工程管理专业英语4

上传人:沈*** 文档编号:243931222 上传时间:2024-10-01 格式:PPT 页数:6 大小:52KB
返回 下载 相关 举报
工程管理专业英语4_第1页
第1页 / 共6页
工程管理专业英语4_第2页
第2页 / 共6页
工程管理专业英语4_第3页
第3页 / 共6页
点击查看更多>>
资源描述
单击此处编辑母版标题样式,单击此处编辑母版文本样式,第二级,第三级,第四级,第五级,*,*,*,6. Types of Cost Estimate,Design estimates,Bid estimates,Control estimates,Words,Screening estimates,Preliminary estimates,Detailed estimates,Subcontractor quotations,Quantity takeoffs,Budget estimate for financing,Notes 1,As the bridge type is selected, suppose that e.g. the technology is chosen to be a tied arch bridge instead of some new bridge form, a preliminary estimate is made on the basis of the layout of the selected bridge form on the basis of the preliminary or conceptual design.,Notes 2,If all or part of the construction is to be undertaken by the general contractor, a bid estimate may be prepares on the basis of the quantity takeoffs from the plans provided by the owner or on the basis of the construction procedures devises by the contractor for implementing the project.,Notes 3,However, the contractor may want to assess the actual cost of construction by considering the actual construction procedures to be used and the associated costs if the project is deemed to be different from typical designs.,Notes 4,Consequently, the detailed estimate is often used at the budget estimate since it is sufficient definitive to reflect the project scope and is available long before the engineers estimate.,
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 管理文书 > 施工组织


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!