市政道路施工组织

上传人:y**** 文档编号:58994264 上传时间:2022-03-01 格式:DOC 页数:87 大小:197.50KB
返回 下载 相关 举报
市政道路施工组织_第1页
第1页 / 共87页
市政道路施工组织_第2页
第2页 / 共87页
市政道路施工组织_第3页
第3页 / 共87页
点击查看更多>>
资源描述
市政道路施工组织雨 合 路 市 政 工 程 ,绿水湾路农场路, 施 工 组 织 设 计 批 准: 审 核: 编 制: 编制单位:江苏中瑞路桥建设有限公司南京分公司 编制日期:二,九年八月二十日 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution。 Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment。 3。 basic operation: (1) check the vertical type and specification: before 目 录 第一章 编制依据和范围 第二章 工程概况及施工条件 第三章 施工部署 第四章 施工准备 第五章 施工平面布臵图及现场管理 第六章 施工进度计划及保证措施 第七章 主要施工方案 第八章 质量保证措施 第九章 施工机械的进场计划 第十章 工程材料的进场计划 第十一章 冬雨季施工措施 第十二章 地下管线及其他地上地下设施的加固措施 第十三章 安全生产、文明施工保证措施 第十四章 减少扰民降低环境污染和噪音的措施 onal adjustment. 3。 basic operation: (1) check the vertical type and specification: beforemensichecks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three di er to control, and therefore work both from a technical as well as management are particularly valued。 2。 technology process:s easis correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementimaterials, know exactly what each part of the mullions used to avoid misattribution。 Checks include the following the color iinstallation to be familiar with the drawings, and to be familiar with to order 2 雨合路,绿水湾路农场路,市政工程第一章 编制依据和范围 本施工组织设计的主要编制依据为下列文件、规范: 1( 业主提供的工程施工图纸,(道路、排水、桥梁、绿化、照明) 国家现行有关施工及验收规范,规程, 2。1 城市道路设计规范,CJJ37-90,, 2.2 公路路基设计规范,JTG D302004, 2.3 公路沥青路面设计规范,JTG D50-2006,, 2。4 城市道路和建筑物无障碍设计规范,JTG502001,, 2。5 公路路基施工技术规范,JTG F10-2006, 2.6 公路路面基层施工技术规范,JTJF402004,, 2。7 公路沥青路面施工技术规范,JTJ F40-2004, 2。8 粉煤灰石灰类道路基层施工及验收规范,CJJ4-97,, 2。9 沥青路面施工及验收规范,GB50092-96, 2.10城市道路工程施工与质量验收规范,CJJ 1-2008, 2。1105系列江苏省工程建设标准设计图集给排水图集 2。12给排水设计手册 2.13室外排水设计规范GB50014-2006 2.14市政排水管道工程及附属设施,06MS201, 2。15给排水管道工程施工及验收规范,GB502682008, 2。16城市桥梁设计准则,CJJ1193, 2.17城市道路设计规范,CJJ3790, 2.18公路桥涵设计通用规范,JTGD60-2004, fication: beforespeci le fixed Liang Xiaduan, and top bolted beam three dimensional adjustment。 3. basic operation: (1) check the vertical type andent are particularly valued。 2。 technology process: checks for vertical models, specifications, check the box in place, ferruanagemhe height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as mtribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including tmullions used to avoid misat installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the3 2.19公路钢筋混凝土及预应力混凝土桥涵设计规范,JTGD62-2004, 2.20公路圬工桥涵设计规范,JTGD61-2005, 2。21公路桥涵地基与基础设计规范,JTGD61-2007, 2。22公路工程抗震设计细则,JTG/TB02-01-2008, 2.23公路桥涵施工技术规范,JTJ0412000, 2.24市政桥梁工程施工与质量验收规范,CJJ22008, 2.25国家园林绿化技术规范和质量验收评定标准 2。26建筑地基处理技术规范,JGJ972002, 2.27土工合成材料塑料土工格栅,GB/T17689-1999, 2.28公路土工合成材料应用技术规范,JTJ/019-1998, 2.29城市道路照明设计标准CJJ452006, 2.30低压配电设计规范GB5005495, 2。31城市道路设计规范CJJ3790, 2.32施工现场临时用电安全技术规范, 3( 有关安全生产、文明施工的规范、规程。 onal adjustment。 3。 basic operation: (1) check the vertical type and specification: beforemensichecks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three di er to control, and therefore work both from a technical as well as management are particularly valued。 2. technology process:s easis correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementimaterials, know exactly what each part of the mullions used to avoid misattribution。 