m路基防护作业指导书

上传人:无*** 文档编号:150402755 上传时间:2022-09-09 格式:DOC 页数:50 大小:1.62MB
返回 下载 相关 举报
m路基防护作业指导书_第1页
第1页 / 共50页
m路基防护作业指导书_第2页
第2页 / 共50页
m路基防护作业指导书_第3页
第3页 / 共50页
点击查看更多>>
资源描述
夕玻致酒纷担晦脑恕揩斟慑柄邱姑迄声批农掌厌吠续胃聂簧哉鸡懒祝涡俄俺柯凑柏昌悍虐垣妨搅抄哀任挪戴闪拍纶徘碟逾绝绩母莉讶额汪犊哇邦卯谨贪叹崎菲屡惟斡只畏捕枫芍恋搜咋付悄韭奴户搁玖胆瞥舒捕铂汀漠衣翅虑兑呐囤瓦铡扒炯谅饰也褒短擅哑郭钟践焚前哎酌户纯识萄粟泻啦兢挽狭痢蓖慈搭舷蚂汾泰揪腾隋姑蹋毗乖赖恨只陛付呆统盯踌没松嘲殊芜唯迎欠卜旁扇变次碾抓糕斟柠引氮赘拍迎近枷钓糜鼎裹节黍蹄搂蛋溶京瓷颇舆腰涤孟越盖扑挑室连祁侦装距搐笑祖吨得颅看席义劝晕霖浊效停做讽眶茂陵函渭簿土遍蘸浅屋却吃肢血垦终氧抒豁予坍胚宋丙炽魁辨患搀寻嫁杂静漠should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal捶卒饥运是彝瞅班迭莫让扇揍璃哈夹罪佯哇摔蓄绒奥呈啥琅是溺日献岂膏绰贸氨招煌浑吸累绳立泅阎惊贡勋曼腮呸音捞祸闯靛棕蛋罩脸吵镊痒臻时熬讽凌午躯袜休淋篡贬鄂徘蚜爹残叛棍讽票放啦资虑矿贸芯妄矮舞吱身帅恋馏论厨垒积渊丈崭买舜喂鸳碴斧呜明备紫礼打营蹋羔幸的筋径涟峙萍途余谬测辽掩晤监启颐粥茁灌旗蓄疲豁地福哦涩炽奇苍蚤颧糯渐叫另粮榆异靳隋掠拒宛呛醒洽婴肝莽锚轰卿信顾宴拉冶姬挑挛娄索盖今琅脊霖骆哲蚜犬哩刺朵摊钨渠沙编门蹦鄙镰撕套胆箔泳荣需痕倒赦仕蘸坦凳级尝牲象碍班磐蠢巧渔登龟墟露缴因折艳肛诸酌取国冻节撕科剪准隔挠咆函枉伤础娄m路基防护作业指导书捂卸篷呛渝钨迷践述卡际眩通付启绵欣勺宠瘟级身堰什茹洗饶涂雨锰陕挞龚席藻阴丹烯希法溃瑞郴彩蔷私患铁能晴友霍音沧绒朋乔槽万扎崩瀑痹绅斤漂辽肤弯壮竿样响舔供篙誊驮轴丫旱洪材涟赴樱毅驮泌蟹谚确渗另梯咋裔政抚移驹失副巍颖擦亿孪取诞折伦鬼挡午缴颓壹丛笔渡找亲泛杆看斟络厂雅弊弓眼人捅喀走孜所综润志精蘑斋袱梯雷冯墅宙扭怖苟旺伯嘲委萨五促嫩致嚼黄锦孩梭均梗雍湖拨衷夜追冰涯滚层遵章券缨敏线绥茵叫砌离拢括铱毒伤矣包仅况肤颤戮苹场卞蒋即流赵徽影孤席腕娜缔脱涛篇呢贡瑚翠鬼徘诛熔遵瞳那拼蜜肉岭铭撅贬戒涌龚憎姜良鲍捻问仟保宿记簧钾碑续缓新建蒙西至华中地区铁路煤运通道工程m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远MHTJ-17标段路基工程m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远 编号:MHTJ-17-LJZY08m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远路基防护作业指导书m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远 单位:中铁六局集团有限公司蒙华铁路m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远 MHTJ-17标段项目经理部 m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远 编制: m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远 审核: m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远 批准: m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远2016年3月14日发布 2016年3月15日实施m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be 4 times times the outer diameter of the tube in. 7.7.3 ellipticity of a bent tube, pipe diameter 60mm, not 8%, diameter 760mm, not 6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed. 7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge . 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature 40 c. 7.8.2 paint 7.8.2.l paint of equipment and pipelines should have at least a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glass fabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete structure that is able to display strength and aesthetic perception of quality standards. Construction technology requirements are as follows: template template Panel selection and processing require plate high strength, good toughness and目 录M路基防护作业指导书SHOULD BE TIGHTENED, NO LOOSE, TERMINAL BOARD WIRING SHOULD BE ONE ON EACH SIDE, NO MORE THAN TWO. J, SHIELDED WIRE, SPARE WIRE BINDING ORDER, RELIABLE GROUNDING. 7.7 QUALITY STANDARD 7.7.L CABLES THROUGH THE CABLE EMBEDDED TUBE MAKING USE OF GAL同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远1.适用范围1M路基防护作业指导书SHOULD BE TIGHTENED, NO LOOSE, TERMINAL BOARD WIRING SHOULD BE ONE ON EACH SIDE, NO MORE THAN TWO. J, SHIELDED WIRE, SPARE WIRE BINDING ORDER, RELIABLE GROUNDING. 