降低喷漆治具成本DMAIC

上传人:ll****x 文档编号:242919074 上传时间:2024-09-11 格式:PPT 页数:37 大小:5.02MB
返回 下载 相关 举报
降低喷漆治具成本DMAIC_第1页
第1页 / 共37页
降低喷漆治具成本DMAIC_第2页
第2页 / 共37页
降低喷漆治具成本DMAIC_第3页
第3页 / 共37页
点击查看更多>>
资源描述
Click to edit Master title style,Click to edit Master text styles,Second level,Third level,Fourth level,Fifth level,*,*,Team Introduction,Opportunity / Business Case / Project Scope,Target Setting And Schedule,Project Implementation,Accomplishments / Results,Team Members Of Contact Information,Table of C,ontent,1,Team Introduction,Opportunity / Business Case / Project Scope,- Background,- The Introduction Of Painting Process,- Project Scope,Table of C,ontent,2,Industrial pollution damages our environment significantly.,Background,3,Green house effect Icebergs are disappearing.,Penguins are looking for home.,“I want to go home!”,Daddy,where,is our home?”,“I dont know”.,Background,4,Our commitment to supporting environmental protection of air, water, land, waste and natural resources is, and will remain, a priority for this company.,Environmental Policy,Reduce the paints,waste and material waste,Background,5,The introduction of painting process,During production,:,spraying gun spray,After production:,disassembly products and recycle fixture,Cause paints waste,Cause,fixtures,waste,Preparation:,Assembly of raw parts to fixture,raw-part,Paint,fixture,f,inished parts,Paint,waste,used fixture,Output,Input,6,PAINTS WASTE,FIXTURE,WASTE,Need to recycle,According to,e,nvironmental,impact,RPN,evaluation, painting factory conclude to improve:,Project Scope,Need to reduce,7,Team Introduction,Opportunity / Business Case / Project Scope,Target Setting And Schedule,Project Implementation,Accomplishments / Results,Team Members Contact Information,Table of C,ontent,8,1. Reduce the emission of paints by 20%,2. Improve fixture recycle times by 50%,Before,After,Aiming for saving of paint usage of the gap between the two parts.,Increase fixture recycle period from 2 times to 3 times,150mm,30mm,30mm/150mm=20%,Target Setting,Improvement,After 3X,Before 2X,9,plan,actual,08-,Aug,08-Oct,08-Nov,08-Dec,09-Jan,09-Feb,Item,Scope,Status Overview,Root Cause analysis,Solution,Data collection,Efficiency,Standardization,Plan Schedule,0,8-Sep,10,G-ray,(Rim Blackberry-8000),Nicole,(Sony Ericsson,K,530i),J,ie (Sony Ericsson,K,630c),A,alto (Nokia N95),Meteor,(Rim Blackberry-9000),08-Oct,08-Nov,08-Dec,09-Jan,09-Feb,plan,actual,Project Schedule,08-Sep,Project name,11,Team Introduction,Opportunity / Business Case / Project Scope,Target Setting And Schedule,Project Implementation,-,R,educe,Paints Waste,-,Fixture Recycle Times,Table of C,ontent,12,Pa,ints,W,aste,Man,Method,Environment,Material,Machine,Not follow SOP,Insufficient training,change paints,mixing ratio,Wrong fixture,design,Parameter is,not correct,Air pipe,drop off,Color,unstable,Raw parts,cleanliness,Clean room,cleanliness,Booth pressure,too high,Booth,Temperature,too high,Booth,Humidity,(40%70%),1.1 Root Cause Analysis,Spray pressure,too high,Painting,Direction,Fixed,Fixture,cleanliness,Controlled,Without control,1.,Reduce Paints Waste,13,1.2 Status Overview,1.,Reduce Paints Waste,The fixed spraying gun lead to paints waste,between two spindles,Spray Gun,Video = Fix Painting Spray Gun,Cause Paints Waste,Gap,14,1.3 Solution,Robot Spay Painting,1.,Reduce Paints Waste,Robot spray gun,can reduce,the problem of,paints waste,Video of,Painting,robot,Each spray gun track a single spindle and spray, which will save paint between two parts.,15,1.4 Data Collection,Parts,Q,ty (PCs),Before Improvement (g/pcs),After,Improvement (g/pcs),Improvement (,Save,) %,Total Save (g),PAINTS,THINNER,PAINTS,THINNER,PAINTS,THINNER,PAINTS,THINNER,R/H,244545,1.62,1.78,1.296,1.424,20%,20%,79219.5,87042.5,B/D,209492,1.62,1.78,1.296,1.424,20%,20%,67832.2,74531.6,Cap bottom,212433,0.81,0.89,0.648,0.72,20%,19%,34408.8,36108.2,Total,666470,/,/,/,/,/,/,181460,197682,Paints save 20%,Paints reduce in Sep.,Take the GAMMA-RAY as an example,1.,Reduce Paints Waste,16,1.,Reduce Paints Waste,GAMMA-RAY R/H,B/D &,BOTTOM,20%,GAMMA-RAY R/H,GAMMA-RAY B/D,GAMMA-RAY BOTTOM,1.4 Data,Collection,Paints reduce in Sep.,unit: g/pcs,17,Quality?,1.,Reduce Paints Waste,18,Yield rate comparison between robot and fixed gun,1.5 Quality Confirmation,GAMMA-RAY,robot painting yield rate,in Sep vs,fixed painting in Aug.,1.,Reduce Paints Waste,Very close yield rate !,19,1.,Reduce Paints Waste,Continuous,I,mprovement,A,nd,U,pdating BOM,Updating BOM: Paints : from 1.62g/pcs to 1.296g/pcs Thinner : from 1.78g/pcs