EHTConstruction电伴热施工演示文稿

上传人:zuime****idai 文档编号:243071769 上传时间:2024-09-15 格式:PPT 页数:38 大小:1.02MB
返回 下载 相关 举报
EHTConstruction电伴热施工演示文稿_第1页
第1页 / 共38页
EHTConstruction电伴热施工演示文稿_第2页
第2页 / 共38页
EHTConstruction电伴热施工演示文稿_第3页
第3页 / 共38页
点击查看更多>>
资源描述
Click to edit Master title style,Click to edit Master text styles,Second level,Third level,Fourth level,Fifth level,*,单击此处编辑母版标题样式,单击此处编辑母版文本样式,第二级,第三级,第四级,第五级,*,单击此处编辑母版标题样式,单击此处编辑母版文本样式,第二级,第三级,第四级,第五级,*,EHTConstruction电伴热施工演示文稿,How to install a Self Regulating Heat Tracing System,Overview workshop,Features of Raychem Heat Tracing,Heat Tracing cable installation,Component installation,At the end of the installation,Raychem Heat Tracing cables,Features & Benefits,Heating cable range,Heating cable construction,Features & Benefits,Cold,Warm,Hot,Outer jacket,Braid,Insulating,jacket,Self-Regulating,core,responds to pipe temperature,Features & Benefits,Self-regulation,Parallel circuit,Unconditional T-classification,Heating cable range,Heating cable construction,Conductors,Spacer,Core,Fiber,Electricalinsulation,Outerjacket,Braid,Monolithic heaters,(BTV & QTVR),Fiber heaters,(XTV & KTV),Heating cable installation,Storage,Pre-installation checks,Cable handling,Positioning & attachment,Tracing,Storage,Pre-installation checks of material,Cable reference and Voltage rating,Transportation damages,Record cable details, batch nr,total length on reel,Pre-installation checks of material,Perform insulation resistance test and record values,Pre-installation checks of piping,Plan to fit in the construction schedule,Walk the system and plan the routing,Heating cable handling,To be avoided !,Heating cable positioning & attachment,Tracing a pipeline,300 mm,Tracing valves,Keep free,Tracing elbows,2”,Tracing flanges,2 x pipe,Tracing pipe bar hangers,Tracing welded pipe support shoes,Side,Under,Components installation,Installation instructions,Heating cable preparation,Components installation,Components installation,Detailed multilingual installation instruction in each kit,Heating cable preparation,Junction boxes & support brackets,Power connection,T-connection,X-connection,230 V,230 V,230 V,Connection kit,Insulation entry kit,End seal kit,Splice kit,Accessories,Fixing tapes,GT66 for carbon steel pipesfrom -5C to 130C,GS54 for stainless steel pipesbelow -5C up to 180C,Aluminium tape: ATE-180,Thermostats and control units,At the end of the installation,Checking the trace-heatingsystem,Thermal insulation,Power supply,Pre-commissioning,At the end of the installation,Extra tracing for valves installed properly?,Sensors OK?,Insulation resistance test,Sign off construction drawings,Thermal insulation,After thermal insulation,Power supply & electrical protection,rcd,Pre-commissioning,EHT Construction,Thanks for your attention,
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 建筑环境 > 机械电气


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!