【水泥工艺培训】Atox立磨培训课件

上传人:风*** 文档编号:241918493 上传时间:2024-08-05 格式:PPTX 页数:53 大小:8.78MB
返回 下载 相关 举报
【水泥工艺培训】Atox立磨培训课件_第1页
第1页 / 共53页
【水泥工艺培训】Atox立磨培训课件_第2页
第2页 / 共53页
【水泥工艺培训】Atox立磨培训课件_第3页
第3页 / 共53页
点击查看更多>>
资源描述
Presentation OnAtox 50 MillThings to do,before proceeding to siteRunning Site-OfficeATOX Raw Mill,Size 50ATOX Raw Mill,Size 50Atox Mill Components and Its Installation Foundation Base frame Gear unitGrinding table Grinding rollersMill HousingsNozzle ring Separator housingsAtox Mill Components and Its Atox mill components and its Installation Densit lining Separator partsJoint headHydraulic cylinderPull rodTorque armAccumulatorsAtox mill components and its IAtox mill components and its Installation Separator driveHydraulic and Rollers lube systemsAtox mill components and its IATOX Mill,Circuit of Grinding ForceATOX Mill,Circuit of GrindingATOX Mill,Grinding Mode with MaterialATOX Mill,Grinding Mode with ATOX Mill,Grinding Mode with MaterialATOX Mill,Grinding Mode with【水泥工艺培训】Atox立磨培训课件Mill FoundationMill FoundationMill Base FrameMill Base FrameMill Base FrameMill Base FrameMill Gear PlateMill Gear PlateMain Gear UnitMain Gear UnitGrinding TableGrinding TableGrinding Table Wear LinersGrinding Table Wear LinersJoint HeadJoint HeadGrinding Rollers and Center YokeGrinding Rollers and Center YoGrinding Rollers and Center YokeGrinding Rollers and Center YoMill HousingsMill HousingsNozzle RingNozzle RingDensit Lining On Reject ConeDensit Lining On Reject ConeDensit Lining on Mill Housing Bottom PlateDensit Lining on Mill Housing Densit Lining on Separator Bearing Shaft Assy.Densit Lining on Separator BeaSeparator HousingsSeparator HousingsSeparator HousingsSeparator HousingsSeparator Guide VanesSeparator Guide VanesSeparator RotorSeparator RotorSeparator RotorSeparator RotorSeparator Top SectionSeparator Top SectionSeparator Bearing AssemblySeparator Bearing AssemblySeparator Drive UnitsSeparator Drive UnitsMill Feed ChuteMill Feed ChuteHydraulic CylinderHydraulic CylinderHydraulic RoomHydraulic RoomWater spray UnitWater spray UnitAccumulatorsAccumulatorsMill Installation CompleteMill Installation CompleteMill Installation Before and AfterMill Installation Before and AThings to do before proceeding to siteThings to do before proceedinThings to do,before proceeding to site1.Assignment.2.Turn-key?3.Basic?4.Project organization.5.Who is the PM(project or contract manager)?6.Meeting with PM?7.Special training required?8.Site Manual?9.Safety and security briefings-?Things to do,before proceedinThings to do,before proceeding to siteVisa?Work permit?Forex?Air ticket?Medical insurance?Vaccinations?Time sheet?FQRs?Airport pick-up?Contact persons?Telephone numbers?3.DocumentationStudy the scope of documentation every department,every type,make a list or get a list from the PM/ENGG and tick off.If our FLS scope is a part delivery(basic)who is then making the complete documentation?Things to do,before proceedinThings to do,before proceeding to site4.Sundri equipment which require specialists at Site.Scope of equipment?Make?Type?Calculate number of persons and estimated time at Site.Supervisor at lump sum price or hourly paid5.Equipment which require special storage or safe-keeping at Site.Scope of equipment?Make?Type?Instructions about the storage or safe-keeping?6.Equipment delivered which requires sub-suppliers presenceat commissioning and first start up.Scope of equipment?Make?Type?Things to do,before proceedinRUNNING SITE-OFFICERUNNING SITE-OFFICERunning site-officeThe site office is responsible that information is prepared about all important decisions and events on Site from the day of mobilisation and until the day of final Field Acceptance Document Current files:-Diary including:Arrival and departure of site-employed personnel.Number and type of main erection equipment used.Arrival and internal flow of equipment.Type,extent and location of performed progress.Obstacles,interruptions,tests performed.Stoppage of work specifying the cause.AccidentsWeather conditions,site conditions(access)Specific directions or instructions from client or others.etc.Running site-officeThe site ofRunning site office-Minutes of meetings from site meetings-Time schedules.-As shipped drawings and equipment-Instruction manuals covering the total scope of supply-As built drawings and equipment instruction manuals.-Packing lists(shipping document)-Project error reports(FQRs)-Deviation orders-Site instruction manuals-Site rules covering organisation,accidents,safety,fire protection,protection against burglary and vandalism,housekeeping,-FLS Installation Manual-List of names of all site assigned persons.-Site progress reports.-Memo to ClientRunning site office-Minutes Running site officeREPORTSThe site office is responsible that reporting based on and if necessary documented by the current site files is prepared and sent to FLS at the times agreed upon or as normal practice to send once in a week.Time sheet,every week/Month Finished Erection certificate Final Acceptance certificateRunning site officeRunning site officeNote:This is reference onlyFinished Erection certificate,Model copyRunning site officeNote:This Running site officeNote:This is reference onlyTime Sheet,Model copyRunning site officeNote:This Running site officeNote:This is reference onlyFinal Acceptance certificate,Model CopyRunning site officeNote:This Questions?【水泥工艺培训】Atox立磨培训课件End of Presentation.【水泥工艺培训】Atox立磨培训课件本节内容结束恭祝
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 办公文档 > 教学培训


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!