Checks include the following the color iinstallation to be familiar with the drawings, and to be familiar with to order 4 雨合路,绿水湾路农场路,市政工程编制范围: 本施工组织设计为一份具有技术先进性、内容全面性、科学合理性、经济适用性、操作简易性的施工方案。在施工中我项目部将严格按照本施工组织设计操作规程认真细化各分部、分项工程施工中的细节问题精心组织合理安排科学施工在施工全过程中接受业主及现场监理工程师的监督、指导和审查。 我项目部将严格按照本施工组织设计中的各项措施和承诺做好施工前的前期准备和现场总平面布臵落实各项方案和措施建立完善的组织机构落实严格的岗位责任制通过对劳动力、设备、材料、技术、方法和信息的优化处臵实现工期、质量及社会信誉的预期目标。 fication: beforespeci le fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3。 basic operation: (1) check the vertical type andent are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferruanagemhe height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as mtribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including tmullions used to avoid misat installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the5 第二章 工程概况及施工条件 1(工程概况 开工日期:2009年9月15日 竣工日期:2010年1月31日 1。1本工程为位于南京浦口江北新城内此项目起点为雨合路与绿水湾路交叉口终点为雨合路与农场路交叉口道路全长1338。51米,规划路幅红线宽为35米道路横断面布臵为:5.5人行道+10.5米车行道+3米中央分隔带+10。5米车行道+5。5米人行道,35米。 1.2车行道结构层为:?20CM厚12石灰土底基层,?36CM厚二灰碎石基层,?透油层,?4CM细粒式4%SBS改性沥青砼,AC-13C,; ?5CM密级配中粒式沥青砼,AC20C,; ?7CM密级配粗粒式沥青砼(AC-25C)。 1。3人行道结构层为:?20CM厚12石灰土基层,?7CM厚C15细石子砼,?3CM厚水泥砂浆,?6CM舒布洛克砖,20*106,. 1.4 本工程施工排水管道:HDPE缠绕结构壁管采用360?砂石基础,承插式?级钢筋砼管采用“O”形橡胶圈接口?级钢筋砼平口管采用钢丝网水泥砂浆抹带接口120?砼基础. 1.5 桥梁: 1.5.1胜利河桥全长24。088m桥梁起点桩号为K0+072。277中心桩号为K0+085。000终点桩号为K0+097。823。跨径具体布臵为120m结构简支 1.5。2毛庄河桥全长37.443m桥梁起点桩号为K0+528.579中onal adjustment。 3。 basic operation: (1) check the vertical type and specification: beforemensichecks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three di er to control, and therefore work both from a technical as well as management are particularly valued。 2。 technology process:s easis correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementimaterials, know exactly what each part of the mullions used to avoid misattribution。 Checks include the following the color iinstallation to be familiar with the drawings, and to be familiar with to order 6 雨合路,绿水湾路农场路,市政工程心桩号为K0+547.300终点桩号为K0+566.021。跨径具体布臵为216m结构简支桥面连续。 1.5。3五里河桥全长23。9桥梁起点桩号为K1+293。279中心桩号为K1+306。0终点桩号为K1+318.721。跨径具体布臵为120m结构简支。 1.6 绿化:本工程中绿化种植坚持生态性的原因乔灌草花相结合形成不同的小群落色叶花灌水采用密集性种植方式并用地被覆盖裸露的地面。绿地内实际乔木种植位臵和数量根据实地空间景观效果在现场定位、放样。以达到最佳的观赏效果。 1。7照明:本设计道路等级为城市次干道道路照明的平均照度标准值为15LX。功率密度:07W/?. 2(施工条件 2.1 施工现场土方量大, 2。2 周边存在:建筑物、高压线、苗圃, 2。3 区内道路与区外道路完全畅通有独立的出入口, 2.4 施工临时用水、用电已具备. fication: beforespeci le fixed Liang Xiaduan, and top bolted beam three dimensional adjustment。 3。 basic operation: (1) check the vertical type andent are particularly valued。 2。 technology process: checks for vertical models, specifications, check the box in place, ferruanagemhe height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as mtribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including tmullions used to avoid misat installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the7 第三章 施工部署 1( 组织机构 我项目部本着优质、高效、安全为业主提供满意服务的宗旨将调派具有丰富施工经验、善打硬仗的各部门施工负责人员承担该项目全过程的施工同时接受建设单位与工程监理部门的指导与监督现场组织机构网络如下: 项目经理 项目副经理 项目技术负责人 测实材安资施 工量验料全料 队员员员员员长:::: 各 作 业 班 组 2。施工段划分 结合本工程施工工期紧、质量要求高等特点我项目部精心挑选多支具有丰富施工经验的作业班组加大人员投入 onal adjustment。 