资源描述
Introduction to Rhythm Factory Planner,May 17,2000,Agenda,What Is Rhythm Factory Planner(FP),Rhythm FP Architecture,Rhythm Factory Planner(FP)Planning Concept,Rhythm FP features,What Is Rhythm Factory Planner(FP)?,What Is Rhythm Factory Planner(FP),Factory Planner,uses the information from the existing transaction system(ERP)to provide intelligent decision support capability in,Planning,and,Scheduling,Factory Planner,provides a global integrated view,Purchasing,Order Entry,Shipping,MRP,Factory Planner,Floor Control,Data,Decisions&Data,What Can Rhythm FP Do?,Factory Planner provides a systematic and constraint-based planning concept,Factory Planner can help to minimize the current ad-hoc planning process,Factory Planner can quickly reveal the production constraint,which is almost impossible for traditional planning process,Rhythm FP Architecture,Rhythm FP Architecture,Client-Server Architecture,Both server and client processes can run on Windows NT machines,May run server and client on separate machines,Use existing data(from Triton and SFCS),Memory Resident,Multi-User capability,Rhythm FP Architecture,(cont.),Rhythm,FP Client,Rhythm,FP Client,Rhythm,FP Client,Data Files,Rhythm,FP Server,Rhythm,FP Server,Production,Planner,Material,Planner,Report,Reader,Production,Server,What-if,Server,Rhythm FP Framework,(Input&Output),Rhythm,FP Server,Demand,Product Structure,:,Part number,BOM,Routings,Factory Model,:,Resources,Resource Calendar,Material Availability,:,Unassigned Inventory,P.O./Vendor Info.,WIP,Other Information,:,Tools,.,Production Plan,:,Capacity,Material,Rhythm FP Framework,(cont.),FP requires,ACCURATE,and,SUFFICIENT,data input(garbage in&garbage out),Open loop planning process in the first phase,Planners execute the production plan based on FPs suggestion,Basic FP Data Objects,BOM data,Demand order data,Part number data,Unassigned inventory data,Supplier part data,Resource data,Routing data,More FP Data Objects,Wip data,Operation resource data,Resource calendar data,Vendor calendar data,Variable capacity bucket size data,FP Output Files,Critical delivery data,Purchase order EDC recommendations,Manufacturing order data,Planned start times,Procurement data,Procurement by part data,etc.,FP Data Objects Relationship,Demand Orders,&Forecast Orders,BOM,Unassigned,inventory,Routing data,Vendor Info,Resource data,Resource,calendar data,WIP data,Finished Goods,Part Numbers,Mfg Orders,Rhythm FP Planning Concept,FP Planning Concept,BTO(Build-to-order)engine:use,Demands,as the driver to create plan,Consider both material and capacity constraints at the same time,Consider both,Sales Orders,and,Forecasts,as the demand input with different priorities,Start as an,Infinite Capacity Plan,and progress to a,Finite Capacity Plan,FP Planning Concept,(cont.),Materials are assigned according to the BOM explosion from the finish good level,also consider Time factors,Raw Materials(Procured Parts)are supplied by on-hand inventory or P.O.from vendors.,Manufactured parts(finish goods and intermediate parts)are supplied by WIP or manufacturing orders(work orders).,Process Flow in FP,Infinite Capacity Planning,Finite Capacity Planning,CAO(constraint anchor optimization),Detail Scheduling,Identify Material and Capacity Problems,Fix Material Problems,Attempt to fix Capacity Problems,Create detailed schedules,FP Infinite Capacity Planning(ICP),Build factory model phase,Inventory Assignment phase,Planned start time phase,Capacity utilization phase,Presents plan through user interface(client),ICP-Build Factory Model,Read files into memory and create resident memory model,File formats in Spec Files,Do consistency checking,ICP-Inventory Assignment,Explore Bill of Materials,Determines BOM configuration and routing assignments,Creates manufacturing orders to satisfy demands,Net requirements for raw materials and sub-assemblies against on-hand inventory and WIP(Work-In-Process),Creates material requirements,ICP-Inventory Assignment,(cont.),Backward Schedule,Definition:Latest Possible Start Time(,LPST,)-the latest date a manufacturing task can begin and still complete on time,LPST=Task Due Date-Task Processing time,Calculates the LPST for each manufacturing task,Each manufacturing task will have a LPST,Soft constraint:violate LPST constraint will deteriorate the order-fulfillment performance,ICP-Inventory Assignment,(cont.),Backward Schedule,Subassembly 1,R.W.#1,R.W.#2,Sub,assembly 2,Computer,Order,Due Date,Task Due,Date(LPST),LPST,LPST,Mfg order#1,Mfg order#3,Mfg order#2,ICP-Inventory Assignment,(cont.),Inventory Assignment,Prioritize demand orders(due date,priority,quantity),Sort prioritized demand orders,Sort parts from end-item to raw materials,Calculate demands,Allocate supplies,ICP-Inventory Assignment,(cont.),Forward Schedule,Definition:Earliest Possible Start Time(,EPST,)-the earliest date that a manufacturing task can begin(constrained by materials),EPST=max(Server Start Time,Material Available Time),Calculates the EPST for each manuf
展开阅读全文