土木工程常用词汇及术语.docx

上传人:jian****018 文档编号:9732764 上传时间:2020-04-07 格式:DOCX 页数:68 大小:102.66KB
返回 下载 相关 举报
土木工程常用词汇及术语.docx_第1页
第1页 / 共68页
土木工程常用词汇及术语.docx_第2页
第2页 / 共68页
土木工程常用词汇及术语.docx_第3页
第3页 / 共68页
点击查看更多>>
资源描述
Standard Abbreviations and Symbols AB Anchor bolts ASSY Assembly Btu British thermal unit C Celcius C.O. Change order C/C Center to center CIF Contract information form CL Center line CONC. Concrete COL. Column COLL. Collateral CPU Customer pick-up CS Clear span DET Detail dB Decibel DIM. Dimension DSD Double sliding door DWG Drawing EH (E.H.) Eave height ES Eave strut EW Endwall F Fahrenheit FFL (F.F.L.) Finished floor level FO (F.O.) Framed opening FNB Fin neck bolt HSB High strength bolt (ASTM A325) INT Internal or Interior KD Knocked-down K Kelvin kg/cm Kilogram per square centimeter kg/m Kilogram per cubic meter km/h Kilometer per hour kN Kilonewton kN/m Kilonewton per square meter L Length L/C Letter of credit LG Long LT Lean-To m Meter M.T. Metric ton MAX. (max.) Maximum MG Multi-Gable MIN. (min.) Minimum mm Millimeter MR Monorail crane MB Mild steel bolt or machine bolt N Newton NS/FS Near side / Far side OA Overall OC (O.C) On center O/O Out-to-out P & B Post-and-beam PL Plate REV. Revision RF (R.F.) Rigid frame RUD Roll-up door SBO (S.B.O.) Special buy out SDS Self drilling screw SF Space frame SI International system of units SS Single Slope SSD Single sliding door STD. Standard STS Self tapping screw SV Space Saver SW Sidewall TC Tempcon panel THK (T) Thickness TRC Top running crane TYP Typical TYP UN Typical unless noted UHC Underhung crane W Watt or width W/ With W/O Without WG Weatherguard (Panel) Wt. Weight ZS Zamil Steel? Standard Colors and Finishes AB Arabian Beige BB Bronze Brown CG Cactus Green DG Desert Gold FW Frost White PVF2 Polyvinylidene Flouride SB Shasta Blue TC Terra Cotta XPD Exterior Premium Durability XRW Exterior Roofing and Walling XSE Exterior Severe Environments Z/A Zincalume? Standard Panel Profiles Profile A High-Rib panel Profile B High-Rib Plus panel Profile C Low-Rib panel Profile D Sculptured Z - Liner panel Profile E Flat Z - Liner panel Profile F 5-Rib panel Profile G Deep-Rib panel Profile R R panel TCHR Tempcon High-Rib panel TCLR Tempcon Low-Rib panel TCMD Tempcon Modified panel Codes, Specifications and Standards organization ACI American Concrete Institute AISC American Institute of Steel Construction AISI American Iron and Steel Institute ANSI American National Standard Institute AS Australian Standard ASCE American Society of Civil Engineers ASTM American Society for Testing and Materials AWS American Welding Society BS British Standard (Institute) DIN Deutsches Institut for Normung e. V. (German Institute for Standardization) EN European Standards ISO International Organization for Standardization JIS Japanese Industrial Standards MBMA Metal Building Manufacturers Association SSPC Steel Structures Painting Council UBC Uniform Building Code UL Underwriters Laboratories Inc.