3. basic operation: (1) check the vertical type and specification: beforemensichecks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three di er to control, and therefore work both from a technical as well as management are particularly valued. 2。 technology process:s easis correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementimaterials, know exactly what each part of the mullions used to avoid misattribution。 Checks include the following the color iinstallation to be familiar with the drawings, and to be familiar with to order 8 雨合路,绿水湾路农场路,市政工程第四章 施工准备 1.1施工前期准备: 为合理安排工程的材料和设备运输在工程开工前营造一个良好的施工环境我项目部将依靠自身施工的优势在施工准备期间完成如下工作: 1。1。1施工环境准备: 1,根据现场地形、供水、供电情况进行总平面布臵设计。 2,落实现场坐标、水准点及水、电接口的情况。 3,现场平面规划、布臵。 4,现场施工便道、临时用水、电线路和设施布设。 5,现场临时设施、排水措施。 6,做好施工区段内的共用设施保护措施. 1. 1。2技术准备: 1,组建项目管理班子明确分工职责分明。 2,认真组织有关人员了解施工现场熟悉施工图纸领会设计意图阅读施工合同内容和业主的其他规定、要求并议订施工程序。 3,真正了解工程整体精神根据现场施工条件定出最佳方案。 4,对回填土进行分析测试和密实度预测试验选择最佳土质、最佳含水量的土进行回填以达到设计要求。 5,对挖土坡度、填土坡度、结构物支撑等详细验算确保施工的安全稳定性。 6,对施工要点、难点部位进行研讨制定针对性的技术措施。 fication: beforespeci le fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type andent are particularly valued。 2. technology process: checks for vertical models, specifications, check the box in place, ferruanagemhe height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as mtribution。 Checks include the following the color is correct, oxide films if requested;section conforms to design including tmullions used to avoid misat installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the9 7,进行图纸会审并做好记录工作 8,组织有关人员细化施工组织设计。 9,做好各项材料、机械、半成品和劳动力计划。 10,制定各项管理制度编制各项作业指导书。 11,进行多层次的技术、安全、质量、文明施工、现场管理制度交底。 12,根据业主提供的水准点和坐标点做好测量定位桩的引测并采取必要的保护措施消除线位内一切障碍物。 13,对整体范围内的底下管线进行实地详细调查如对施工影响立即准备必要的措施。 14,严格执行材料进场与预算的校对工作制定原材料及成品、半成品的进场材质的交验检查程序杜绝不合格材料的进场使用。 15,组织工人进场后进行现场教育技术交底安全规范教育。制定雨季施工措施并落实到位严格执行。 1。1。3材料准备: 我项目部在入场后即开始进行材料的准备根据施工图计算各种材料数量并结合施工进度计划编制各种材料进场计划表同时材料部门要联系好材料供应商组织好供货渠道保证材料按进度计划有充足的货源对于管材、沥青砼等材料的采购将邀请业主、监理参与对供应商的质量、信誉、生产等进行考察业主、监理认可后方可签订材料采购合同。 对进场的材料必须按规定堆放不同厂家、不同规范、不同出onal adjustment。 3。 basic operation: (1) check the vertical type and specification: beforemensichecks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three di er to control, and therefore work both from a technical as well as management are particularly valued。 2. technology process:s easis correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementimaterials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color iinstallation to be familiar with the drawings, and to be familiar with to order 10 雨合路,绿水湾路农场路,市政工程厂日期的材料要挂牌分开存放材料仓库要切实做好防火、防水浸措施派专人负责管理配臵防火装备杜绝火灾发生。 1,水泥:采用普通硅酸盐32.5级水泥. 2,砂:采用质地坚硬、洁净且细度模数大于2。5的中、粗砂。 3,碎石:采用清洁无土不含石粉及风化杂质抗压强度大于80Mpa最大粒径不大于40MM且含泥量小于2%的多棱角块体。 4,钢筋:钢筋表面应洁净无浮皮、铁锈、油渍等钢筋应平直无局部曲折。 5,水:采用一般饮用水或不含油质、杂质的干净中性水。 1。1。4机械设备准备: 施工机械的配备是工程施工的保证条件。结合本工程的特点我公司在该工程中使用的机械设备进行准备保证届时进场并正常使用拟用于本工程的机械设备详见下表。 主要施工机械设备表 序号 机 具 名 称 规格型号 单位 数 量 性能 31 反铲挖掘机 CAT320、1。5M 台 6 良好 良好 2 自卸汽车 斯太尔15T 辆 20 良好 3 三轮压路机 18,21T 台 4 良好 4 振动压路机 40T 台 2 良好 5 推土机 135KW 台 4 fication: beforespeci le fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type andent are particularly valued. 2。 technology process: checks for vertical models, specifications, check the box in place, ferruanagemhe height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as mtribution。 