导游审房山景区答案范文.docx

上传人:s****u 文档编号:12776411 上传时间:2020-05-23 格式:DOCX 页数:8 大小:426.94KB
返回 下载 相关 举报
导游审房山景区答案范文.docx_第1页
第1页 / 共8页
导游审房山景区答案范文.docx_第2页
第2页 / 共8页
导游审房山景区答案范文.docx_第3页
第3页 / 共8页
点击查看更多>>
资源描述
想到这里,他立即带上两个测工,肩扛手拎着仪器,硬是徒步走到了现场。section of the Department of project management; Project documents and information: Project Engineering Department; Materials and equipment: material supply projects; Security controls: the project Department of safety and security; Construction machinery: Project Engineering Department; Financial: Project Management Department of finance; Security and fire services: project security. 3.3.5 management representative and project manager in this item specifies that the Chief Engineer is the management representative, responsible for the operation of quality management system and supervision, regardless of how his other responsibilities, should have a clear mandate to: ensure that the quality management system is implemented and maintained; The running of the quality management system to the project manager, including needed improvements; Always be aware that the customers needs and requirements. 3.4 3.4.1 project management review should be an annual review of its quality management system to ensure its continuing suitability, adequacy and effectiveness. 3.4.2 Administration review by the project manager responsible for organization and implementation, project quality control Department is responsible for specific tasks. 3.4.3 the management review should compare and evaluate the following input: internal and external quality audits and corrective effect; Customer feedback on the construction, installation, commissioning, service information (complaints and satisfaction); Quality records, quality compliance with trend reports, analysis of results; Combined with the quality policy and the achievement of the goals, status and suitability evaluation of the quality management system to determine corrective, preventive and improvement measures of performance. 3.4.4 evaluation method and procedure (1) review: by the project manager, project manager, functional departments and heads of specialized
展开阅读全文
相关资源
相关搜索

当前位置:首页 > 图纸专区 > 考试试卷


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!