园林英语简明字典 AAccessibility 可达性Accessible route 易达的路线advance notice 事先通知aerial photogrammetry 航空摄影测量aerobic digesters 需氧消化池aesthetic considerations 审美方面的考虑brick and concrete block walls 砖和混凝土砌块墙stone walls 石头墙wood and metal fences 木头和金属栅栏aesthetic controls 审美控制aggregate base 混合基础AIA 美国建筑师协会Anaerobic digesters 厌氧分解池APA 美国规划师协会arterial streets 主干道as-built records 施工记录ASLA 美国景观设计师协会athletic facility 运动设施average walking distance 平均步行距离axioms 原理Bbackfill 回填backhoe 挖沟机bar charts 横道图barrier design 障碍设计beams 大梁bearing capacity 承载力benchmarks 水准点billing 帐簿biodiversity 生物多样性bioengineering 生物工程biomass 生物量bioretention ponds 生物滞留池boardwalks 栈桥bonding company 担保公司bonuses 奖金boundary definition 边界确定boundary survey 边界测量brownfields 褐色土地bulldozers 推土机business development 商业开发business parks 商业园区Ccadastral survey 地籍测量camping 野营chaozegang123 at 2007-6-08 01:48:56 candlepower 烛光度cantilevered wall 悬臂墙cascading waterfalls瀑布叠水 certificates of payment 付款证明书certifications of compliance 应允证明书cesspools 化粪池,污水坑,污水渗井,粪坑change orders 变更单changes, unauthorized 未经同意的变更channels, stormwater 雨水沟渠,槽,渠道circulation control 循环控制circulation patterns 环流模式clay lenses 粘土防渗层clay soil 粘土clean-up 清扫,清理,清除,提纯,净化clearing and grubbing 清理和除根client 业主climate zones 气候带closeout 竣工cluster treatment systems 集中式污水处理系统co-ordinates 坐标cold 寒带collected rainwater 收集起来的雨水collector streets 次干道colloidal soil 胶质土壤commercial center design 商业中心设计communication 电信community commercial 社区商业community facility standards 社区设施标准community parks and recreation planning data 社区公园和文娱体育规划资料community scale 社区尺度community standards 社区标准compaction 压实competition pools 竞赛用游泳池composting toilets 堆肥厕所conceptualization 概念化concrete crib wall 混凝土格笼墙cones of vision 视锥connected imperviousness 连续的非渗透地面conservation standards 保护标准constructed wetlands 人工湿地construction 施工brick and concrete block walls 砖和混凝土砌块墙stone walls 石头墙wood and metal fences 木头和金属栅栏construction document 施工文件construction layout 施工布局construction observation 施工监理construction permits 施工许可construction sequence 施工顺序construction survey 施工测量contingencies 临时费contingency allowance 临时津贴contract 合同responsibilities 责任types of 类型unauthorized changes 未经同意的变更contract documents 合同文件control points 控制点conveyance techniques, stormwater 雨水的输送技术corrective observation 校正性(补救性,修正性)检查(监理)corridors 廊道cost data 造价数据cost estimate components 造价估算内容equipment