i2 FP 介绍性PPT

上传人:沈*** 文档编号:244101843 上传时间:2024-10-02 格式:PPT 页数:44 大小:162.50KB
返回 下载 相关 举报
i2 FP 介绍性PPT_第1页
第1页 / 共44页
i2 FP 介绍性PPT_第2页
第2页 / 共44页
i2 FP 介绍性PPT_第3页
第3页 / 共44页
点击查看更多>>
资源描述
Introduction to Rhythm Factory Planner,May 17,2000,Agenda,What Is Rhythm Factory Planner(FP),Rhythm FP Architecture,Rhythm Factory Planner(FP)Planning Concept,Rhythm FP features,What Is Rhythm Factory Planner(FP)?,What Is Rhythm Factory Planner(FP),Factory Planner,uses the information from the existing transaction system(ERP)to provide intelligent decision support capability in,Planning,and,Scheduling,Factory Planner,provides a global integrated view,Purchasing,Order Entry,Shipping,MRP,Factory Planner,Floor Control,Data,Decisions&Data,What Can Rhythm FP Do?,Factory Planner provides a systematic and constraint-based planning concept,Factory Planner can help to minimize the current ad-hoc planning process,Factory Planner can quickly reveal the production constraint,which is almost impossible for traditional planning process,Rhythm FP Architecture,Rhythm FP Architecture,Client-Server Architecture,Both server and client processes can run on Windows NT machines,May run server and client on separate machines,Use existing data(from Triton and SFCS),Memory Resident,Multi-User capability,Rhythm FP Architecture,(cont.),Rhythm,FP Client,Rhythm,FP Client,Rhythm,FP Client,Data Files,Rhythm,FP Server,Rhythm,FP Server,Production,Planner,Material,Planner,Report,Reader,Production,Server,What-if,Server,Rhythm FP Framework,(Input&Output),Rhythm,FP Server,Demand,Product Structure,:,Part number,BOM,Routings,Factory Model,:,Resources,Resource Calendar,Material Availability,:,Unassigned Inventory,P.O./Vendor Info.,WIP,Other Information,:,Tools,.,Production Plan,:,Capacity,Material,Rhythm FP Framework,(cont.),FP requires,ACCURATE,and,SUFFICIENT,data input(garbage in&garbage out),Open loop planning process in the first phase,Planners execute the production plan based on FPs suggestion,Basic FP Data Objects,BOM data,Demand order data,Part number data,Unassigned inventory data,Supplier part data,Resource data,Routing data,More FP Data Objects,Wip data,Operation resource data,Resource calendar data,Vendor calendar data,Variable capacity bucket size data,FP Output Files,Critical delivery data,Purchase order EDC recommendations,Manufacturing order data,Planned start times,Procurement data,Procurement by part data,etc.,FP Data Objects Relationship,Demand Orders,&Forecast Orders,BOM,Unassigned,inventory,Routing data,Vendor Info,Resource data,Resource,calendar data,WIP data,Finished Goods,Part Numbers,Mfg Orders,Rhythm FP Planning Concept,FP Planning Concept,BTO(Build-to-order)engine:use,Demands,as the driver to create plan,Consider both material and capacity constraints at the same time,Consider both,Sales Orders,and,Forecasts,as the demand input with different priorities,Start as an,Infinite Capacity Plan,and progress to a,Finite Capacity Plan,FP Planning Concept,(cont.),Materials are assigned according to the BOM explosion from the finish good level,also consider Time factors,Raw Materials(Procured Parts)are supplied by on-hand inventory or P.O.from vendors.,Manufactured parts(finish goods and intermediate parts)are supplied by WIP or manufacturing orders(work orders).,Process Flow in FP,Infinite Capacity Planning,Finite Capacity Planning,CAO(constraint anchor optimization),Detail Scheduling,Identify Material and Capacity Problems,Fix Material Problems,Attempt to fix Capacity Problems,Create detailed schedules,FP Infinite Capacity Planning(ICP),Build factory model phase,Inventory Assignment phase,Planned start time phase,Capacity utilization phase,Presents plan through user interface(client),ICP-Build Factory Model,Read files into memory and create resident memory model,File formats in Spec Files,Do consistency checking,ICP-Inventory Assignment,Explore Bill of Materials,Determines BOM configuration and routing assignments,Creates manufacturing orders to satisfy demands,Net requirements for raw materials and sub-assemblies against on-hand inventory and WIP(Work-In-Process),Creates material requirements,ICP-Inventory Assignment,(cont.),Backward Schedule,Definition:Latest Possible Start Time(,LPST,)-the latest date a manufacturing task can begin and still complete on time,LPST=Task Due Date-Task Processing time,Calculates the LPST for each manufacturing task,Each manufacturing task will have a LPST,Soft constraint:violate LPST constraint will deteriorate the order-fulfillment performance,ICP-Inventory Assignment,(cont.),Backward Schedule,Subassembly 1,R.W.#1,R.W.#2,Sub,assembly 2,Computer,Order,Due Date,Task Due,Date(LPST),LPST,LPST,Mfg order#1,Mfg order#3,Mfg order#2,ICP-Inventory Assignment,(cont.),Inventory Assignment,Prioritize demand orders(due date,priority,quantity),Sort prioritized demand orders,Sort parts from end-item to raw materials,Calculate demands,Allocate supplies,ICP-Inventory Assignment,(cont.),Forward Schedule,Definition:Earliest Possible Start Time(,EPST,)-the earliest date that a manufacturing task can begin(constrained by materials),EPST=max(Server Start Time,Material Available Time),Calculates the EPST for each manuf
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 管理文书 > 施工组织


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!