资源描述
Click to edit Master title style,Click to edit Master text styles,Second level,Third level,Fourth level,Fifth level,*,单击此处编辑母版标题样式,单击此处编辑母版文本样式,第二级,第三级,第四级,第五级,*,单击此处编辑母版标题样式,单击此处编辑母版文本样式,第二级,第三级,第四级,第五级,*,EHTConstruction电伴热施工演示文稿,How to install a Self Regulating Heat Tracing System,Overview workshop,Features of Raychem Heat Tracing,Heat Tracing cable installation,Component installation,At the end of the installation,Raychem Heat Tracing cables,Features & Benefits,Heating cable range,Heating cable construction,Features & Benefits,Cold,Warm,Hot,Outer jacket,Braid,Insulating,jacket,Self-Regulating,core,responds to pipe temperature,Features & Benefits,Self-regulation,Parallel circuit,Unconditional T-classification,Heating cable range,Heating cable construction,Conductors,Spacer,Core,Fiber,Electricalinsulation,Outerjacket,Braid,Monolithic heaters,(BTV & QTVR),Fiber heaters,(XTV & KTV),Heating cable installation,Storage,Pre-installation checks,Cable handling,Positioning & attachment,Tracing,Storage,Pre-installation checks of material,Cable reference and Voltage rating,Transportation damages,Record cable details, batch nr,total length on reel,Pre-installation checks of material,Perform insulation resistance test and record values,Pre-installation checks of piping,Plan to fit in the construction schedule,Walk the system and plan the routing,Heating cable handling,To be avoided !,Heating cable positioning & attachment,Tracing a pipeline,300 mm,Tracing valves,Keep free,Tracing elbows,2”,Tracing flanges,2 x pipe,Tracing pipe bar hangers,Tracing welded pipe support shoes,Side,Under,Components installation,Installation instructions,Heating cable preparation,Components installation,Components installation,Detailed multilingual installation instruction in each kit,Heating cable preparation,Junction boxes & support brackets,Power connection,T-connection,X-connection,230 V,230 V,230 V,Connection kit,Insulation entry kit,End seal kit,Splice kit,Accessories,Fixing tapes,GT66 for carbon steel pipesfrom -5C to 130C,GS54 for stainless steel pipesbelow -5C up to 180C,Aluminium tape: ATE-180,Thermostats and control units,At the end of the installation,Checking the trace-heatingsystem,Thermal insulation,Power supply,Pre-commissioning,At the end of the installation,Extra tracing for valves installed properly?,Sensors OK?,Insulation resistance test,Sign off construction drawings,Thermal insulation,After thermal insulation,Power supply & electrical protection,rcd,Pre-commissioning,EHT Construction,Thanks for your attention,
展开阅读全文