(精品)volvo_10ReviewofITSDevelopmentsinChina

上传人:无*** 文档编号:247906248 上传时间:2024-10-21 格式:PPT 页数:29 大小:696.50KB
返回 下载 相关 举报
(精品)volvo_10ReviewofITSDevelopmentsinChina_第1页
第1页 / 共29页
(精品)volvo_10ReviewofITSDevelopmentsinChina_第2页
第2页 / 共29页
(精品)volvo_10ReviewofITSDevelopmentsinChina_第3页
第3页 / 共29页
点击查看更多>>
资源描述
Click to edit Master title style,Click to edit Master text styles,Second level,Third level,Fourth level,Fifth level,*,Review of ITS Developments in China:Progress and Perspectives,Prof.Lu,Huapu,Institute of Transportation Engineering,Tsinghua University,2003,Main Contents,Backgrounds,Characteristics and Situation of ITS Developments in China,Current/Upcoming ITS Planning,The ITS projects of Transportation Engineering Institute at Tsinghua University,Problems and Challenges,Perspectives of ITS in China,1.Backgrounds,Traffic problems get more and more serious,Fast increasing of vehicles,Energy sources waste,Safety and environment,Development of some advanced techniques,The Comparison for Growth Rate of Vehicles and Roads,Traffic Situation on 3rd Ring In Beijing,Urban Road Traffic Situation in Beijing,Traffic situation at the intersection in,Ningbo,Measures to Urban Traffic Problems,Land use pattern,Integrated comprehensive transport systems:change the modal split,Improvement of road traffic,Travel demand Management.,Measures to Urban Traffic Problems,Priority for development of public transport(Investment,Management,Improving of service level),Strength the traffic engineering,Extensive traffic education,Enforcement is strictly done;,High technologies are taken extensively;,Travel demand Management.,2.Characteristics,Transport infrastructures,In China,large-scale transport infrastructure construction is at an early stage,the software and the hardware of ITS can be integrated,simultaneously,.,Some,necessary conditions of ITS deployment,are not,mature,.,Research foundation,The accumulations of ITS research achievements are not enough.,It is necessary to absorb all of the experiences from overseas and incorporate the situations of China.,2.Characteristics,ITS deployment environment,The travelers violate traffic regulations frequently,.,Therefore,the effects of the ITS deployments in China is not so satisfactory as in the developed countries,But in China,the target of ITS research and deployments is not only to enhance the traffic capacity but also to regulate the behaviors of travelers.,4.ITS Development,Activities,1997,97 Beijing International Conference on Intelligent Transport System,Beijing.,2000,The 4th Asia-Pacific ITS Conference,Beijing,2002,2nd Beijing International Symposium on ITS Technology and Exhibition,2002,2002 national symposium,on shared information platform of ITS,2003,2003 national symposium,on traffic information collection,fusion and mining.,4.ITS Development,Research,In“Ninth Five-Year”,Ministry of Public Security research:,Traffic management dynamic and static information system,Parking guidance system,4.ITS Development,Research,In“Ninth Five-Year”,Ministry of Public Security research:,Traffic monitor system,GPS police car location,122 traffic incident fast management system,4.ITS Development,System establishment,Since 1996,establish the traffic management center,Beijing,Shanghai,Hangzhou,Dalian,Guangzhou,etc.,Advanced public transport system,GPS,GIS,GSM application in road transport,Application of traffic management integrated information in Beijing,Traffic management integrated information system,Traffic,command,&dispatch,system,Traffic,enforcement,system,Traffic,information,system,Traffic,management,decision-making,system,4.ITS Development,5.,Current/Upcoming ITS Plans,MOST(Ministry of Science&Technology),Ministry of Communication,The ministry of public security PR China,National Development&Reform Commission,Ministry of Railway,5.1,MOST(Ministry of Science&Technology),In“Tenth Five-Year”,there are 16 sub-project and 10 ITS demonstration cities,.,ITS Projects:,ITS project evaluation method research,Expressway travel capability research,Traffic information collection and fusion technique research,Urban public transport system optimization technology research,ITS data management technique research,The application and demonstration projects of ITS,ITS Projects(continued),The ITS exploitation and application of Beijing“Technological Olympic”,The research and application of the ETC(Electronic Toll Collection)/Electronic Defrayal System on the artery of National Road and Inter-Province Road,The exploitation of ITS application software independent intellectual property(Tsinghua University),On-board safety assistant device development,(Tsinghua University),On-board information device development,ITS Projects(continued),DSRC(Dedicated Short-Range Communications)device development,Traffic information collection device development,Development strategy and standard research,ITS Architecture support system development and technology track,ITS social environment architecture construction,Demonstration cities,Demonstration cities:,Beijing,Shanghai,Guangzhou,Hangzhou(Committed,to Tsinghua University),Tsingdao,Jinan,Zhongshan,Tianjin,Shenzhen,Chongqing,Main Demonstration Cities Introduction,Beijing:,Public transport operating and dispatching system,Intelligent traffic management system,Parking guidance s
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 管理文书 > 施工组织


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!