PB2a-WasteWaterDisposal-UNLConstructionProgramspb2a-污水-除非施工方案

上传人:ra****d 文档编号:252483398 上传时间:2024-11-16 格式:PPT 页数:15 大小:260.50KB
返回 下载 相关 举报
PB2a-WasteWaterDisposal-UNLConstructionProgramspb2a-污水-除非施工方案_第1页
第1页 / 共15页
PB2a-WasteWaterDisposal-UNLConstructionProgramspb2a-污水-除非施工方案_第2页
第2页 / 共15页
PB2a-WasteWaterDisposal-UNLConstructionProgramspb2a-污水-除非施工方案_第3页
第3页 / 共15页
点击查看更多>>
资源描述
Click to edit Master title style,Click to edit Master text styles,Second level,Third level,Fourth level,Fifth level,*,Waste Water Disposal,Plumbing Systems,CNST 305,Environmental Systems 1,Dr.Berryman,2a,Waste Water Disposal and Storm Drainage,Chapter 4,7;Appendix A(Wentz)and 8.6-8.7(Toa),4.11 Analysis and Design of Construction Systems-Mechanical(3 hrs),Individual Waste Treatment,Individual,Usually residential or small commercial use or areas that have no access to municipal treatment plant,Primary Treatment,Septic Tanks*,Individual-Primary,Individual Primary(cont.),Improvements on Primary System,Increase digestion rates,.,Individual Secondary System,Drain Field,Drain Field “Perc Test,Length of drain tile determined by Percolation test,Mounds with Leach Beds,Seepage Pits,Evaporation Pits,Sand Filter,Individual Tertiary System,Cost Comparisons,Relative costs of home sewage treatment systems as compared to the septic tank-absorption field system(assumed to be$2,500 in spring,1980).,SOURCE:,Sewage Treatment Plants,Similar to individual,Three stages of treatment,FILM,Next time,Storm Drainage,2a,Waste Water Disposal and Storm Drainage,Chapter 4,7;Appendix A(Wentz)and 8.6-8.7(Toa),4.11 Analysis and Design of Construction Systems-Mechanical(3 hrs),
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 商业管理 > 商业计划


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!