工厂检查调查表英文

上传人:时间****91 文档编号:114481526 上传时间:2022-06-28 格式:DOC 页数:12 大小:174.50KB
返回 下载 相关 举报
工厂检查调查表英文_第1页
第1页 / 共12页
工厂检查调查表英文_第2页
第2页 / 共12页
工厂检查调查表英文_第3页
第3页 / 共12页
点击查看更多>>
资源描述
Factory code: Questionnaire for Factory InspectionName of Applicant:Name of Manufacturer:Name of Factory:China Quality Certification Center1.1 Name of the factory:Address of the factory:Tel: Fax: Post Code:E-mail:The Optimal route to factory local Railway station, airport (with the map if possible)1.2 Name of the manufacturer:Address of the manufacturer:Tel : Fax: Post Code:E-mail:2. Name of the applicant:Address:Tel: Fax: Post Code:E-mail:Contact person of certification: Department/position: Tel: 3. The name, department/position and telephone of principal on quality assurance Name of the principal: Department/position: Tel: 4. Total amount of employees in the factory (If the production for the certified product is just one part of the whole production, please indicate the amount of employees for the production and management on the products applied for certification) 5.1 The application No., name, model /specification and trade mark of the products applied for certification5.2 Pursuant standards of the products applied for certification6.1 Has the factory established and maintained a documented quality system according to the requirement of the implementation rules for certification? Provide the chart of organization structure the list of the quality manual the list of the documented procedures .6.2 Indicate the production process on the products applied for certification, which is performed by factory.(Please provide the production flow chart, and fill in the Appendix 1- List of Key Production Equipments.)6.3 Indicate the critical parts and materials, which are provided by the subcontractors.(Please give clear indication if the parts have passed the CCC or other equivalent product certifications.)6.4To ensure that the final products conform to corresponding standards, please specify on which items the factory has inspection ability during in-coming inspection, process inspection and final inspection. (Please provide a list of inspection documents and fill in Appendix2- List of Main Test Instruments and Equipments).7. Please indicate the Certificates and the Marks been got by the products for which the Certification have being applied.8. Whether or not the factory has obtained the certificates of quality system certification (please provide the copy of the certificates) and indicate the date and conclusion of last audit). 9. Date of factory inspection expected:Off day of factory: Time of factory on/off duty:Whether or not the inspection could be done on off day:yes discussible no 10. Whether or not the inspectors of Certification Body are allowed to access all sites for production and management on products applied for certification under consulting with quality principal during regular production?Signature and stamp of the representative of the factory:Date:Note: The undersigned person shall be responsible for the veracity of the information filled in this questionnaire.Appendix 1 List of Key Production Equipments Name of factory: page of No.Name of equipmentManufacturerMain technical parametersQuantityLocationAppendix 2List of Main Test Instruments and EquipmentsName of factory: page of No.Name of instruments & equipmentsManufacturerMeasure scopePrecisionQuantityLocation
展开阅读全文
相关资源
相关搜索

最新文档


当前位置:首页 > 图纸专区 > 考试试卷


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!