资源描述
,Click to edit Master title style,Click to edit Master text styles,Second level,Third level,Fourth level,Fifth level,*,One company unlimited solutions,Corporate,cosl钻台图解演示文稿,cosl钻台图解演示文稿,1,National Oilwell,Derrick Equipment Package(DEP),BOP Handling System,Mud mixing and conditioning system,Jacking System,National OilwellDerrick Equipm,2,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,Derrick package,Jacking system,Mud System,OVERVIEW,BOP Handling,COSLDerrick packageJacking sys,3,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,DEP to Cantilever,Pipehandling Crane to Cantilever,Important Interfaces,Catwalk machine to Pipedeck,BOP Handling to Cantilever,Jacking system to Hull,Power Interfaces.,Piping Interfaces,Control systems,COSLDEP to CantileverPipehandl,4,National Oilwell Project Organization ChartCOSL HaiYang ShiYou 941 Jack-up,Chen Lisheng,Technical Manager,COSL,Luo Youan,Project Control Manager,COSL,*Eric Clifford mob to China July,National Oilwell Project Organ,5,Key dates,NO.,Activities,Contract Key Dates,1,Completion of Primary Structural Steel MTO,Within 2 months after Contract Award,2,Ready for delivery,April 14,2005,3,Arrival at SHIPYARD,May 15,2005,4,Completion of installation on the Cantilever,June 2,2005,5,Commencement of Hook-up Between DEP and other equipment of the Jack-up at Shipyard,June 3,2005,6,Completion of Hook-up Between DEP and other equipment of the Jack-up and Mechanical Completion of DEP,August 10,2005,7,Completion of DEP Commissioning,January 20,2006,Key datesNO.ActivitiesContract,6,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,Derrick with equipment,Pipehandling Crane,Derrick Equipment Package(DEP),Drillfloor and Substructure,COSLDerrick with equipmentPipe,7,DEP Scope Of Supply,Rotary Table,Hydraulic Slips,Catheads,Utility Winches,Manrider Winch,Wireline Unit,Mud-Gas Separator,Drill-Line,Standpipe Manifold,Cement Manifold,Bug Blowers,HP Mud Pumps,Mud Pump Motors,HP Mud System Interface,Pipe Handling Crane with Gripper Yoke,Horizontal Pipehandling Machine,Drillfloor,Substructure,Tubular Tailing Arm,Vertical Pipehandling Machine,Fingerboards,Iron Roughneck,8 5/8 Casing Tong,20 Casing Tong,Mousehole,Mud Bucket,Drillers Cabin,Drilling control and monitoring system,Anti-Collision System,CCTV System,Network Interface,Choke and Kill Manifold,Derrick,Crown Block,Travelling Block,Casing Stabbing Basket,Racking Board Winch,Derrick Lighting,Safetly Devices,Drawworks,Drawworks Motors,Top Drive,Rotary Hoses,Elevator,Retract Dolly,Deadline Anchor,Drill Line Reel,HPU,DEP Scope Of SupplyRotary Tabl,8,Drillfloor Layout,Plan View of Drillfloor,Plan View of Drillfloor Roof,Setback area for 312,5”stands,5,9 ”Stands,6,8”Stands,Drillfloor LayoutPlan View of,9,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,1891 Knuckle-boom Crane,20T SWL Catwalk Machine,COSL1891 Knuckle-boom Crane20T,10,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,HydraRacker X-Y,Iron Roughneck,HydraTong,Pipe Tailing Arm,Drillers Cabin,Drillfloor,Drill line Spooler,Powered,Mousehole,COSLHydraRacker X-YIron Roughn,11,Standbuilding Animation,Standbuilding Animation,12,INTRODUCTION,SYSTEM TOPOLOGY,Drilling Instrumentation,SDI,Cyberbase A,Video signals,Work stations,CCTV control panel,Profibus FDL redundant network,NT,Server,PLC,NT,Server,PLC,PLC,PLC,DP,Remote IO Module in Mud Area,Company Man,Toolpusher,DB log server,Onshore Link&HAWK Support,Drill PLC(DCI),-HPU,-HVAC,-Slips,DP,PLC,PLC,Drawwork PLC,-Automatic Driller,-MCC Interface,-Mud Pumps,-Rotary Table,Pipehandling PLC,(X-Y)Hydra racker,Top