资源描述
,Click to edit Master title style,Click to edit Master text styles,Second level,Third level,Fourth level,Fifth level,#,ENG,May 18,2013,Reference,Project name,part name,ESI,Company,Reported by:,When:,Version:,Part thumbnail,Alec.Luo,ENG,May 18,2013,DFM report before MCF Phase,Project name,part nameESI C,1,Summary of opening critical,issues,Last Filename(version),Related aspects,Issue description,Proposal,Closed(date),Gate solution,Main wall thickness optimization,Part released,Mold close,Agreed product feasibility,(to be signed),name,Comments,date,DFM Supplier(Mold maker),mold engineer(NPI),2,Summary of opening critical is,snapshot,of email about parts development plan from Philips mold engineer.,milestones,date,PCF,Wk,MCF,Wk,PC,Wk,Part,development plan,3,snapshot of email about parts,4:Outputmolding study,P.,E1:proposed,molding solution,for single part.,10,E2:,proposed,Mold layout&injection machine,11,E3:(output,detail),12,E4:,Conclusion about current wall thickness design,13,5:Output-mold construction study,F1:proposed,sequence of surfaces released,14,f1.1 (output detail),15,F2:,proposed,sequence of surfaces closing,16,f2.1:(output detail),17,F3:,Conclusion about mold construction of current design,18,6:Postscript,1:Status,p.,Summary of opening critical issues,2,Part development plan,3,2:Table of content,4,3:Information Input,A:,Geometry received,5,A1:Geometry delivery history record,6,B:,m,aterial decision,7,C,:,Visual surfaces requirement,8,D:,Assembly relationship,9,Table of,Content,4,4:Outputmolding studyP.E1:p,A:,Geometry received(updated 3D),product overview(size&appearance,features),Input,5,A:Geometry received(updated,Input,A1:,Geometry,delivery history record,No.,Date,File name,thumbnails,6,InputA1:Geometry delivery hi,B:,Material,selection,for this part,Input,Item,1,st,shot,2,nd,shot(if needed),1,Resin family name,2,Trade name,3,Resin manufacturer,4,Additives(glass,mineral,etc.),5,Recommended shrinkage rate(range),6,Index of Melt Flow,g/min,7,Recommended Melt temperature,C,8,Recommended Mold temperature,C,9,Specific Gravity(density),10,Color/transparency,11,Micro-Structure,12,Other character,7,B:Material selection for th,C,:Visual,surfaces,requirement,Input,8,C:Visual surfaces requireme,Input,D:Assembly relationship:,show pictures about this part to assembly with which parts in the product.,9,InputD:Assembly relationship:,Proposal agreed by,Name:,OK/NOK,comments,Date(yyyymmdd),mold engineer,product designer(MDD),Proposal properly implemented or not,check by supplier,OK/NOK,File name,date,E,1,:proposed molding solution,for single part,(proposed,gate position,method&size,runner)+(current wall thickness distribution),10,Proposal agreed byName:OK/N,Proposal agreed by,Name:,OK/NOK,comments,Date(yyyymmdd),mold engineer,product designer(MDD),Proposal properly implemented or not,check by supplier,OK/NOK,File name,date,E2,:,proposed,Mold layout&injection machine,11,Proposal agreed byName:OK/N,Proposal agreed by,Name:,OK/NOK,comments,Date(yyyymmdd),mold engineer,product designer(MDD),Proposal properly implemented or not,check by supplier,OK/NOK,File name,date,E,3,:(output detail),12,Proposal agreed byName:OK/N,E,4,:,Conclusion about current wall thickness design,Proposal agreed by,Name:,OK/NOK,Comments,Date(yyyymmdd),mold engineer,product designer(MDD),Proposal properly implemented or not,check by supplier,OK/NOK,File name,13,E4:Conclusion about current w,F,1,:proposed,sequence of surfaces released,(,including,proposed parting lines.),agreed by,Name:,Agree,Or disagree,comments,Date(yyyymmdd),mold engineer,14,F1:proposed sequence of surfa,f1.1:,(output detail),agreed by,Name:,Agree,Or disagree,comments,Date(yyyymmdd),mold engineer,15,f1.1:(output detail)agreed b,F,2,:,proposed,sequence,of surfaces closing,Proposal agreed by,Name:,OK/NOK,Comments,Date(yyyymmdd),mold engineer,product designer(MDD),Proposal properly implemented or not,check by supplier,OK/NOK,File name,Common question:will,parting,surfaces be secured enough during mold closing?,16,F2:proposed sequence of surfa,Proposal agreed by,Name:,OK/NOK,Comments,Date(yyyymmdd),mold engineer,product designer(MDD),Proposal properly implemented or not,check by supplier,OK/NOK,File name,f2.1:,(output detail),17,Proposal agreed byName:OK/N,agreed by,Name:,Agree,Or disagree,comments,Date(yyyymmdd),mold engineer,product designer(MDD),F3:conclusion,about,mold construction of current design,18,agreed byName:AgreecommentsDa,This,report should not be,used,accordingly,for mold,making,once,any information input,remarked,in segments A,B,C D changed.,Note:,19,This report should not be used,1:,gate solution hasnt been,agreed,by designer.,(gate position,method runner),2:,there are main wall thickness issues.,(,uneven main flow,tunnel(,injection&packing),thin wall,part(injection),cooling),3:solution of part released hasnt been agreed by NPI mold ENG.,(sequence of surfaces released,surface finish,parting lines,undercuts&ejecting,),4:solution of mold close,hasnt been,agreed b
展开阅读全文