costs 设备费equipment crew costs 设备人工费general requirements costs 一般要求的费用labor cost 人工费location 位置,地点material 材料overtime 加班费productivity 生产率project scale 项目规模quantity take-off methods 起点数量法cost estimating 造价估算cost plus 造价累计court games 场地运动court surface 运动场地地面CPM 关键路径法Critical Path Method. See CPM 关键路径法,见CPMCSI 施工规范原理culverts 涵洞,暗沟,管道cut operations 挖方工程Ddatum 数据decking平台面,铺板decks平台,甲板 basic components 基本内容design requirements 设计要求estimating design load 估算设计荷载framing method 结构方法plank-and-beam framing 厚木板梁框架platform framing 平台框架material 材料hardware 五金件wood 木料,木材site analysis 场地分析span tables 跨度表structural design 结构设计decks, function of 平台的功能deferred maintenance 延期维修(维护)demolition, general 整体破坏demolition ,selective 选择性破坏density 密度design development 设计扩初,设计深化design framework 设计框架design impacts 设计影响design quality 设计质量design speed 设计速度detail scale 细部尺度detention ponds 滞留池development 开发industrial. See industrial development 工业,见工业开发residential. See residential development 居住,见居住开发development programming 开发计划development types, industrial and business 开发类型,工业和商业dimensional Criteria 标注标准dimensions 标注dimension of human figures 人体尺度direct labor 直接人工费disconnected imperviousness 不连续的非渗透地面disposal 处理,处置,排除,清除DL. See direct labor DL.见直接人工费drainage 排水,流域面积,排洪,排水系统drinking water 饮用水dry detention ponds 干滞池durability 耐久性EEames, Charles and Ray 查理?埃姆斯和雷earthwork 土方ecological impact 生态影响economic impact 经济影响edge habitat 边缘栖息地edge restraint 边缘限制electrical lines 电力线embodied energy 蕴藏能量endwalls 尾墙energy 能量embodied. See embodied energy 具体化的,见蕴藏能量,具体能量energy costs 能量造价environmental impact analysis 环境影响分析environmental impact statement (EIS) 环境影响报告书(EIS)scoping process 确定范围程序environmental modification 环境修复equipment costs 设备费equipment crew costs 设备人工费equivalents 相等物,等同物estimating 估算stormwater runoff 雨水径流量estimating water flows 估算水流量evaluation 评价evapotranspiration rate 土壤水分蒸发蒸腾损失总量速率exotic plant species 外来植物物种eye levels 视平线Ffabric reinforcement 纤维加固,织物加强件facilities planning data 设施规划数据feasibility planning 可行性规划federal regulations 联邦规范flood protection 防洪historic preservation 历史保留National Environmental Policy Act(NEPA) 国家环境政策法案(NEPA)NPDES general permits NPDES一般性许可Section 10 permit 第10条许可Section 404 permit 第404条许可fee 费用cost plus fixed 固定费用之和lump sum 总数,总合retainer 律师费fences and walls 栅栏和围墙fences, wood and metal 栅栏,木栅栏和金属栅栏aesthetic considerations 审美方面的考虑components 组分,内容construction 施工structural considerations 结构方面的考虑field orders 现场通知单field sports 田径运动field surfaces 田径运动场地面field surveys 现场测量fill operations 填方工程fill, general 一般性填方 filter strips 滤器,滤池,过滤,滤水filtration 过滤filtration systems 过滤系统finish grading 设计标高flexible pavement 柔性地面铺装flood protection 防洪follow