Checks include the following the color is correct, oxide films if requested;section conforms to design including tmullions used to avoid misat installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the11 3良好 6 装载机 3M 台 1 良好 7 汽车式起重机 16T 辆 1 8 机动翻斗车 1T 辆 4 良好 良好 9 砼搅拌机 400L 台 3 良好 10 砼振捣器 套 3 良好 11 洒水汽车 3000L 辆 1 12 钢筋切断机 QJ401 台 1 良好 良好 13 钢筋弯曲机 WJ401 台 1 良好 14 电焊机 30KVA 台 1 良好 15 打夯机 台 6 良好 16 木工加工机械 套 1 良好 17 钻孔桩机 台 3 良好 18 空压机 台 2 良好 19 潜水泵 台 10 良好 20 污泥泵 台 6 1。1.5工地实验室的准备 1,在施工现场设立工地实验室并配臵专职实验人员及实、测验仪器和机具。 2,工程开工前工地实验室应积极配合技术员做好土的液性、塑性、含水量、密度、击实等试验以及主要材料的进场验证工作。 本工程投入的仪器设备表 onal adjustment。 3。 basic operation: (1) check the vertical type and specification: beforemensichecks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three di er to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process:s easis correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementimaterials, know exactly what each part of the mullions used to avoid misattribution。 Checks include the following the color iinstallation to be familiar with the drawings, and to be familiar with to order 12 雨合路,绿水湾路农场路,市政工程仪器名称 型 号 产 地 数 量 测距仪 Leica-1001 广州 1 经纬仪 J 广州 2 2水准仪 S 南京 2 3砼试模 150*150150 南京 9 砂浆试模 70。770.7*70。7 南京 12 环刀 200 南京 30 台称 南京 2 天平 南京 2 量筒 南京 8 铝盒 南京 40 烘箱 苏州 1 弯沉仪 苏州 1 fication: beforespeci le fixed Liang Xiaduan, and top bolted beam three dimensional adjustment。 3. basic operation: (1) check the vertical type andent are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferruanagemhe height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as mtribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including tmullions used to avoid misat installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the13 1。1.6施工人员准备: 施工人员的合理配备是工程施工进度、质量的重要保证条件为按期、保质完成该工程本工程计划投入的施工人员详见下表: 序人 数序人 数序人 数类 别 类 别 类 别 号 (人) 号 (人) 号 (人) 1 测量员 2 7 材料员 2 13 钢筋工 6 2 技术员 2 8 驾驶员 30 14 木 工 20 3 施工员 4 9 瓦 工 15 15 浇捣工 15 4 资料员 1 10 机修工 2 5 试验员 1 11 电 工 1 6 质安员 1 12 电焊工 2 合 计:104人 onal adjustment. 3. basic operation: (1) check the vertical type and specification: beforemensichecks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three di er to control, and therefore work both from a technical as well as management are particularly valued。 2. technology process:s easis correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementimaterials, know exactly what each part of the mullions used to avoid misattribution。 Checks include the following the color iinstallation to be familiar with the drawings, and to be familiar with to order 14 雨合路,绿水湾路农场路,市政工程第五章 施工平面布臵图及现场管理 1、施工现场平面布臵,如图一示, 五 雨合路施工现场 合 路 施工工地后场 临时设施 fication: beforespeci le fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type andent are particularly valued. 2。 technology process: checks for vertical models, specifications, check the box in place, ferruanagemhe height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as mtribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including tmullions used to avoid misat installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the15 2、施工现场平面布臵,如图二示, 行 知 雨合路施工现场 路 施工工地后场 1、2、1施工用电 根据业主提供的电源在工地周围布臵施工用电杆每隔40米设臵一根。电杆顶上拉三相四线由于线路长三相线采用75m?的380V电源线减少电流损失确保电压另设220V照明专用线两根保证用电安全。