rw鹿泉制梁场箱梁预制施工组织设计(修改2)

上传人:痛*** 文档编号:141573595 上传时间:2022-08-24 格式:DOC 页数:139 大小:1.64MB
返回 下载 相关 举报
rw鹿泉制梁场箱梁预制施工组织设计(修改2)_第1页
第1页 / 共139页
rw鹿泉制梁场箱梁预制施工组织设计(修改2)_第2页
第2页 / 共139页
rw鹿泉制梁场箱梁预制施工组织设计(修改2)_第3页
第3页 / 共139页
点击查看更多>>
资源描述
recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emitted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers, operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the living environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 daily by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civilized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt into other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at all times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine materialWe will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of evaluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zero resistance. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthening Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medical, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to implementation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance management. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full play levels cadres in enterprise development in the 京石客运专线石太直通线JS-4标段箱梁预制施工组织设计箱梁预制施工组织设计1.编制依据1.1施工总承包招标文件、有关设计图纸、资料。1.2 国家和铁道部颁发的现行铁路工程施工技术规范、规程、验收标准及工程建设相关文件。1.3 对本标段现场实地踏勘调查了解的有关情况以及本单位在福厦铁路客运专线的施工经验。 1.4 国内外相关高速铁路的施工工艺及科研成果当前客运专线铁路建设的技术水平、管理水平和施工装备水平。 1.5本集团公司经认证的质量手册和程序文件。1.6 为完成本标段桥梁生产拟投入的专业技术人员、机械设备等资源。1.7客运专线高性能混凝土暂行技术条件 铁建设200313号1.8客运专线桥梁混凝土桥面防水层暂行技术条件 铁建设200313号1.9 客运专线桥梁盆式橡胶支座暂行技术条件 铁建设200313号1.10 客运专线桥梁伸缩装置暂行技术条件 铁建设200313号1.11 铁路桥涵设计基本规范 TB10002.1991.12 铁路桥涵钢筋混凝土和预应力混凝土结构设计规范 TB10002.3991.13 铁路桥涵施工规范 TB1020320021.14 铁路混凝土与砌体工程施工规范 TB1021020021.15 铁路混凝土与砌体工程施工质量验收标准 TB1042420031.16 铁路桥涵工程质量检验评定标准 TB1041520031.17 铁路混凝土强度检验评定标准 TB1042519941.18 铁路混凝土桥梁桥面TQF型防水层技术条件 TB/T29651999 1.19 铁路混凝土工程预防碱骨料反应技术条件 TB/T305420021.20 预应力混凝土铁路梁静载弯曲试验方法及评定标准TB/T209220031.21客运专线预应力混凝土预制暂行技术条件 铁建设2004120号2.