七颗钻石流程(一)

上传人:muj****520 文档编号:253062183 上传时间:2024-11-28 格式:PPTX 页数:39 大小:1.85MB
返回 下载 相关 举报
七颗钻石流程(一)_第1页
第1页 / 共39页
七颗钻石流程(一)_第2页
第2页 / 共39页
七颗钻石流程(一)_第3页
第3页 / 共39页
点击查看更多>>
资源描述
单击此处编辑母版标题样式,单击此处编辑母版文本样式,第二级,第三级,第四级,第五级,2021/2/8,#,1,7,Diamond Process,七颗钻石流程,Developed by:,GMTG-Arlington,L.ONeal/C.Kessler,Aug 2000,Revised:8 Aug 2000,2,What is the 7 Diamond Process?,七颗钻石的流程是什么?,The 7 Diamond Process is one of many tools that can be used in the problem solving process.,七颗钻石流程是可以用来解决质量问题的工具之一。,This tool is used to investigate discrepancies discovered by the following:,它可以用来调查以下方面发现的差异,Global Customer Audit System(GCAS),全球顾客评审,Yard Walk Audits,生产线上巡检,Verification Stations,检验工位,3,Purpose of the 7 Diamond Process,7,颗钻石流程的目的,The,7 Diamond Process,is a structured way of assessing our manufacturing process to determine whether of not it has failed to meet the quality standard demanded by our customers.,7,颗钻石流程,是一个构建好的评价我们的制造流程是否满足了顾客所要求的质量标准的一个方法,4,7,Diamond,Process,流程,Responsibility,责任,Production,第一步,1,Production,第二步,2,Production,第三步,3,Rel.Engineer/,SQA/Supplier,负责的,SQDE,工程师/供应商,4,Correct,Process,?,正确的工艺,Correct,Tool?,正确的工具,Correct,Part?,正确的零件,Parts,Quality?,零件质量,Responsibility,责任,Process Control,Managers,工艺控制负责人,5,a,Is Engineering,support required?,是否需要工程方面的支持,Problem Identified,Begin Interrogation,问题定义(开始调查),Responsibility,责任,QET,PST(Lead),5b,SMT,RGM (Lead),6,Statistical,Engineering,(Red X,Strategies),统计工程(红-,X,方法),7,Will,Process Change,Resolve?,工艺更改能解决问题吗,Product Change,Required?,产品更改需要吗?,Hardy,Perennial or,Extremely Complex,Problem,非常复杂的问题,SQA-Supplier Quality Assurance,QET-Quality Engineering Team,PST-Plant Support Team,SMT-Systems Management Team,RGM -Reliability Growth Management,5,Review of Responsibility,职责回顾,Diamonds 1-4Production&Reliability,钻石1-4 生产&可靠性,Filter 5aProcess Control Manager(PCM),5a,过滤 工艺控制负责人,Diamond 5b-7Product Engineering,钻石5,b-7,产品工程,6,Insert Sample Countermeasure,Card Here,此处插入对策卡样卡,7,7,Diamond Process Stages,流程的各步骤,Stages 1&2 of the process are used to determine if the Production organization is running the assembly process to design intent.,1、2,步是用来确定生产部门运行的装配流程满足设计内容。,The initial investigation(Stage 1)is done where the defect was identified.,最初的调查(第一步)应在发现缺陷的地方开始,Stage 2 is only used when the investigation in Stage 1 determined that the cause of the problem was from an upstream source.,第2步只能当第一步的调查,确定问题是来源其他方面时,才可开始,If the process isnt being managed to design intent,then it must be corrected and validated,prior to asking for Engineering assistance.,如果工艺没有满足设计内容,当需要工程方面的协助前,必须进行纠正并要有效。,Engineering referral(Stage 3)occurs when the manufacturing process does meet design intent and the problem still exists.,当制造过程满足设计内容并且问题依然存在时,第3步开始。,8,1-,Correct Process,正确的过程,Are the correct Best People Practice sheets posted?,是否有正确的操作指导文件?,Are the Best People Practices being followed?,是否执行操作文件?,Is the operators Key Point Chart being followed?,是否满足关键操作点控制图,Are the correct documents posted on the operation certification board?,是否在操作示板上有正确的文件,Is the job being performed to the PADs?,是否按照,PAD,操作,Can any of these cause the problem?,以下的问题有可能产生问题吗?,Stages 1&2,Production,Corrects,正确的生产,Production,2,Production,3,Rel.Engineer/,SQA/Supplier,4,Correct,Process?,正确的工艺过程,Correct,Tool?,正确的工具,Correct,Part?,正确的零件,Parts,Quality?,零件的质量,8,1-,Correct Process,正确的过程,Has a mandatory sequence been identified?Is it being followed?,是否强制的操作序列号已识别,是否执行了,Is the job being done the same on both shifts?,在各班次中操作工作是否一致,Does the operator understand what the product standards are?,操作者是否理解产品标准,Is it the regular operator?Has there been a lot of turnover on the job?,是否为固定操作工?是否此操作有很多轮换人员,Has the operator been properly trained?,操作者是否正确培训过,Are the visual aids current?,目前是否有目视化的辅助措施,Does the operator understand the quality outcomes of her/his job?,操作者是否知道他/她的岗位的产品的输出质量,Does the operator know how to communicate when he/she has a problem?,操作者是否知道当他/她的岗位出现质量问题时如何传递沟通信息?,Can any of these cause the problem?,以下的问题有可能产生问题吗?,Stages 1&2,Production,Corrects,正确的生产,Production,2,Production,3,Rel.Engineer/,SQA/Supplier,4,Correct,Process?,正确的工艺过程,Correct,Tool?,正确的工具,Correct,Part?,正确的零件,Parts,Quality?,零件质量,9,Are the correct tools&fixtures being used?(both shifts),是否使用正确的工具/夹具(各班次),Are the tools set to the specified torque?,工具是否设置成规定的扭矩,Are they properly calibrated?,是否进行适当的校准,Are both shifts using the same tool?,是否各班次用同样的工具,Are the bits or sockets worn?,是否螺丝刀或套筒已磨损,Has an extra air hose been attached to the tool?,是否在工具上有多余的空气管,Is the tool tied to the Andon system?,工具是否与暗灯相连,Has the tool been put on Bypass?,是否工具被旁路,Do the tools&fixtures have mutilation protection?,是否工具/夹具有损毁保护,Has the workstation been error proofed?,工位是否有防错设施,Does the workstation layout allow the operator to work effectively?,是否工位的布置适合操作者有效的工作,Has the Preventive Maintenance been done?(check log),是否进行了预防性维修(检查表),Are tools functioning correctly?,工具功能是否正确,Stages 1&2,Production,Corrects,Production,1,Production,3,Rel.Engineer/,SQA/Supplier,4,Correct,Process?,正确的工艺过程,Correct,Tool?,正确的工具,Correct,Part?,正确的零件,Parts,Quality?,零件质量,2-,Correct Tool,正确的工具,Can any of these cause the problem?,10,Is the PartsRoutingcurrent?,零件的路,径,径是否正,确,确,Arethecorrectpartnumbersidentifiedon the materialra
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 商业管理 > 营销创新


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!