产品设计和处理选择——生产-英文-课件

上传人:痛*** 文档编号:243867083 上传时间:2024-10-01 格式:PPT 页数:19 大小:218.27KB
返回 下载 相关 举报
产品设计和处理选择——生产-英文-课件_第1页
第1页 / 共19页
产品设计和处理选择——生产-英文-课件_第2页
第2页 / 共19页
产品设计和处理选择——生产-英文-课件_第3页
第3页 / 共19页
点击查看更多>>
资源描述
Operations Management,For Competitive Advantage,Click to edit Master title style,Click to edit Master text styles,Second Level,Third Level,Fourth Level,Fifth Level,The McGraw-Hill Companies, Inc., 2001,C,HASE,A,QUILANO,J,ACOBS,ninth edition,19,Product Design & Process Selection - Manufacturing,Operations Management,For Competitive Advantage,C,HASE,A,QUILANO,J,ACOBS,ninth edition,Chapter 5,Product Design & Process Selec,Chapter 5,Product Design & Process Selection-Manufacturing,Typical Phases of Product Design Development,Concurrent Engineering,Designing for the Customer,QFD,Design for Manufacturability,Types of Processes,Process Flow Structures,Process Flow Design,Global Product Design and Manufacturing,Chapter 5Product Design & Pro,Typical Phases of Product Design Development,Concept Development,Product Planning,Product/Process Engineering,Pilot Production/Ramp-Up,Typical Phases of Product Desi,Concurrent Engineering,Defined,Concurrent engineering,can be defined as the simultaneous development of project design functions, with open and interactive communication existing among all team members for the purposes of reducing time to market, decreasing cost, and improving quality and reliability.,Concurrent EngineeringDefined,Designing for the Customer,Quality Function,Deployment,House of Quality,Value Analysis/,Value Engineering,Ideal Customer Product,Designing for the Customer Qua,Designing for the Customer: Quality Function Deployment,Interfunctional teams from marketing, design engineering, and manufacturing,Voice of the customer,House of Quality,Designing for the Customer: Q,Designing for the Customer: The House of Quality,Customer,Requirements,Importance to Cust.,Easy to close,Stays open on a hill,Easy to open,Doesnt leak in rain,No road noise,Importance weighting,Engineering Characteristics,Energy needed,to close door,Check force on level ground,Energy needed,to open door,Water resistance,10,6,6,9,2,3,7,5,3,3,2,X,X,X,X,X,Correlation:,Strong positive,Positive,Negative,Strong negative,X,*,Competitive evaluation,X = Us,A = Comp. A,B = Comp. B,(5,is best),1 2 3 4 5,X,AB,X AB,XAB,A X B,X A,B,Relationships:,Strong = 9,Medium = 3,Small = 1,Target values,Reduce energy,level to 7.5 ft/lb,Reduce force,to 9 lb.,Reduce energy,to 7.5 ft/lb.,Maintain,current level,Technical evaluation,(5 is best),5,4,3,2,1,B,A,X,BA,X,B,A,X,B,X,A,BXA,BA,X,Door seal,resistance,Accoust. Trans.,Window,Maintain,current level,Maintain,current level,The McGraw-Hill Companies, Inc., 2001,7,Designing for the Customer: T,Designing for the Customer: Value Analysis/Value Engineering (VA/VE),Achieve equivalent or better performance at a lower cost while maintaining all functional requirements defined by the customer.,Does the item have any design features that are not necessary?,Can two or more parts be combined into one?,How can we cut down the weight?,Are there nonstandard parts that can be eliminated?,Designing for the Customer: V,Design for Manufacturability,Traditional Approach,“We design it, you build it” or “Over the wall”,Concurrent Engineering,“Lets work together simultaneously”,Design for ManufacturabilityTr,Design for Manufacturing and Assembly,Greatest improvements related to DFMA arise from simplification of the product by reducing the number of separate parts:,1. During the operation of the product, does the part move relative to all other parts already assembled?,2. Must the part be of a different material or be isolated from other parts already assembled?,3. Must the part be separate from all other parts to allow the disassembly of the product for adjustment or maintenance?,Design for Manufacturing and A,Types of Processes,Conversion,Fabrication,Assembly,Testing,Types of ProcessesConversion,Process Flow Structures,Job shop,Batch shop,Assembly Line,Continuous Flow,Process Flow StructuresJob sho,IV.,Continuous,Flow,III.,Assembly,Line,II.,Batch,I.,Job,Shop,Low,Volume,One of a,Kind,Multiple,Products,Low,Volume,Few,Major,Products,Higher,Volume,High,Volume,High,Standard-,ization,Commercial,Printer,French Restaurant,Heavy,Equipment,Coffee Shop,Automobile,Assembly,Burger King,Sugar,Refinery,Flexibility (High),Unit Cost (High),Flexibility (Low),Unit Cost (Low),Exhibit 5.10,IV.III.II.I.LowMultipleFewHigh,Virtual Factory,Defined,A,virtual factory,can be defined as a manufacturing operation where activities are carried out not in one central plant, but in multiple locations by suppliers and partner firms as part of a strategic alliance.,Virtual FactoryDefinedA virtu,Process Flow Design,Defined,A,process flow design,can be defined as a mapping of the specific processes that raw materials, parts, and subassemblies follow as they move through a plant.,The most common tools to conduct a process flow design include assembly drawings, assembly charts, and operation and route sheets.,Process Flow DesignDefinedA p,Example: Assembly Chart (Gozinto),A-2,SA-2,4,5,6,7,Lockring,Spacer, detent spring,Rivets (2),Spring-detent,A-5,Component/Assy Operation,Inspection,From Exhibit 5.14,Example: Assembly Chart (Gozin,Example: Process Flow Chart,Material Received from Supplier,Inspect Material for Defects,Defects found?,Return to Supplier for Credit,Yes,No, Continue,Example: Process Flow Chart Ma,Global Product Design and Manufacturing Strategies,Joint Ventures,Global Product Design Strategy,Global Product Design and Manu,Measuring Product Development Performance,Time-to-market,Productivity,Quality,Measuring Product Development,
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 管理文书 > 施工组织


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!