ups 连续footage 尺长footcandle 英尺烛光footing drains 基座处排水,立足点排水footings 立足点forward spatial bubbles foundations 基础fragmentation 破碎Freeway or Distributor Systems 高速路或分配者系统French drains 法式排水friction coefficient 摩擦系数frost depth 结冻深度,冰冻深度frost-thaw cycle 结冻-融化周期functional requirement 功能要求Ggarden pool 花园游泳池general conditions 一般情况general contractor 总承包商general demolition 整体破坏general fill 总填方general requirements 一般要求general requirements costs 一般要求的费用general roadway standards 一般道路标准geodetic survey 测地学测量GIS 地理信息系统golf and driving ranges 高尔夫和高尔夫练习场grading 场地平整granular soil粒状土壤gravity wall 重力墙graywater 灰水greenfields 绿色用地,绿色土地ground covers 地被植物groundwater protection 地下水保护groundwater recharge 地下水补给groundwater resources 地下水资源,地下水储量growing season 生长期guarantees 抵押物Hhand level 手动水平仪handrailings 扶手hazardous plants 有毒植物headwalls 头墙heavy duty 重型的,责任重大的herbaceous plants 草本植物highway 高速公路historic preservation 历史保留horizontal alignment 平面设计hot arid 炎热干燥hot humid 炎热潮湿hydrographic survey 水文测量hydrologic cycle 水文周期Iilluminance 亮度impervious surface ratio 不渗透地面比例industrial development 工业开发industrial parks 工业园区infiltration beds 渗透床infiltration ponds 渗透池infiltration wells 渗透井infiltration, stormwater 雨水渗透inspection 检查installation 安装Insurance Rate Maps (FIRMs) 保险赔偿比例地图interpretation 注释,解释invasive species 入侵物种irrigation 灌溉irrigation ponds 灌溉池塘irrigation systems 灌溉系统irrigation water, sources of 灌溉水水源Jjob meetings 工作会议joists 托梁Llabor costs 人工费lagoons 塘lamp characteristics 灯具的特点landscape assessment 景观评价Landscape Coefficient(KL) 景观系数(KL)landscape planning 景观规划landscape planning strategies 景观规划对策landscape plantings, calculating water景观种植用水量的计算large-scale sites 大型场地layout and surveying 布局和测量layout methods 布局方法layout plans 平面图,布局平面layout requirements 布局要求layout survey 布局测量leaching fields 沥滤场light depreciation 不强烈的抗议light duty 轻型的lighting 照明atmosphere and character 气氛和特征orientation and identification 方位和识别safety and security 安全和治安limit-of-work line 工作期限local or minor streets 当地的或小街道local regulations 当地规范(规定)aesthetic controls 审美控制construction permits 施工许可planned unit development regulation 有规划的单元开发规范(规定)subdivision regulations (土地)再细分规范(规定)zoning regulations分区规划规范(规定)rezoning 再分区规划variances 变动lumen 流明luminance 亮度lump sum fee 总费用lux 勒克司(国际单位制的照明单位,即米烛光)Lyle, John Tillman 约翰?蒂尔曼?莱尔Mmagnetic declination 磁力偏差maintenance and disposal 维修和处理maintenance period 维修期maneuvering patterns 运行方式 map projections 地图投影map scale 制图比例markup 涨价master planning 总体规划MASTERFORMAT 雇主表格material costs 材料费material lifecycle cost estimates 材料生命周期造价估算material samples 材料样品1.主入口大门/岗亭(车行 & 人行) MAIN ENTRANCE GATE/GUARD HOUSE (FOR VEHICLE& PEDESTRIAN ) 2.次入口/岗亭(车行 & 人行 ) 2ND ENTRANCE GATE/GUARD HOUSE (FOR VEHICLE& PEDESTRIAN ) 3.