Drive,-Elevator,PLC,Switch,HUB,PLC,Iron Roughneck,Catheads,Cyberbase B,INTRODUCTION SYSTEM TOPOLOGY,13,EQUIPMENT,DRAWWORK SSGD 750,FEATURE:,SSGD(Single Speed,Gear Driven)no chains,transmission,clutches,gearboxes,4 x 1150 HP AC-motors,Performance comparable to Conventional Drawworks,Increased control of load for all operations by using AC-motors,Full usage of motors torque and speed characteristics,Simple Design -Fewer Components -Reduced Maintenance -Reduced Down time,Small Footprint&Light Weight,Wire rope life improved due to larger drum.,Easy installation -Few parts -Few interface points,Noise insulated,Reduced noise,AC Motors used for Primary Braking no free fall,Sophisticated control system,EQUIPMENT DRAWWORK SSGD 750F,14,FEATURE:,Designed according to API 8C,PSL1,Lifting capacity=750 tons,1150 hp AC-motor#64.175 ft.lbs continous 260RPM,Rigid gearbox design incl./helical cut gears,separate top bearings and tripple to seals,Short built in height,Encased service loop,Forced gearbox cooling system,EQUIPMENT,TOPDRIVE type HPS 750 E AC,FEATURE:EQUIPMENT TOPDRIVE t,15,BOP Handling,125 ton BOP Crane,2 x 17,5 ton Service Crane,2 x125 ton BOP Skids,BOP Handling125 ton BOP Crane2,16,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,Knuckle-boom-Crane Loading Pipe Into Catwalk Machine,Standbuilding,COSLKnuckle-boom-Crane Loading,17,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,X-Y Column Racker Picks Up,Single from Catwalk Machine,Standbuilding,COSLX-Y Column Racker Picks Up,18,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,X-Y Column Racker Places,Single In Hydraulic Mousehole,Standbuilding,COSLX-Y Column Racker Places S,19,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,X-Y Column Racker Lowers,Single into Hydraulic Mousehole,Standbuilding,COSLX-Y Column Racker LowersSt,20,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,X-Y Column Racker pipes up,second single from Catwalk Machine,Standbuilding,COSLX-Y Column Racker pipes up,21,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,X-Y Column Racker Places,Single on top of Single in,Mousehole,Standbuilding,COSLX-Y Column Racker Places S,22,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,Iron Roughneck,Makes Up Connection,Standbuilding,COSLIron RoughneckStandbuildin,23,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,XY Racker removes double from,Mousehole,Standbuilding,COSLXY Racker removes double f,24,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,XY Racker Places double in aux.,Fingerboard,Standbuilding,COSLXY Racker Places double in,25,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,XY Racker picks up third single,From Catwalk Machine,Standbuilding,COSLXY Racker picks up third s,26,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,XY Racker places single in,Mousehole,Standbuilding,COSLXY Racker places single in,27,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,XY Racker place double on top,of single,Standbuilding,COSLXY Racker place double on,28,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,Iron roughneck makes up,connection,Standbuilding,COSLIron roughneck makes up St,29,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,XY Racker rotates to fingerboard,Standbuilding,COSLXY Racker rotates to finge,30,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,XY Racker rotates to fingerboard,Standbuilding,COSLXY Racker rotates to finge,31,COSL,Haiyang Shiyou 941,400 Drilling Rig Project,XY Racker places stand in finger-,board,Standbuilding,COSLXY Racker places stand in,32,
展开阅读全文