编制原则2.1遵循招标文件,严格按照招标文件要求的工期、质量、安全、环保、文明施工、信息化管理等目标编制施工组织设计,使发包人的各项要求均得到有效保证。2.2严格执行国家、铁道部颁发的现行规范、规程及有关的法律法规,遵循设计原则。2.3合理安排生产,合理安排劳力、材料和机械设备,优化资源配置,充分考虑生产中技术间隔时间、气候、季节对工期的影响,采取相应措施,确保合同工期,并力争提前。2.4执行ISO9001质量标准,制定科学合理的技术方案,采用先进的施工方法和生产工艺,确保每道工序、每项分项工程的质量达到优质工程要求。2.5确立安全目标,制定科学合理的施工方案,确保安全生产。2.6文明施工、环境保护的原则。2.7节约资源和可持续发展的原则。贯彻“十分珍惜、合理利用土地和切实保护耕地”的基本国策,依法用地、合理规划、科学设计,少占土地,保护农田。3工程概况本梁场生产京石铁路石太直通线双线整孔简支箱梁梁234孔,其中32m箱梁224孔,24m箱梁9孔,20m箱梁1孔。箱梁架设跨青银高速公路特大桥,架设起讫里程为DK7+699.45m-DK16+116.23m,共计架设距离为8416.78 m,所架桥内有4处现浇连续梁,计832m。中铁二十一局京石铁路项目经理部鹿泉制梁场地处鹿泉市上庄镇钟家庄村,位于京石铁路石太直通线跨青银高速公路特大桥右侧,供梁范围为石太直通铁路线DK7+699.45DK16+116.23,箱梁架设跨青银高速公路特大桥。架设桥设计最大线路纵坡为18,最小线路纵坡为-1, 地震动峰值为0.05g,地震烈度为6度,桥最小曲线半径为R:5000m。制梁主要控制指标是:箱梁按100年使用要求制造,采用高性能砼,每榀箱梁灌注时间6小时以内,严格控制客运专线轨道铺设后箱梁的徐变上拱值,保证上拱值不大于20mm,箱梁存放或运输时,四支点的不平整度不大于2mm。采用后张预应力施工方法预制箱梁。梁场负责箱梁的预制、储存运输及架设。箱梁采用900t架桥机架设。4. 箱梁预制施工方案4.1施工人员组织根据本工程的实际情况,我公司成立 “中铁二十一局集团京石铁路鹿泉制梁场”,负责该标段箱梁预制、运架的施工组织管理和指挥。梁场管理机构设项目经理1人,副经理1人,总工程师1人,副书记1人,安全总监1人 ,共5部1室, 共计34人。制梁场下辖4个架子队负责施工。施工组织机构为:4.1.1各职能部室的配备与职责综合部5人:负责对外联系协调、接待、文秘及日常生活的管理工作。工程技术部8人:负责施工组织、技术管理、工程控制测量、办理工程变更手续及工程技术资料的填报、收集归档、编制竣工文件等工作。安全质量部6人:负责工程质量的监督、检查、评定及各项施工安全管理办法及施工安全检查工作(辖设1个检查班)计划、财务部5人:负责施工计划安排、统计、验工计价工作, 负责施工资金的管理和筹措工作。物资设备部3人:负责施工机械设备及车辆的使用管理和施工用水、用电管理,以及机械设备零配件的采购和供应工作, 负责工程所需物资及施工材料的采购、验收及保管。试验室6人:负责工程原材料(成品、半成品)的检验和试验,配合业主中心试验室选定各种混凝土、砂浆配合比以及各种土工试验工作。后附组织机构图。 经 理 副经理总工程师副书记 安全总监工程技术部安质环保部物资设备部计划财务部综合部预制梁架子队运架梁架子队场区建设架子队拌合站试验室4.1.2各工段劳动力配备及任务安排根据本工程的特点,我公司将安排有丰富的现场施工经验的管理人员、技术能力强的技术人员及操作技能高的施工人员进场施工,雇用部分劳务参与,并在上场前根据工程类别做好相应的技术培训,经考核合格后上岗。施工机械设备的配备以满足施工需要为前提,适当增加部分应急机械。各工段和人员安排计划如下:拟投入本工程项目的施工单位及人员配备计划表序号施工组名称管理人员专业人员工人任务划分1土建架子队(建场)510105负责梁场土建工程施工2预制梁架子队810225负责制梁过程中模板安装、拆卸、修理和混凝土浇筑、养护;钢筋加工、绑扎、安装;预应力张拉、桥面防水及保护层施工等3混凝土搅拌站架子队2315负责混凝土的拌和、运输等4运、架梁架子队51060负责梁体的提运、运、架4.2.预制场主要生产设备、工装、检测设备配备a.主要生产设备、工装配备表预制场配备满足生产需要的各种机械设备和工装,详见附表。