商业中心入口 ENTRANCE TO SHOPPING CTR. 4.水景 WATER FEATURE 5.小型露天剧场 MINI AMPHI-THEATRE6.迎宾景观-1 WELCOMING FEATURE-1 7.观景木台 TIMBER DECK (VIEWING) 8.竹园 BAMBOO GARDEN 9.漫步广场 WALKWAY PLAZA 10.露天咖啡廊 OUT DOOR CAFE 11.巨大迎宾水景-2 GRAND WELCOMING FEATURE-2 12.木桥 TIMBER BRIDGE 13.石景、水瀑、洞穴、观景台 ROCKSCAPE WATERFALLS GROTTO/ VIEWING TERRACE 14.吊桥 HANGING BRIDGE 15.休憩台地(低处) LOUNGING TERRACE (LOWER ) 16.休憩台地(高处) LOUNGING TERRACE (UPPER ) 17.特色踏步 FEATURE STEPPING STONE 18.野趣小溪 RIVER WILD 19.儿童乐园 CHILDRENS PLAYGROUND 20.旱冰道 SLIDE 21.羽毛球场 BADMINTON COURT 22.旱景 DRY LANDSCAPE 23.日艺园 JAPANESE GARDEN 24.旱喷泉 DRY FOUNTAIN 25.观景台 VIEWING DECK26.游泳池 SWIMMING POOL 27.极可意 JACUZZI 28.嬉水池 WADING POOL 29.儿童泳池 CHILDRENS POOL 30.蜿蜒水墙 WINDING WALL 31.石景雕塑 ROCK SCULPTURE 32.中心广场 CENTRAL PLAZA 33.健身广场 EXERCISE PLAZA 34.桥 BRIDGE 35.交流广场 MEDITATING PLAZA36.趣味树阵 TREE BATTLE FORMATION 37.停车场 PARING AREA38.特色花架 TRELLIS 39.雕塑小道 SCULPTURE TRAIL40.(高尔夫)轻击区 PUTTING GREEN 41.高尔夫球会所 GOLF CLUBHOUSE 42.每栋建筑入口 ENTRANCE PAVING TO UNIT 43.篮球场 BASKETBALL COURT 44.网球场 TENNIS COURT45.阶梯坐台/种植槽 TERRACING SEATWALL/PLANTER 46.广场 MAIN PLAZA 47.森林、瀑布 FOREST GARDEN WATERFALL 48.石景园 ROCKERY GARDEN 49.旱溪 DRY STREAM 50.凉亭 PAVILION 51.户外淋浴 OUTDOOR SHOWER 52.拉膜结构 TENSILE STRUCTURE 53.台阶 STAIR 54.高尔夫球车停车场 PARKING ( GOLF CAR )55.健身站 EXERCISE STATION 56.晨跑小路 JOGGING FOOTPATH 57.车道/人行道 DRIVEWAY /SIDEWALK 58.人行漫步道 PROMENADE 59.瀑布及跳舞喷泉(入口广场) WATER FALL AND DANCING FOUNTAIN ( ENTRY PLAZA ) 60.特色入口 ENTRY FEATURE 61.石景广场 ROCKERY PLAZA工程结构设计的材料性能、构件承载能力和材料性能代表值术语及其涵义应符合下列规定:1 抗力 resistance结构或构件及其材料承受作用效应的能力,如承载能力、刚度、抗裂度、强度等。2 强度 strength材料抵抗破坏的能力。其值为在一定的受力状态或工作条件下,材料所能承受的最大应力。3 抗压强度 compressive strength材料所能承受的最大压应力。4 抗拉强度 tensile strength材料所能承受的最大拉应力。5 抗剪强度 shear strength材料所能承受的最大剪应力。6 抗弯强度 flexural strength在受弯状态下材料所能承受的最大拉应力或压应力。7 屈服强度 yield strength钢材在受力过程中,荷载不增加或略有降低而变形持续增加时,所受的恒定应力。对受拉无明显屈服现象的钢材,则为标距部分残余伸长达原标距长度0.2%时的应力。8 疲劳强度 fatigue strength材料在规定的作用重复次数和作用变化幅度下所能承受的最大动态应力。9 极限应变 ultimate strain材料受力后相应于最大应力的应变。10弹性模量 modulus of elasticity材料在单向受拉或受压且应力和应变呈线性关系时,截面上正应力与对应的正应变的比值。11.剪变模量 shear modulus材料在单向受剪且应力和应变呈线性关系时,截面上剪应力与对应的剪应变的比例。12变形模量 modulus of deformation材料在单向受拉或受压,且应力和应变呈非线性或部分线性和部分非线性关系时,截面上正应力与对应的正应变的比值。13泊松比 Poisson ratio材料在单向受拉或受压时,横向正应变与轴向正应变的比值。14承载能力 bearing capacity结构或构件所能承受最大内力,或达到不适于继续承载的变形时的内力。15受压承载能力 compressive capacity构件所能承受的最大轴向压力,或达到不适于继续承载的变形时的轴向压力。16受拉承载能力 tensile capacity构件所能承受的最大轴向拉力,或达到不适于继续承载的变形时的轴向拉力。17受剪承载能力 shear capacity构件所能承受的最大剪力,或达到不适于继续承载的变形时的剪力。18受弯承载能力 flexural capacity构件所能承受的最大弯矩,或达到不适于继续承载的变形时的弯矩。19受扭承载能力 torsional capacity构件所能承受的最大扭矩,或达到不适于继续承载的变形时的扭矩。20疲劳承载能力 fatigue capacity构件所能承受的最大动态内力。21刚度 stiffness; rigidity结构或构件抵抗单位变形的能力。