英文合同范本

上传人:最*** 文档编号:11248249 上传时间:2020-04-21 格式:DOC 页数:7 大小:40KB
返回 下载 相关 举报
英文合同范本_第1页
第1页 / 共7页
英文合同范本_第2页
第2页 / 共7页
英文合同范本_第3页
第3页 / 共7页
点击查看更多>>
资源描述
. Contract Contract NO:Part A:Part B:Qingzhou SG.One Machinery Equipment Co.,Ltd 1、 Equipment name, quantity, unit price, total priceDevice nameTypeUnitAmountUnit priceTotal priceFlexo printing machineSet/setsTotal (RMB):2、 Packing standards and fees:The supplier of equipment and accessories adopt reliable pressure defense, anti abrasion, waterproof protection measures, etc. Protective packing costs shall be borne by the supplier.3、 Delivery time, location, and transportation costs1、 The time of delivery:From the deposit received postpone 30 working days from the date of delivery of the goods;2、 Place of delivery:Party A factory;3、 Transport:The supplier of packaging, good protective equipment to take the car shipped to the buyers plant, shipping costs borne by party B.4、 The supplier responsibilities and obligations:1、Equipment to the buyer, the supplier technical personnel on-site guidance unloading, lifting and installation of equipment, at the same time, ding Instructed key-module buyers personnel on the equipment, the control center, fragile parts, such as pieces of dust to identify and adoptTake strict protective measures;2、 Equipment installation and debugging:The supplier technical personnel responsible for equipment installation and commissioning, to be responsible for the buyer technical training for operators at the same time;3、 Since equipment delivery of the acceptance of the buyer, the supplier of equipment warranty for one year. During the warranty period, in addition to the consumable parts, belong to the normal operation of equipment failure or quality problems, if the responsibility Belonging to the supplier, the supplier will provide free spare parts and maintenance services. If the liability for the buyer, the supplier to provide maintenance services, only charge the cost of spare parts;4、 After the equipment to the buyer, the supplier shall give the buyer all regular equipment information provided (in duplicate), data including: electric control circuit diagram,( wiring diagram, control principle diagram and main components layout diagram electric control cabinet), operating instructions, etc., the handover routine sign handover procedures;5、 The buyer in the notification need maintenance technical service, the supplier repair response within 24 hours;6、 The supplier is responsible for the factory before commissioning the required consumables, including trial edition, ink, light oil, double-sided adhesive, scraper, and other items.5、 The buyers responsibilities and obligations:1、 Buyers responsibility and obligation: this equipment is a patented product, party a shall not to copy or the device for other units or individuals to counterfeit or surveying and mapping the device provides the convenience. Without party B permission, party A shall not make other equipment manufacturers or individuals to visit the equipment;2、 The supplier in the buyers site installation debugging personnel accommodation and food provided by the buyer, define installation and debugging and culture training time is 15 working days to complete; System installation site preparation shall be the responsibility of the buyer, the supplier for the necessary drawings;3、 Needed for the equipment installation site of water, electricity, gas source and equipment grounding line prepared by the buyer on their own, and sent to the installation of equipment.6、 Equipment debugging acceptance criteria and methods:1、 Equipment acceptance standard in the contract and the provisions of this contract in the attachment on the basis of the equipment technical indicators;2、 For equipment in the suppliers factory acceptance, acceptance inspection before shipment.7、 Payment way and deadline:1、 Advance payment: 50% of the contract price, that is, RMB yuan, the advance payment to the account contract comes into effect;2、 Send payment: pay 90% of the contract sum before the supplier delivery, that is RMB yuan;3、 Acceptance payment: after the acceptance of equipment at buyers plant commissioning, trial production run after 1 month, within 12 months pay the balance payment of the contract, 10% of the total amount of the contract, that is RMB yuan;4、 Invoice:Within one month after party B receive the full payment to party A according to open 17% value-added tax invoice.8、 This contract is a confidential contract. Both parties shall not disclose to any organization or individual in the agreement of party b to party a to provide the price of (models) devices, so as to avoid adverse impact on equipment sales to party B.9、 Attachment of contract and the contract are equally valid.10、 Solution contract dispute method: matters not both sides talks things over or through arbitration agency or court of law program is solved.11、 This contract is in duplicate, each party holds one.Party A (seal) Party B (seal) Qingzhou SG.One Machinery Equipment Co.,LtdLegal representative (signature) : Legal representative (signature) :Entrusted agent(signature): Entrusted agent(signature)The phone: The phone:0536-6131137Fax: Fax:0536-6131135Address: Address:Qingzhou economic development zoneThe date Bank:CCB Qingzhou branch Account:3700 1676 8080 5015 2556 The date:Note: detailed technical requirements see the attachment. 欢迎您下载我们的文档,后面内容直接删除就行资料可以编辑修改使用资料可以编辑修改使用致力于合同简历、论文写作、PPT设计、计划书、策划案、学习课件、各类模板等方方面面,打造全网一站式需求ppt课件设计制作,word文档制作,图文设计制作、发布广告等,公司秉着以优质的服务对待每一位客户,做到让客户满意!感谢您下载我们文档7.
展开阅读全文
相关资源
相关搜索

当前位置:首页 > 办公文档 > 模板表格


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!