展开阅读全文