鹿泉制梁场工程机械设备配置计划表序号名称规格型号单位数量备注1搅拌站2m3座2含2m3主机4台,皮带机4台,集料斗16个,皮带称4台,散装罐20个2混凝土运输罐车8m3台4单纯制梁则考虑4台即可3混凝土布料机台3平摆式4高低压混凝土输送泵80m3/h台3出口压力不得低于16Mpa5混凝土泵车37m辆2如购置则可减少3台布料机及3台混凝土输送泵,同时可增加箱梁灌注的机动性6门吊 10t台1高度7m,跨度43m7门吊 80t台2高度15m,跨度43m8门吊450t台2高度28m,跨度35m9汽车吊25t辆110汽车吊50t辆111架桥机900t台112自卸翻斗车20m3辆2调入13蒸汽锅炉4t台1快装式14运梁车900t辆115轮式装载机50C辆3如没有土方施工,可选择购置855型轮式装载机。16静载试验台32m台117全电子汽车衡150t台118底模个619桥梁钢外模个420桥梁钢内模个421钢筋绑扎台座32.6133.5m个422养生罩3414.24.5m个223风雨棚33.516+6.5m个124竖墙钢模组225遮板钢模个4026电缆沟盖板模型个30027声屏障钢模个1228钢筋笼吊架3313.2m个129附着式振动器台7230振动棒根2031提浆整平机32米台232氧、乙炔割炬套233落梁千斤顶400t台5配油泵3台34电焊机500台135电焊机315台336弯曲机台337切断机台338对焊机100KVA台239小型自卸翻斗车辆240空气压缩机0.8m3台 1电动式或内燃式41搅拌机1 m3台142卷扬机2t台543磁座钻32mm台1b.主要检测设备配备表预制场配备满足生产需要的各种试验、检测设备,详见下表:预制场主要试验、测量、检测仪器设备一览表序号设备名称规格技术指标或精度单位数量用途1静载试验台及其配套设施24m/32m套1整孔桥梁静载试验2压力试验机TYE-2000B一级2000KN,精度1%,恒载波动0.5%台1混凝土强度试验3万能试验机600KN,精度1%,恒载波动0.5%台1钢筋力学试验4活塞压力计活塞压力计配置标准:母表采用精密压力表,精度等级:0.25级块25压力校验仪台1梁场自检定6水泥负压振动台台1水泥常规检验7水泥胶砂搅拌机JJ-51405台1水泥常规检验8水泥净浆搅拌机NJ-160A1405台1水泥常规检验9水泥恒应力试验机HYE-300kN一级台1水泥常规检验10水泥胶砂流动度检测仪NLB-3100.2mm台1水泥常规检验11水泥胶砂振动台ZS-15台1水泥常规检验12水泥标准养护箱微机自控2个1水泥常规检验13电动抗折试验机KZJ-500一级台1水泥常规检验14雷氏沸煮箱FZ-31A4000-6000Pa台1水泥常规检验15箱式电炉SX-2.5-120-1200个1防水材料检验16负压筛析仪FYS-150B-3 -6KPa台1水泥常规检验17水泥恒温恒湿养护箱JG-40B0.1台1水泥常规检验18水泥抗压夹具40mm40mm个1水泥常规检验19水泥比长仪ISOBY-1600.001mm台1水泥常规检验20水泥比重瓶0.1ml个2水泥常规检验21粉煤灰细度筛0.045套2掺和料检验22水泥细度筛0.08mm套2水泥常规检验23笔式PH计PHB-80.1个1水分析24水泥砂浆稠度漏斗个225水泥量水器套1水泥常规检验26勃氏透气比表面积仪DBT-127台1水泥常规检验27净浆标准稠度及凝结时间测定仪300 g1 g台1水泥常规检验28水泥留样筒个50水泥常规检验29电炉温度控制器KSW-6D-166KW个130电子智能拉力试验机DL-2000一级台1力学实验31冷弯冲头32件/套个1力学实验32钢丝反复弯曲机WS-81HR台1钢绞线力学实验33钢绞线夹具个1钢绞线力学实验34工作测力仪0-100KN级台135钢筋腐蚀测量仪PS-6台136砂、石套筛套各1砂石常规检验37台秤台1砂石常规检验38案秤个1砂石常规检验39烘箱个1砂石常规检验40强制式搅拌机50L台1混凝土常规检验41混凝土拌合物含气量测试仪台1混凝土常规检验42混凝土试模组30混凝土常规检验43混凝土试件振动台台1混凝土常规检验44标准养护室自动控制,相对湿度:95%,温度:202;间1混凝土常规检验45精密天平TG328A200g-0.1mg架1试验计量器具46电子天平YP10000.1g(三级)架1试验计量器具47电子天平YP10001g(三级)架1试验计量器具48电子天平5000.01g(三级)架1试验计量器具49托盘天平HC-TP-121000g-1g架1试验计量器具50混凝土拌合物测温计个20混凝土常规检验51洛氏硬度计HR-150A30-130