资源描述
设计、研究、分 I 4 4刮板输送机刮板链张紧检测与控制牛红宾(山西平舒煤业有限公司,山西 晋中045400)摘摇要:对于刮板输送机刮板链的张紧检测与控制问题,首先分析了刮板链上4处关键位置的张紧力大小顺序 ,由此得岀在机头链轮分离点进行张紧程度检测的方案;随后,对机头链轮下方刮板链的悬垂量进行了数学建模和实际检测方法研究,并最终提岀了刮板链张力检测与控制系统的组成结构与功能。关键词:刮板输送机摇刮板链摇张紧检测摇张紧力控制中图分类号:TD528.3摇摇摇摇摇文献标识码:A摇 摇摇摇摇文章编号:1002-6886 (2019) 03-0091-04Tension detect ion and con trol of scraper cha in of scraper con veyorNIU HongbinAbstract:For the problem of tension detection and control of scraper chain of scraper conveyor,firstly the tension force of four key positions on scraper chain is analyzed,and the schemeof testing the tension degreeat the separating point of the nose sprocket is obtained.Thenthe mathematical model of the sagof the scraper chain under the nose sprocket is established and the actual detection method is studied. Finally,the structure and function of the scraperchain tension detection and con 鄄 trol systemare put forward.Keywords :scraper conveyor,scraperchain,tensioning detection,tension control-91 -91 区高度的确定J.锅炉技术,2000, 08( 4): 5-7.4 摇栾颖,屠守国.循环流化床锅炉的循环倍率与密相区燃烧份额间的关联电站系统工程,1994,2(5): 39 -43.5 摇李斌.中小型循环流化床锅炉二次风的布置J.工业锅炉,2009,04(5): 14-16.6 摇岑可法.循环流化床锅炉理论设计与运行M.北京:中国电力出版社,1998.7 摇杜守国,姜孝国.135MW循环流化床锅炉的设计J.电力建设,2003,07(2): 7-8+11.8 摇郎丽萍,孙献斌,王智微.江西分宜发电厂410t/h循环流化床锅炉的设计J.锅炉制造,2003, 01(3): 1012.9 摇包绍麟,吕清刚,那永洁,等.130t/h循环流化床锅炉8-20+68.10 摇包绍麟,吕清刚,那永洁,等.480t/h循环流化床锅炉的设计与运行J.热力发电,2006,09(5): 18-20+2.11 摇韩俊,陈贵军,胡胜东,等.130t/h CFB锅炉达不到设计出力的整改方案分析J.节能,2008, 11( 5): 4749.12 摇刘德昌,陈汉平,张世红,等.循环流化床锅炉运行及事故处理M.北京:中国电力出版社,2006.作者简介:王军(1988-),男,山西武乡人,硕士研究生,助理 工程师,主要从事电厂技术及管理工作。收稿日期:2018-04-03-91
展开阅读全文