22抗裂度 crack resistance结构或构件抵抗开裂的能力。23极限变形 ultimate deformation结构或构件在极限状态下所能产生的某种变形。24稳定性 stability 结构或构件保持稳定状态的能力。25空间工作性能 spatial behaviour结构在承受作用情况下的整体工作能力。26脆性破坏 brittle failure结构或构件在破坏前无明显变形或其它预兆破坏类型。27延性破坏 ductile failure结构或构件在破坏前有明显变形或其它预兆的破坏类型。28抗力分项系数 partial safety factor for resistance设计计算中反映抗力不定性并与结构可靠度相关联的分项系数。29材料性能标准值 characteristic value of a property of a material结构或构件设计时,采用的材料性能的基本代表值。其值一般根据符合规定质量的材料性能的概率分布的某一分位数确定,亦称特征值。30材料性能分项系数 partial safety factor for property of material设计计算中,反映材料性能不定性并和结构可靠度相关联的分项系数。有时用以代替抗力分项系数。31材料性能设计值 design value of a property of a material材料性能标准值除以材料性能分项系数后的值。32几何参数标准值 nomianal value of geometric parameter结构或构件设计时,采用的几何参数的基本代表值。其值可采用设计规定的标定值。工程结构设计的几何参数和常用量程术语及其涵义应符合下列规定:1 截面高度 height of section; depth of section一般指构件正截面在弯矩作用平面上的投影长度。2 截面宽度 breadth of section一般指构件正截面在与高度相垂直方向上的某一尺寸。3 截面厚度 thickness of section一般指构件薄壁部分截面边缘间的尺寸。4 截面直径 diameter of section圆形截面通过圆心的弦长。5 截面周长 perimeter of section截面边缘线的总长度。6 截面面积 area of section截面边缘线所包络的材料平面面积。7 截面面积矩 first moment of area截面各微元面积与微元至截面上某一指定 轴线距离乘积的积分。8 截面惯性矩 second moment of area; moment of inertia截面各微元面积与各微元至截面上某一指定轴线距离二次方乘积的积分。9 截面极惯性矩 polar second moment of area; polar moment of inertia截面各微元面积与各微元至垂直于截面的某一指定点距离二次方乘积的积分。10 截面模量(抵抗矩) section modulus截面对其形心轴的惯性矩与截面上最远点至形心轴距离比值。11 截面回转半径 radius of gyration截面结其形心轴的惯性矩除以截面面积的商的正二次方根。12 偏心矩 eccentricity偏心受力构件中轴向力作用点至截面形心的距离。13 偏心率 relative ecdentricity偏心构件的偏心距与截面高度或截面核心距的比值。14 长度 length结构或构件长轴方向的尺寸。15 跨度 span结构或构件两相邻支承间的距离。16 矢高 rise拱轴线的顶点至拱趾连线有竖直距离,或一般壳中面的顶点至壳底面的竖直距离。17 长细比 slenderness ratio构件的计算长度与其截面回转半径的比值。18 纵坡 longitudinal gradient路线纵断面上同一坡段两点间高差与水平距离的比值。19 超高 superelevation在曲线地段上,公路横断面的外侧高于内侧单向横坡的高差;或铁路的外侧钢轨高于内侧钢轨的高差。 20 视距 sight distance沿公路车道中心线上1.2m高度能看到该车道中心线上高为100m m的物体顶点的水平距离。21 路面宽度 width of subgrade公路上行车道的路面的宽度。22 路基宽度 width of subgrade路基横断面上两路肩外缘之间的宽度。23 公路建筑限界 clearance of highway在公路路面以上的一定宽度和高度范围内,不允许有任何设施及障碍物侵入的规定最小净空尺寸。24 轨矩 gauge钢轨面以下规定距离处,左右两根钢轨头部内侧之间的最短距离。25 铁路建筑限界 railroad clearance铁路轨道面以上一定宽度和设计范围内,不许有任何设施和障碍物侵入的规定最小净空尺寸。26 桥下净空 clearance under bridge桥跨结构底面至通航或设计水面、路面或轨面之间的空间。27 桥建筑高度 construction height of bridge桥跨结构底面至顶面的竖直距离。28 桥建筑限界 clearance above bridge floor桥面以上一定宽度和高度范围内,不许有任何设施和障碍物侵入的规定最小净空尺寸。29 隧道建筑限界 clearance of tunnel隧道内公路路面或铁路轨面以上一定宽度和高度范围内,不许有任何设施和障碍物侵入的规定最小净空尺寸。 30 泊位 berth一艘设计标准船型停靠码头所占用的岩线长度或占用的趸船数目。31 富余水深 additional depth; residual depth为保证码头前航道的水深,在满足设计标准船舶的水深后,需要再增加的深度。32 波浪要素 wave characteristics; wave parameters表示波浪形态和运动特征的主要物理量,一般指波高、波长、波浪周期、波速等。33 潮位 tide level受潮汐影响而产生周期性涨落的水位,在某一地点及某一时刻相对于基准面的高程。34 水位 water level地表水水体的自由面以及地下水的表面,在某一地点及某一时刻相对于基准面的高程。35 设计水位 design water level水工建筑物在正常使用条件下,根据选定的设计标准所确定的计算水位。