to 1.424g/pcs,20,S,tatistically,we,reduced paint,s,waste with robot,spray gun,to reach our target, while,maintaining,good,product quality at the same time,.,Next we will,introduce how to,improve the fixture recycle times,.,1.,Reduce Paints Waste,21,2.1 Status Overview,2. Fixture Recycle Times,Fixture Quantity (A),94021pcs,Assembled Quantity,(per fixture) (B),26pcs,Painted Quantity (C),4889092pcs,Recycle Times (D),A,*,B,C,D=,=2,Aug-2008 G-ray,s Data,Less fixture recycle times resulted,large quantity fixture waste,22,Machine,Man,Methods,Environment,Material,Insufficient Recycle Times,The amount of fixture exhaust is big,Unit fixture production capacity is lower,Less fixture projects,The fixture machine is well controlled,Fixture surface is dirty,Storage environment is dirty,Fixture supplier quality control is not well,Without the declare of reducing the cost,The lower conscious of reducing fixture cost,Fit situation is not well,Operation method not well to know,Fixture design is un-suitable,Hard to assemble the fixture,The fixture fees take about 70%,Fixture Waste,Be lack of education,2.2 Root Cause Analysis,2. Fixture Recycle Times,Controlled,Without Control,23,2.3 Solution,2.,Fixture,Recycle Times,Test fixture,maximum,recycle times,Fixtures,rework,Decrease fixture usage quantity,Elimination of exhaust emission,Increase fixture cycle times,?,?,?,24,2.3.1 Test The Maximum Recycle Times Of Fixtures,2.,Fixture Recycle Times,1.3,G-ray Volume Key Bottom Cover Test In Sep. 2008 Scrap %,Quality contrast,Times,Defect,Particle,Fiber,Covering,Paint peel,Orange peel,Grease,Poor Coverage,Total,2th,1.9,0.6,0.2,0.2,0,0.1,0.1,3.1,3th,1.9,0.7,0.1,0.2,0.1,0.1,0.1,3.2,4th,1.8,0.7,0.3,0.2,0.1,0.1,0.1,3.3,5th,1.9,0.6,0.3,0.3,0.1,0.1,0,3.3,6th,2.1,0.7,0.4,1.3,0.3,0.2,0.1,5.1,7th,4.1,0.5,1.2,2.4,0.2,0.3,0.1,9.3,25,2.3.2 Fixtures Rework,Before Without,Sticker,After With,Sticker,Add sticker on the hole,Example: G-ray Volume Key Bottom Board Fixture,2.,Fixture,Recycle Times,Simple rework like adding,s,ticker upon the fixtures will,extend the maximum recycle times,.,26,2.3.2. Fixtures Rework,G-ray Volume Key Bottom Cover In Sep. 2008 Scrap %,2.,Fixture,Recycle Times,Quality contrast,Times,Defect,Particle,Fiber,Covering,Paint peel,Orange peel,Grease,Poor Coverage,Total,5th,1.8,0.7,0.3,0.2,0.1,0.1,0.1,3.3,6th,1.9,0.6,0.3,0.3,0.1,0.2,0.1,3.4,7th,2.2,0.8,1.2,0.4,0.3,0.4,0.3,5.6,8th,2.8,1.1,3.6,1.2,0.2,0.3,0.3,9.5,27,The results of the GMMA-RAY fixture improvement,Painted quantity(10k),Recycle times(2),*,Assembled quantity(26 pcs),=,193 fixtures * Weight(0.0202kg)=3.8986kg,10K production of Volume Key Bottom Cover as an example,Recycle times(6)*Assembled quantity(26 pcs),=,65 fixtures,* Weight(0.0202kg)=1.3130kg,Painted quantity(10k),VS,Reduce,2,.5856kg/10K,Increase rate66.3%,reach our,aimed target,(,Before,),(,After,),2.,Fixture,Recycle Times,66.3%,28,Standardize in WI,2.,Fixture,Recycle Times,29,Team Introduction,Opportunity/Business Case/Project Scope,Target Setting And Schedule,Project Implementation,Accomplishments / Results,Team Members Contact Information,Table of C,ontent,30,More projects are applying the above-mentioned improvement with different accomplishments.,Accomplishments/Results,31,Part,PAINTS,FIXTURE,Before (kg),After (kg),Decrease Percent,Before (pcs),After (pcs),Decrease Percent,Blackberry 8000,5548,4438,20%,671719,268617,66%,Blackberry 9000,3460,1984,43%,106289,35429,66%,K530i,6508,4937,24%,82747,55165,33%,K630i,1117,796,28%,11944,5972,50%,N95,1069,891,17%,12881,7041,45%,Total,17702,12076,31%,885580,340324,61%,The,R,esults,O,f,T,he,P,aints,A,nd,F,ixture,I,mprovement,F,rom,Sep.08,T,o Feb.09,Applying projects results: Blackberry 8000, K530i, K630c, N95, Blackberry 9000,Accomplishments/Results,32,1.Reduce paints waste by:,Tracking Robot,2.Reduce material waste by: Increase Fixture Recycle Times,Accomplishments/Results,33,One World,One,Jabil One Dream,Accomplishments/Results,34,I,m finally home.,Beautiful Homeland,Hey! Lets Have Fun! Thank You JABIL,Lets go swimming,Accomplishments/Results,35,Team Introduction,Opportunity / Business Case / Project Scope,Target Setting And Schedule,Project Implementation,Accomplishments / Results,Team Members Contact Information,Table of C,ontent,36,Thank you,The resource is limit, while the value we can create is unlimited. We are obligated to make good use of the limited resource to create more value.,37,
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 图纸专区 > 课件教案


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!