Maintenance-and-Resurfacing-Funding维护和置换资金ppt课件

上传人:29 文档编号:252794498 上传时间:2024-11-20 格式:PPT 页数:39 大小:4.99MB
返回 下载 相关 举报
Maintenance-and-Resurfacing-Funding维护和置换资金ppt课件_第1页
第1页 / 共39页
Maintenance-and-Resurfacing-Funding维护和置换资金ppt课件_第2页
第2页 / 共39页
Maintenance-and-Resurfacing-Funding维护和置换资金ppt课件_第3页
第3页 / 共39页
点击查看更多>>
资源描述
Click to edit Master title style,Click to edit Master text styles,Second level,Third level,Fourth level,Fifth level,*,Steve Varnedoe,Condition Assessment&Funding Needs,for,North Carolinas Highway System,North Carolina Department of Transportation,Report to the,Joint Legislative Transportation Oversight Committee,January 14,2003,Steve VarnedoeCondition Assess,1,Condition Assessment&Funding Needs For North Carolinas Highway System,Reporting Requirements,Overview of the System,Assessment Methodologies,Current Conditions,Funding Needs,Maintenance Operational Improvements,Condition Assessment&Funding,2,Biennial Report on Maintenance Requirements.G.S.136-44.3,The annual cost of routine maintenance,The cost of eliminating maintenance backlog,Annual resurfacing cost based on a 12-year cycle for primary roads and a 15-year cycle for other systems,The cost of eliminating any resurfacing backlog,Biennial Report on Maintenance,3,Since the Highway Trust Fund was enacted:,1989,76,808 road miles,127,809 paved lane miles,16,104 miles of unpaved roads,16,900 structures,61.1 M sf bridge deck area,2003,78,347 road miles,155,960 paved lane miles,6,644 miles of unpaved roads,17,463 structures,72.3 M sf bridge deck area,North Carolina State Highway System,Since the Highway Trust Fund w,4,Highway System Growth,(Paved Lane Miles),System Growth,Highway System Growth(Paved L,5,Bridge System Growth,(Square Feet of Bridge Deck),Deck Area Growth,Bridge System Growth(Square F,6,Highway System Usage,(Vehicle Miles Traveled),Growth,Highway System Usage(Vehicle,7,Rating the Condition of the Highway System,Maintenance Condition Survey,Bridge Condition Survey,Pavement Condition Survey,Rating the Condition of the Hi,8,Maintenance Condition Elements,Roadway,Low Shoulder,High Shoulder,Lateral Ditches,Lateral Ditch,Erosion,Drainage,Crossline Pipe,Driveway Pipe,Curb&Gutter,Catch Basin&Drop Inlets,Other Drainage Features,Roadside,Mowing,Brush and Tree Control,Litter&Debris,Slope,Guardrail,Traffic Control,Devices,Traffic Signs,Pavement Striping,Words and Symbols,Pavement Markers,Environmental,Turf Condition,Miscellaneous Vegetation Management,Pavement,Flexible,Rigid,Bridge,Decks,Rails,Expansion Joints,Superstructure,Substructure,Maintenance Condition Elements,9,Maintenance-and-Resurfacing-Funding维护和置换资金ppt课件,10,Roadway Performance Measures(Interstate),Element,Pavement,Shoulders/Ditches,Roadside,Drainage,Traffic Control Devices,Environmental,Total,Target,93,88,88,88,88,88,90,Actual,86,74,70,73,68,47,76,Scale 1-100,Roadway Performance Measures(,11,Roadway,Level of Service,(2002 Survey),Interstate,Primary,Urban,Secondary,F,D,C,B,A,90,82,82,82,76,73,74,76,RoadwayLevel of Service(200,12,Performance Measure Trends,(Roadway),Performance Measure Trends(Ro,13,Bridge Performance Measures(Statewide),Element,Decks,Rails,Expansion Joints,Superstructure,Substructure,Total,Target,7,7,7,7,7,7,Actual,6.6,7.1,6.5,6.9,6.4,6.7,Scale 1-9,Bridge Performance Measures(S,14,Bridge Performance Measures(Statewide),Element,Decks,Rails,Expansion Joints,Superstructure,Substructure,Total,Target,7,7,7,7,7,7,Actual,6.6,7.1,6.5,6.9,6.4,6.7,Scale 1-9,Bridge Performance Measures(S,15,Bridge,Level of Service,(2002 Survey),F,D,C,B,A,Bridges,7,6.7,BridgeLevel of Service(2002,16,Performance Measure Trends,(Bridge),Performance Measure Trends(Br,17,Pavement Preventive Maintenance,Program has doubled since 2000,2002-2800 miles at$31.3 million,Retreatment,Goal-5000 miles per year at$77.5 million,Pavement Preventive Maintenanc,18,Traffic Systems Maintenance,Signal Preventive Maintenance Program,(7,000 Traffic Signals Statewide),Intelligent Transportation System/Incident Response Program,Total$26.8 million,Traffic Systems MaintenanceSig,19,Maintenance Funding Needs(Millions),NeedsBudgetShortfall,(03-04),Routine Maintenance,(Roads&Bridges)$620.6$428.1$192.5,Maintenance Funding Needs(Mil,20,Maintenance Funding Needs(Millions),NeedsBudgetShortfall,(03-04),Routine Maintenance,(Roads&Bridges)$620.6$428.1$192.5,Backlog(247.30 Million)$36.0$36.0,Maintenance Funding Needs(Mil,21,Contract Resurfacing,Contract Resurfacing,22,Contract Resurfacing,ResurfacingCycles Per G.S.136-44.3,Primary System12 yrs,All Other Systems15 yrs,Total Cost$227.4 million,Contract ResurfacingResurfacin,23,Maintenance Funding Needs(Millions),NeedsBudgetShortfall,(03-04),Routine Maintenance,(Roads&Bridges)$620.6$428.1$192.5,Backlog($247.30 Million)$36.0$36.0,Contract Resurfacing$227.4$157.4$70.0,Maintenance Funding Needs(Mil,24,Floyd$62.4,Snow Storm(Jan.00)$17.4,Ice Storm(Dec.02),$44.4,Total$124.2,Anticipated Reimbursement (,67.0),Estimated DOT Debt$57.2,FEMA/FHWA Emergencies and Disasters(millions),Storm,Cost,Floyd$62.4FEMA/FHWA E,25,Maintenance Funding Needs(Millions),NeedsBudgetShortfall,(03-04),Routine Maintenance,(Roads&Bridges)$620.6$428.1$192.5,Backlog($247.30 Million)$36.0$36.0,Contract Resurfacing$227.4$157.4$70.0,Backlog($103.70 Million)$10.4$10.4,Disasters$25.0$25.0,Maintenance Funding Needs(Mil,26,Maintenance Funding
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 办公文档 > PPT模板库


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!