AliAzzamResumeCivilEngineerwith10yearsexperience

上传人:沈*** 文档编号:145064107 上传时间:2022-08-28 格式:DOC 页数:5 大小:1.27MB
返回 下载 相关 举报
AliAzzamResumeCivilEngineerwith10yearsexperience_第1页
第1页 / 共5页
AliAzzamResumeCivilEngineerwith10yearsexperience_第2页
第2页 / 共5页
AliAzzamResumeCivilEngineerwith10yearsexperience_第3页
第3页 / 共5页
点击查看更多>>
资源描述
Ali Mohammad Azzam Ten (10) Years Experience Civil Engineer.Mobile: +2010 23861110E-mail: aliazzam_emPortsaid, Egypt.Objectives:- Looking to join a progressive organization that has the need for civil engineers and offers opportunities for advancement.- Seeking new challenges in civil engineering field which effectively utilizes my professional experience.Personal Information:- Nationality: Egyptian.- Date of Birth: 24th January 1981.- Marital Status: Single.- Driving License: issued in U.A.E. in July 2006.Education:-Bachelor of Science in Civil Engineering Suez Canal University, Egypt. September 1997 - May 2002-PMP: Successfully completed the program titled PROJECT MANAGEMENT CPM001 Project Management Body of Knowledge - 2004. July 2008 August 2008. Work Experience: Ten (10) years (from July 2002 to July 2012)March 2011: Present Time.- Company: Advanced Construction Services Est.- Country: United Arab Emirates.- Advanced Construction Services Est. is one of the new and well-reputed companies in Abu Dhabi, handles medium scale projects.- Position: Project Manager.January 2006: January 2011.- Company: Beijing Construction Engineering Group Co. (International Company).- Country: United Arab Emirates.- BCEG is one of the top ten construction companies over all China and had been through a lot of international projects around the world.- Position: Senior Project Engineer & Project Coordinator.July 2002: May 2005, Egypt.- Company: Tolba for Engineering and Contractions .- Country: Egypt.- Tolba Company is a leading general contracting company in Egypt. - Position: Site Engineer.Duties and ResponsibilitiesAs Senior Project Engineer for High Rise Buildings Projects, I am responsible for the control of all construction activities at site. I report directly to the Construction Manager/Project Manager, As well to be responsible for all the junior engineers, foremen/ Sub contractors and workmen under their control.As A Project Coordinator I am requested to be responsible for the day to day management and coordination of civil and MEP site works and to participate in executive meetings and progress meetings, subcontractor/MEP subcontractors, to report to the project manager and also responsible for coordination with other discipline and between various subcontractors on sites.Routine Duties and Responsibilities are:1. Ensure all work activities are in conformance with drawings, contract requirements / specification method statement.2. Ensuring specification and drawings are reviewed and any unclear issues have been sorted out.3. Ensuring necessary method statements, quality and safety documentation are developed and are approved before start of works, necessary liaison with quality and safety departments.4. Ensuring risk assessments / job hazard analysis is done in advance of commencement of activities and ensuring all preventive control measures are in place.5. Ensuring material, equipment and required manpower are requested and are available on site as required and their optimal utilization.6. Ensuring required inspection and tests are carried out and completely records of successful completion of works.7. Interaction QA/QC engineers, safety engineers, independent testing laboratory, sub contractors for the same.8. Ensure employer / project manager approvals for hold and points identified on the inspection and test plan.9. Ensure all non conformance issues are resolved and closed out liaise with QA/QC engineer and safety engineers for taking preventive and corrective actions.10. Adequate training of the people under their control, in both the required procedures and specialist applications.11. Ensuring foremen under their control, carry out tool box talk before start of any activity and as a routine refreshes.12. Reporting progress to the Construction Manager.13. Responsibilities for keeping “As built” records and ensuring this in reflected on the drawings as work progress.14. Responsible for incoming quality of received materials and acceptance of same along with the designated storekeeper15. Responsible for completion of all punch items and hand over of their respective areas.Projects:- U.A.E. :1- FIRST ABU DHABI SHAMS- Al Reem Island, Abu Dhabi.Budget: 750,000,000 USD Project Duration: 34 Months(High Rise Buildings : four towers 80 stories height)2- Al Reem Island Development Area 1/Sector 1/Plot 1 , Abu Dhabi (NPC JV BCEG) .Budget: 400,000,000 USD Project Duration: 36 Months.