36 坝高 dam height坝基的最低点至坝顶的高度。37 坝长 dam length坝顶沿坝轴线两岩端点间的长度。38 安全超高(富余高度) free board水工建筑物顶部超出最高静水位或最高静水位加波浪高度以上所规定的余留高度。39 水库死水位 dead water level水库在正常运行情况下,允许降落的最低水位。40 水库设计(正常)蓄水位 normal (pool) level水库在正常运行下,为满足兴利要求的设计最高蓄水位。41 水库设计洪水位 design flood level当水库在出现大坝设计标准洪水时,所达到的最高水位。42 水库校长核洪水位 exceptional flood level水库在出现大坝校核标准洪水时,允许达到的最高水位。43 水库死(垫底)库容 dead storage死水位以下不起兴利利用的水库容积。44 水库兴利(有效、调节)库容 usable storage 正常蓄水位与死水位间,可供调节兴利水量的水库容积。45 水库总库容total reservoir storage水库在校核洪水位以下的容积。工程结构设计常用的物理学、数理统计、水力学、土力学和结构抗震术语及其涵义应符合下列规定:1 磨擦系数 coefficient of friction在两物体接触面上的摩擦力与法向压力的比值。2 质量密度 mass density单位体积材料(包括岩石和土)的质量,简称密度。3 重力密度 force (weight) density单位体积材料所受的重力,简称重度。4 动量矩 moment of momentum质点的动量与该质点至某点距离的乘积。5 转动惯量 dynamic moment of inertia结构或构件各微元的质量与各微元至某一指定轴线或点距离二次方乘积的积分。6 动作用系数 dynamic effect factor 承受动态作用的结构或构件,按承受等效 静态作用设计时采作的系数。其值为结构或构件的最大动态作用效应与相应的静态作用效应的比值。当为直接作用时亦换动力系数。7 振动 vibration物体反复通过某个基准位置的运动。8 加速度 acceleration速度变化与发生这一变化所经时间的比,即单位时间速度的变化。9 频率 frequency物体每秒中振动的次数。10 自振(固有)频率 natural frequency在外力不复存在时,振动体系的振动频率。11 周期 period物体振动时,重复通过基准位置一次的间隔时间,与频率互为倒数。12 自振周期 natural period of vibration结构按某一振型完成一次自由振动所需的时间。13 周期振动 periodic vibration在相等的时间间隔内重复发生的振动,简谐振动是最简单的一种周期振动。14 振幅 amplitude of vibration物体振动时其位移、速度、加速度、内力、应力、应变等最大的变化幅度,即在振动曲线中,从波峰或波谷到横坐标基线的距离。15 自由度 degree of freedom在结构计算中确定物体在空间中的位置所需要的最小独立座标数。当仅需要一个独立座标时,称为单自由度。16 阻尼 damp使振幅随时间衰闰的各种因素。17 强迫振动 forced vibration 由外界随时间变化的干扰力或激发所引起的振动。18 振型 mode of vibration结构按某一自振周期振动时的变形模式。19 共振 resonance 体系振动时,当干扰频率与固有频率接近时,振幅急剧加大的现象。20 统计参数 statistical parameter一般指随机变量的数字特征,如平均值、标准差、均值系数、变异系数等。21 平均值 mean value随机变量取值的平均水平。它表示随机变量取值的集中位置。22 方差 mean square deviation随机变量取值与其平均值之差的二次方的平均值。23 标准差 standard deviation随机变量方差的正二次方根,它表示随机变量取值的离散程度。24 均值系数 coefficient of mean value随机变量平均值除以其标准值的商,它表示随机变量取值的相对集中位置。25 变异系数 coefficient of variation随机变量标准差除以其平均值的绝对值的商。它表示随机变量取值的相对离散程度。26 概率分布 probability distribution随机变量取值的统计规律。一般采用概率密度函数或概率质量函数和概率分布函数来描述。27 分位数 fractile为概率分布分位数的简称,分位数是对随机变量的某个取值,当与该值相应的分布函数为P时,则该值为P分位数。28 显著性水平 significance level所假设的概率分布类型或统计参数符合实际,但采用概率分布或统计参数的检验方法检验后,该假设被拒绝接受的最大概率。29 静水压强 hydro-static pressure水体在静水中一点的压强,为单位面积上的压力。30 动水压强 hydro-dynamic pressure流动水体中一点的压强。31 静水总压力 total hydro-static pressure作用在物体表面上静水压强的合力。32 压力梯度 pressure gradient压力沿某一方向的变化率。33 压力水头 pressure head以水柱高度表示水体中任一点的压力。34 位置水头 level head水体中一点到基准面的高度。35 流畅 stream field流体流动空间的统称。36 流线 stream field流畅内反应流体流动趋势的一条曲线。在同一已知时刻内,曲线上任一流体质点的流速方向与该曲线的切线方向相重合。37 流速 velocity of flow流场中任一流体质点在单位时间内的位移。38 流速水头 velocity head of flow与水体平均流速的平方除以两倍重力加速度相当的水柱高度。39 总水头 total head水体中一点的位置水头、压力水
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 建筑环境 > 建筑工程


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!