测试原理和测试方法

上传人:可**** 文档编号:252361914 上传时间:2024-11-15 格式:PPTX 页数:16 大小:2.28MB
返回 下载 相关 举报
测试原理和测试方法_第1页
第1页 / 共16页
测试原理和测试方法_第2页
第2页 / 共16页
测试原理和测试方法_第3页
第3页 / 共16页
点击查看更多>>
资源描述
Click to edit Master text styles,Second level,Third level,Fourth level,Fifth level,Mobile Fronthaul Testing,Confidential&Proprietary Information of VeEX Inc.,#,eCPRI Primer,Be Ready to Participate in the Conversation,Rev.A October 2017,Base station functions are co-located with the radio tower at the base of the antenna or basement of a tall building.,Drawbacks of co-location:,RF and Baseband Processing are co-located at the base of the tower.,Needs to be physically located very close to the antenna because they are driven over very lossy electrical cables.,High power dissipation require costly special enclosures with climate control and power redundancy,Makes it difficult to install and find a location that can host the enclosure and/or increase lease price due to additional space needed,Traditional Macro-cell,Information of VeEX Inc.,2,Electrical Cable,Cell Site Cabinet,Mobile,Backhaul,RF,BB,Separation of RF and Baseband processing.,Simplified function makes it more,compact,easier to install and therefore increases the number of possible sites,Fiber Link replaces COA,Less power required at the cell site,Less processing and power requirements at the cell site,Smaller footprint,easier to find sites,Fiber allows great distance between the RRH and BBU location.,All BBUs located at the CO.,CPRI/OBSAI Fronthaul Network,Information of VeEX Inc.,3,Fiber,Mobile,Backhaul,RF,BB,Mobile,Fronthaul:CPRI/OBSAI,Mobile Fronthaul Testing,Confidential&Proprietary Information of VeEX Inc.,4,Evolution of Mobile Fronthaul:eCPRI,Why eCPRI?,CPRI requires high data rate,This is not scalable for 5G traffic,eCPRI is designed to meet the needs for 5G,Improves bandwidth efficiency,Increases capacity,eCPRI uses packet-based transport network,IP or Ethernet,eCPRI uses packet based transport network IP or Ethernet:,using a switched or routed mobile fronthaul network makes it more flexible,eCPRI uses existing standards for,Transport Network Layer(Ethernet/IP),Synchronization(SyncE/PTP),C&M (SNMP,Ethernet OAM),eCPRI introduces a functional split for baseband processing between BBU and RRH.,The Functional Split defined in the protocol adapts to the application.,It is a tradeoff between latency requirements and bandwidth reduction,Mobile Fronthaul Testing,Confidential&Proprietary Information of VeEX Inc.,5,How does eCPRI achieve this?,Front Haul Evolution,Information of VeEX Inc.,6,Mobile,Backhaul,BBU Pool,CPRI/OBSAI Fronthaul,RF,RF,RF,BB,BB,BB,BB,Mobile,Backhaul,BBU Pool,RF,BB,BB,BB,BB,BB,RF,BB,RF,BB,eCPRI Fronthaul,eRE=eCPRI Radio Equipment(Remote Radio Head),eREC=eCPRI Radio Equipment Controler (Baseband Unit),3 data flows between RE and REC:,Synchronization traffic(1588 PTP),Control and Management Traffic,User Plane traffic(I/Q samples),Mobile Fronthaul Testing,Confidential&Proprietary Information of VeEX Inc.,7,eCPRI Elements,eRE,eREC,BBU,Synchronization,C&M Data,User Plane data(I/Q),RRH,Mobile Fronthaul Transport Network,eCPRI Protocol Stack,Mobile Fronthaul Testing,Confidential&Proprietary Information of VeEX Inc.,8,Ethernet PHY,Optional IP/UDP,eCPRI Protocol,I/Q User Data,eCPRI Physical Layer,Mobile Fronthaul Testing,Confidential&Proprietary Information of VeEX Inc.,9,The following Ethernet interfaces are allowed in the standard:,How is eCPRI data Framed?,Mobile Fronthaul Testing,Confidential&Proprietary Information of VeEX Inc.,10,Option 1:eCPRI over Ethernet,Option 2:eCPRI over IP/UDP,Destination MAC,Source MAC,Type=AEFE,Ethernet Payload,CRC,eCPRI Header,eCPRI Payload=I/Q data or control data,Optional,VLAN,New eCPRI Ethertype,MAC Header,IP Header,UDP Header,Ethernet Payload,CRC,eCPRI Header,eCPRI Payload=I/Q data or control data,Optional,VLAN,Standard defines eCPRI messages for One-Way Delay Measurement between eRE/eREC,eCPRI One-Way Delay measurement requires that both ends are time synchronized to the same source,eCPRI One-Way Delay uses Delay request/Follow-up and Delay Response mechanism,Mobile Fronthaul Testing,Confidential&Proprietary Information of VeEX Inc.,11,One-Way Delay Measurement,Mobile Fronthaul Testing,Confidential&Proprietary Information of VeEX Inc.,12,eCPRI Synchronization,eCPRI node are frequency and phase synchronized,eRE/eREC synchronization path can be different from data path,eRE/eREC synchronization from PTP/SyncE,eRE synchronization requirement more strict than eREC,because eRE generates frequency for air transmission,PTP Synchronization per ITU-T Telecom Profile,Mobile Fronthaul Testing,Confidential&Proprietary Information of VeEX Inc.,13,eCPRI Synchronization Testing Requirements,Source:Requirements for the eCPRI Transport Network,Defined in the eCPRI Transport Network Requirements shall meet the following the following criteria:,Mobile Fronthaul Testing,Confidential&Proprietary Information of VeEX Inc.,14,Transport Network Testing Requirements,RoE Standard:IEEE 1914.3 CPRI encapsulated into Ethernet,In Process of being standardized with planned 2017 release,RoE takes existing CPRI frames and encapsulate
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 图纸设计 > 开题报告


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!