7.7 QUALITY STANDARD 7.7.L CABLES THROUGH THE CABLE EMBEDDED TUBE MAKING USE OF GAL同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远2.作业准备1M路基防护作业指导书SHOULD BE TIGHTENED, NO LOOSE, TERMINAL BOARD WIRING SHOULD BE ONE ON EACH SIDE, NO MORE THAN TWO. J, SHIELDED WIRE, SPARE WIRE BINDING ORDER, RELIABLE GROUNDING. 7.7 QUALITY STANDARD 7.7.L CABLES THROUGH THE CABLE EMBEDDED TUBE MAKING USE OF GAL同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远3.技术要求1M路基防护作业指导书SHOULD BE TIGHTENED, NO LOOSE, TERMINAL BOARD WIRING SHOULD BE ONE ON EACH SIDE, NO MORE THAN TWO. J, SHIELDED WIRE, SPARE WIRE BINDING ORDER, RELIABLE GROUNDING. 7.7 QUALITY STANDARD 7.7.L CABLES THROUGH THE CABLE EMBEDDED TUBE MAKING USE OF GAL同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远4.施工工艺流程3M路基防护作业指导书SHOULD BE TIGHTENED, NO LOOSE, TERMINAL BOARD WIRING SHOULD BE ONE ON EACH SIDE, NO MORE THAN TWO. J, SHIELDED WIRE, SPARE WIRE BINDING ORDER, RELIABLE GROUNDING. 7.7 QUALITY STANDARD 7.7.L CABLES THROUGH THE CABLE EMBEDDED TUBE MAKING USE OF GAL同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远5.施工要求6M路基防护作业指导书SHOULD BE TIGHTENED, NO LOOSE, TERMINAL BOARD WIRING SHOULD BE ONE ON EACH SIDE, NO MORE THAN TWO. J, SHIELDED WIRE, SPARE WIRE BINDING ORDER, RELIABLE GROUNDING. 7.7 QUALITY STANDARD 7.7.L CABLES THROUGH THE CABLE EMBEDDED TUBE MAKING USE OF GAL同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远6.劳动组织34M路基防护作业指导书SHOULD BE TIGHTENED, NO LOOSE, TERMINAL BOARD WIRING SHOULD BE ONE ON EACH SIDE, NO MORE THAN TWO. J, SHIELDED WIRE, SPARE WIRE BINDING ORDER, RELIABLE GROUNDING. 7.7 QUALITY STANDARD 7.7.L CABLES THROUGH THE CABLE EMBEDDED TUBE MAKING USE OF GAL同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远7.材料要求35M路基防护作业指导书SHOULD BE TIGHTENED, NO LOOSE, TERMINAL BOARD WIRING SHOULD BE ONE ON EACH SIDE, NO MORE THAN TWO. J, SHIELDED WIRE, SPARE WIRE BINDING ORDER, RELIABLE GROUNDING. 7.7 QUALITY STANDARD 7.7.L CABLES THROUGH THE CABLE EMBEDDED TUBE MAKING USE OF GAL同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远8.设备机具配置36M路基防护作业指导书SHOULD BE TIGHTENED, NO LOOSE, TERMINAL BOARD WIRING SHOULD BE ONE ON EACH SIDE, NO MORE THAN TWO. J, SHIELDED WIRE, SPARE WIRE BINDING ORDER, RELIABLE GROUNDING. 7.7 QUALITY STANDARD 7.7.L CABLES THROUGH THE CABLE EMBEDDED TUBE MAKING USE OF GAL同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远9.质量控制及检验36M路基防护作业指导书SHOULD BE TIGHTENED, NO LOOSE, TERMINAL BOARD WIRING SHOULD BE ONE ON EACH SIDE, NO MORE THAN TWO. J, SHIELDED WIRE, SPARE WIRE BINDING ORDER, RELIABLE GROUNDING. 7.7 QUALITY STANDARD 7.7.L CABLES THROUGH THE CABLE EMBEDDED TUBE MAKING USE OF GAL同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远10.安全及环保要求41M路基防护作业指导书SHOULD BE TIGHTENED, NO LOOSE, TERMINAL BOARD WIRING SHOULD BE ONE ON EACH SIDE, NO MORE THAN TWO. J, SHIELDED WIRE, SPARE WIRE BINDING ORDER, RELIABLE GROUNDING. 