CONTRACT FOR PROJECT INSTALLATION

上传人:翰** 文档编号:62884604 上传时间:2022-03-16 格式:DOCX 页数:4 大小:15.45KB
返回 下载 相关 举报
CONTRACT FOR PROJECT INSTALLATION_第1页
第1页 / 共4页
CONTRACT FOR PROJECT INSTALLATION_第2页
第2页 / 共4页
CONTRACT FOR PROJECT INSTALLATION_第3页
第3页 / 共4页
点击查看更多>>
资源描述
CONTRACT FOR PROJECT INSTALLATION This Contract for project of installing Main Engine is made on_, by and between _ Company Ltd. (here- inafter called Party A) and _ Company Ltd. (hereinaftercalled Party B). 1.Name of installation work: _.2.Location of installation work: Party As_in Port A.3.Scope of installation work: As specified in the drawingsand statement attached.4.Time limit for completion:The installation work shall cordinate with the construction of _ in Party A, and shall be completed, including thetrial run for _, within _days after the completion of _.5.Total price of installation work:_U.S. D only.6.Payment terms of installation work:First installment:Party A shall pay to Party B fifteen percent of the total pricefor installation work, i.e._U.S.D only, when thiscontract comes into effect.Second installment:Party A shall pay to Party B fifteen percent of the total pricefor instalatiorn work, i.e_U. S. D. only, at the commencement of construction installation.Third installment:Party A shall pay to Party B ten percent of the total pricefor installation work, i.e._U. S. D. only, duringthe installation of pipes.Fourth installment:Party A shall pay to Party B forty percent of the total pricefor installation work, i.e._U. S. D. only, at thetime when the main equipment arrives at the site.Fifth installment:Party A shall pay to Party B ten percent of the total pricefor installation work,i.e._U. S. D. only, upon comple - tion of the installation work.Sixth installment:Party A shall pay to Party B ten percent of the difference of the price for installation work, i.e._U. S. D. only, after the work received has been proved qualified.7.Penalty for default:In the event Party B shall fail to complete the work in timeowing to reasons that Party B shall be held liable, Party B shallpay a penahy for such defauh based on one out of a thousand of the total price for installation work per day , i.e._U.S.D, only for each day of such default.8.Increase or decrease of work:In case Party A has to amend,increase or decrease the working schedule, the corresponding increase or decrease of total priceshall be evaluated according to the terms and conditions betweenthe two Parties, Should the work be increased, the Parties shallenter into an agreement for the unit price of additional items. Should any part of the completed work of any part of the materi - als transported to the site have to be abandoned owing to amend - ment made by Party A, Party A shall, after having received thework, pay for each completed work or materials abandoned as perthe unit price specified to Party B.9.Supervision for progress:The supervision personnel appointed by Party A and its rep - resentative shall have the authority to supervise the progress orwork and give instruction. Party B shall perform correctly in ac - cordance with such instruction given by Party As personnel orrepresentative.10.Stopage work:Should Party A notify Party B to stop the work for reasonsbeyond the responsibility of Party B, Party B can stop the workand claim from Party A the price of finished work, materials atsite and other reasonable expenses to be added or deducted fromthe paid installments.11.Custody of work:The completed work and the materials, tools, and equipment at site shall be under the custody of Party B after commencement and before completion and delivery of the work. Unless in the event of Force Majeure, Party B shall be fully responsible for any damage of the work under the custody of Party B. In case of Force Majeure, Party B shall give a list of damage according to the actual condition and suggest an expected price and date forrecovery from such damage to Party A for checking and payment.Should Party A decide not to continue with the work, thiscontract shall be terminated according to article 10 hereof.12.Warranty for work.Party B shall warrant the promised condition of the work within _ year(s) after the date of receiving the work by Party A. However, Party B shall not be liable to Acts of God or misuse of the work by Party A.13.Supplemental provisions:Party B shall be held responsible if Party As personnel or other people is injured due to the negligence of Party B duringthe progress of construction. However, such responsibility shallrest upon Party A if the injury caused is due to the negligence of Party A of technicians contracted with Party A.14.Attachments :Attachments shall become an integral part of this contractand shall be as effective as any other provisions. Attachments include:(1) Drawings(2) An estimate of cost.15.Format of this contract:The contract shall be in duplicate with two texts to be heldseparately by the Parties hereof. Each of the Parties shall alsokeep two copies of the contract for record.16.Additional Provision :Maintenace of Main Engine.Party B shall provide free periodic maintenance service forthe Main Engine of _ for _ year(s) after the receiving of the work by Party A and send maintenance personnel every _month(s) for performing maintenance.This contract has been executed by the Parties as of the day and year first above written.Party A:_Party B:_by:_ by:_Address:_Address:_Date:_Date:_ 第 4 页 共 4 页(Word格式)合同可编辑,仅供参考源于网络整理。
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 办公文档 > 模板表格


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!