(Two High Rise Buildings , the fist tower is 48 stories and the second tower is 38 stories height.3- Construction for Raed Al Jebaly Building (G+M+20), AL Jewis, Ras Al Khaimah.Budget: 7,000,000 USD Project Duration: 12 Months.4- Construction for Al Shahin Building (G+M+16), Al Maairedh, Ras Al Khaimah.Budget: 4,500,000 USD Project Duration: 13 Months.5- Construction for 50 villas (Two Storied), Ghalilah, Ras Al Khaimah.Budget: 17,000,000 USD Project Duration: 18 Months.6- Construction for 15 villas, Sheikh Zayed Housing Program, Ras Al Khaimah.Budget: 5,000,000 USD Project Duration: 12 Months.7- Maintenance for (28) houses, Shammel, Ras Al Khaimah.Budget: 4,000,000 USD Project Duration: 3 Months.8- Maintenance for (26) houses, Khour Khwier, Ras Al Khaimah.Budget: 4,000,000 USD Project Duration: 3 Months.9- Maintenance and Extensions for Tonob Secondary School, Ras Al Khaimah.Budget: 800,000 USD Project Duration: 30 Months.10- Maintenance and Extensions for Abu Hurairah Mosque, Julfar, Ras Al Khaimah.Budget: 600,000 USD Project Duration: 30 Months.- Egypt :1- Construction for Ali Soleiman Educational Institution Group, Portsaid.Budget: 6,000,000 USD Project Duration: 12 Months.2- Construction for Aljabal Primary School, Portsaid.Budget: 2,000,000 USD Project Duration: 10 Months.3- Construction for International Pipes Industrial Factory, Portsaid(sub contractor).Budget: 10,000,000 USD Project Duration: 6 Months.4- Construction for Alternative Gas Derivatives Factory, Portsaid(sub contractor).Budget: 15,000,000 USD Project Duration: 10 Months.5- Construction for AIWA Sweets Factory, Portsaid.Budget: 40,000,000 USD Project Duration: 18 Months.6- Construction for The Civilized Health Care Centre, Portsaid.Budget: 3,000,000 USD Project Duration: 12 Months.7- Construction for The Emergency Hospital, Portsaid.Budget: 6,000,000 USD Project Duration: 18 Months.8- Construction for Al Masah Al Bahary Hospital, Portsaid.Budget: 6,500,000 USD Project Duration: 18 Months.9- Maintenance and extension for Al Dibah Primary School, Portsaid.Budget: 1,500,000 USD Project Duration: 9 Months.10- Maintenance for Marine Transportation building, Cairo.Budget: 2,000,000 USD Project Duration: 12 Months.11- Maintenance for Kaliob-Shebin Railway line Stations, Cairo.Budget: 4,000,000 USD Project Duration: 12 Months.Authorities and Consultants: (have been supervised by)U.A.E:- ADM.- CANSULT MAUNSELL LIMITED.- Sorouh/HILL International.- R W Armstrong.- TAMOUH Investments.- GDP Architects Interiors.- Architecture & Planning Group - APG- Ministry of Public Work.- ADDC- ETISALAT, UT Technology.- Abu Dhabi Municipality- Sheikh Zayed Housing Program.- Municipality of Ras Al-Khaimah.- FEWA, and other consultants.Egypt:- Educational Buildings Authority.- Ministry of Health- Ministry of Transportation.- Egypt Railways Authority- General Authority of Petrol, and other consultant offices.Areas of Expertise:CONTSRUCTION FIELD:- Internal Coordination between the company departments.- Coordination between the company and the local authorities.- Coordination between the company and the client or the consultant.- Project logistics.- Excavation and Dewatering works- Sub-structure and Super-structure concrete works- Interior Design & Finishings works.- Quantity surveying.- Pricing and tender bid preparation.- Engineering Computer Programs.Abilities:- Initiate a project.- Plan project works.- Execute project works.- Monitor and control project schedule, quality, staffing, and communications.- Close and hand over the project.Skills and Capabilities:- Excellent analytical skills and problem solving.- Good and effective negotiator.- Good communication skills, oral and written, (English and Arabic).- Familiar with MS Office package and engineering programs (AutoCAD, Primavera)Affiliation:- Member of U.A.E. Society of Engineers.- Member of Egypt Engineers Syndicate.References: Furnish upon request.Expected Salary is 14000 Dhs. (transportation allowance is nod included and depends on site location)Ali Muhammad Azzam
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 办公文档 > 工作计划


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!