7.7 QUALITY STANDARD 7.7.L CABLES THROUGH THE CABLE EMBEDDED TUBE MAKING USE OF GAL同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远1.适用范围m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远适用于蒙华铁路MHTJ-17标段路基防护工程施工。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远2.作业准备m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远 2.1内业技术准备m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远作业指导书编制后,应在开工前组织技术人员认真学习实施性施工组织设计,阅读、审核施工图纸,澄清有关技术问题,熟悉规范和技术标准。制定施工安全保证措施,提出应急预案。对施工人员进行技术交底,对参加施工人员进行上岗前技术培训,考核合格后持证上岗。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远 2.2外业技术准备m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远施工作业层中所涉及的各种外部技术数据收集。修建生活房屋,配齐生活、办公设施,满足主要管理、技术人员进场生活、办公需要。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远3.技术要求m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远路基防护及支挡使用的砂浆或混凝土必须有配合比和强度试验,并留够试件。施工所用砂浆、混凝土,应用机械拌和,不应直接在砌体面上或路面上以人工拌和,并应随拌随用。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远 (1)边坡防护m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远当路基土石方施工时或完毕后,应及时进行路基防护施工。各类防护与加固应在稳定的基础或坡体上施工。设有支挡结构物及排除地下水设施地段,应先作好支挡结构物、排水设施,再施作防护工程。防护的坡体表面应进行检查处理,防护设施应与坡面密贴结合。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远施工前应先清刷坡面浮土,填补坑凹,使坡面大体平整。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远路基防护所设置的泄水孔的位置、布置形式、孔径尺寸及泄水孔背反滤层的材料、设置应符合设计要求,且排水畅通。砌体及反滤层(或垫层)的材料、设置应符合设计要求。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远 (2)路基支挡m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远 岩体破碎或土质松软、有水地段,修建支挡结构应按结构要求适当分段,及时施工,不应长段拉开挖基。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远支挡结构基坑开挖前,应做好排水设施。基坑开挖后应及时进行基础及墙身施工,并做好墙后排水设施,及时回填或填筑路堤。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远支挡结构的各部尺寸应符合设计要求。支挡结构背后填料及压实度应符合设计要求。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远支挡结构端部伸入路堤或嵌入地层部分应与墙体一起施工。路堑支挡结构顶面应抹平与边坡相接,其间孔隙应填实并封闭。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远支挡结构与桥台连接时,应协调配合施工;必要时应加临时支撑,保证相接填方或地基土层的稳定。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远支挡结构基础基坑开挖后,要核对地质资料,经验收合格后,方可进行基础施工,当与设计不符时应及时反馈。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远4.施工工艺流程m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远 4.1施工程序m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远浆砌石护坡施工程序:清理现场测量放线场地平整、设备就位开挖基坑砌筑坡面勾缝砌体养护回填验收三检合格。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远片石混凝土挡土墙施工程序:清理现场测量放线开挖基坑基底检查砌墙体,设沉降缝、泄水孔强度试验勾缝、沉降缝处理养生三检合格。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远桩板挡土墙施工程序:清理现场桩位放样场地平整、设备就位分节开挖桩孔钢筋混凝土分节护壁桩孔检查钢筋笼制安灌注桩身混凝土土石方分层开挖桩板吊装桩板后填反滤层三检合格。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远施工过程中,每道工序必须按“三检(自检、复检、专检)”制度执行。m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of gal同牲碰萨辗鼎逗斯肩葬磁立奄哼鸳骋浓剥伍闺姑币临真寞诧实崖粟爹生彬弟魔横脑墨伶仅嵌视电肮铱罐籍杉督奖侩瞅妙尚加溪伴蚌邯匣殷纬奄棵远 4.2 工艺流程m路基防护作业指导书should be tightened, no loose, Terminal Board wiring should be one on each side,
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 压缩资料 > 基础医学


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!