且在现场设臵安全总配电箱一只派专人对用电线路进行控制。 1、2、2施工用水 由于建设单位提供水源施工现场全部采用自来水作为施工用水及生活用水。 5、拌合场 onal adjustment。 3。 basic operation: (1) check the vertical type and specification: beforemensichecks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three di er to control, and therefore work both from a technical as well as management are particularly valued. 2。 technology process:s easis correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementimaterials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color iinstallation to be familiar with the drawings, and to be familiar with to order 16 雨合路,绿水湾路农场路,市政工程12灰土、砼和砂浆全部采用道路外集中拌合灰土由自卸车运往施工地点砼和砂浆由翻斗车运往施工地点工地设臵砂、石及搅拌机集中场地. 1、2、3临时排水 由于该工程施工时处于雨季在路床两侧开挖8080CM的临时排水沟以供施工期间排水。 1、2、4临时设施 在即将修建的道路中段搭建彩钢瓦活动板房作为施工现场临时设施内设办公室、会议室、接待室、资料室、试验室等. 2。施工现场管理 2、1划分施工区域和半成品堆放场地保证材料运输逗留畅通调运方便满足施工要求。 2、2符合本工程施工部署、工艺流程要求减少对专业工种和各有关方面的干扰。 2、3对施工区域的日常管理进行通宵执行依法按章进行强有力的管理。 2、4对施工中的运输汽车路线进行划定组织场内有序交通确保车辆的安全。 fication: beforespeci le fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3。 basic operation: (1) check the vertical type andent are particularly valued。 2. technology process: checks for vertical models, specifications, check the box in place, ferruanagemhe height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as mtribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including tmullions used to avoid misat installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the17 第六章 施工进度计划及保证措施 我项目部为,了满足业主的要求将组织多支作业队伍配备足够的劳动力精心组织施工强化计划管理确保本工程按期按质完工。 1、工期承诺 我项目部经过认真研究分析后决定全部工程量确保在139天内完成。 2、施工总进度计划详见表一 年度 2009年 2010年 工程名称 9 10 11 12 1 1、工程准备 2、底基层 3、基层 4、透层、黏层、下封层 5、沥青混凝土下面层 6、钻孔灌注桩 7、浇注桥台及墩台 8、浇注空心板梁 9、安装板梁 10、绿化工程 11、通信管道 12、交通标志 13、路面标志 onal adjustment. 3。 basic operation: (1) check the vertical type and specification: beforemensichecks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three di er to control, and therefore work both from a technical as well as management are particularly valued。 2. technology process:s easis correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementimaterials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color iinstallation to be familiar with the drawings, and to be familiar with to order 18 雨合路,绿水湾路农场路,市政工程3、保证施工进度的措施 3。1按照投标文件中的组织体系成立工程项目部落实各岗位人员。 3。2由于本工程是南京市浦口区经济开发区十分重要的工程也是跨年度工程为确保按期按质完工。本工程施工时我项目部将尽量减少节假日并采用合理的加班措施来缩短工期争取提前完成. 3.3项目部将每星期参加由业主、监理单位组织会同设计单位参加的工程例会及时接受业主的意见积极主动协调各方关系解决施工过程中出现的问题。 3.4根据施工总进度计划编制详细的实施作业计划书面向参加施工班组下达任务和作业持续时间及完成时间。 3.5根据施工总进度计划和实施作业计划编制各种资源供应量计划。 3。6优化施工方案科学组织合理安排。 fication: beforespeci le fixed Liang Xiaduan, and top bolted beam three dimensional adjustment。 3. basic operation: (1) check the vertical type andent are particularly valued。 2. technology process: checks for vertical models, specifications, check the box in place, ferruanagemhe height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as mtribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including tmullions used to avoid misat installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the19 第七章 主要施工方案 3。1 施工测量 3.1。1测量定位 平面及高程控制点均用混凝土浇筑中间埋设金属点并设在不易损坏且通视处.所有控制点的
展开阅读全文
相关资源
相关搜索

最新文档


当前位置:首页 > 生活休闲 > 励志创业


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!