个1锚具检验52位移计个253柔度棒RB-7套154新标准砂袋20水泥常规检验55AUX空调台156电子恒温水温箱HH.W21.6001台157火焰光度计6400ACv2%个158无油气体压缩机WM-40.18MPa台159百分表块10计量60千分表块10计量61混凝土保护层厚度测试仪台1砼保护层测定62钢卷尺30m,50m1mm把3计量63弹簧秤个2计量64大量程游标卡尺1m把1测量65水准仪NA28台2测量66全站仪GPT-3002N台1测量67钢板尺把4梁场自制量具68直角尺把4梁场自制量具69L型尺把4梁场自制量具70U型尺把4梁场自制量具71水平杆把4梁场自制量具72跨度样板把4梁场自制量具73夹尺钳把4梁场自制量具74分中规把4梁场自制量具4.3.总体施工方案4.3.1预制场方案4.3.1.1预制场选址通过对京石线JS-4标DK7+699-DK16+116段线路两侧多次实地考察与调查,经过对实地考察点进行对比分析后,鹿泉梁场最终选址与京石铁路石太直通线跨青银高速公路特大桥右侧,梁场中心里程为DK12+433处。4.3.1.2预制场布置本箱梁预制场占地约188亩,沿新建石太直通线线路右侧布置。鹿泉制梁场分为箱梁预制区、箱梁横移存放区、桥梁发运区、辅助生产区、生活及办公区、实验室、混凝土拌和站,各区之间通过混凝土路面的通道相连,除存梁区外其它地面全部硬化、绿化。箱梁预制区:在生产区布置32m箱梁生产台座6个,底模6套,侧模4套,内模4套,内模拼装台位4个,钢筋绑扎胎模3个,理论设计生产能力为30孔/月,考虑受天气、机械故障等因数影响,鹿泉梁场箱梁预制按24孔/月考虑。箱梁横移存放区与每个制梁台座对应设8个存梁台座,对应6排,共48个存梁台座最大存梁能力为54孔。箱梁的横移采用横移台车通过横移轨道移入存放区。 桥梁发运区:建造运梁便道400m,设2台450t-35m跨墩提升龙门吊,用于箱梁的吊运、装车,设置架桥机拼装区一处。龙门吊下设6个临时支墩,其中1个可设置做静载实验台。横移存梁区:采用横移台车对箱梁进行横移,横移轨道基础和存梁台座基础共用。辅助生产区:设钢筋加工车间、铆焊维修车间、综合材料库、移动式变电站、钢筋存放区、砂石料存放场。混凝土拌和站:混凝土拌和站为2台2m3主机的双机站,其主要配置为皮带机4台,集料斗16个,控制台4个,散装罐20个,蓄水池1个,外加剂罐4个,每小时可供应高性能混凝土60-70m3,供应普通混凝土240m3。实验室:梁场设置一个工程实验室,占地面积350m2,主要承担箱梁预制所必需的原材料、混凝土、锚具等的检验试验,以及制梁过程钢筋焊接、混凝土灌注等过程的监控。生活办公区:生活和办公用房采用活动式板房结构。建筑面积约为9785m2。协力队伍的住房考虑外租形式解决。4.3.2施工技术方案概述为确保梁体几何尺寸和外观质量,箱梁预制采用整体钢底模,铰接固定式整体钢侧模,液压与机械相结合的全自动钢内模。由于梁体钢筋多达65t,为减少制梁台座占用时间,同时保证施工质量,将梁体钢筋整体在预绑扎台座上绑扎好后,用2台80t龙门吊将其吊至制梁台座进行组装;内模通过固定的轨道进入钢筋笼内部,预应力管道采用直径90(80)mm橡胶棒抽拔成孔,橡胶棒与底、腹板钢筋一起在预绑扎台座上安装固定。梁体高性能混凝土采用强制式混凝土拌合站集中搅拌,采用混凝土输送罐车送至制梁台座旁的2台HBT80型混凝土输送泵配合2台布料机浇筑入模。梁体混凝土振捣方式为:底板和顶板采用插入式振捣器,腹板采用插入式振捣器配合附着式振动器振捣。浇筑时采用水平分层、斜向分段,先浇筑底腹板,再浇筑底板,最后依次浇筑腹板和顶板,连续一次浇筑成型;采用提浆整平平机和收浆平台配合抹面施工。预制的箱梁在初张拉前采用蒸汽低温养护,使梁体砼芯部温度控制在60以内。预应力一般采取三次张拉,当梁体混凝土强度达到设计强度的80时,一般采用二次张拉,预应力筋采用机械穿束,4台穿心式自锁千斤顶两端同步两侧对称张拉。当梁体混凝土强度和弹模均达到80%设计值后在制梁台座上进行初张拉;经初张后的箱梁,在脱出内模和侧模后,采用横移梁台车将箱梁横移至箱梁存放台位;当梁体混凝土强度和弹性模量均达到设计要求值,且龄期在10天以上后,在存梁台座上进行第二次张拉(终张拉)。预应力孔道压浆采用真空辅助压浆工艺,封锚采用C50无收缩混凝土。桥面预制件在预制场集中预制,采用C40高性能混凝土;防水层、保护层在存梁区施工,其他防撞墙、声屏障、钢拦杆及排水系统等桥面系项目,在架梁完毕后在现场进行施工。4.3.3生产能力确定a.根据工期安排和征地情况,制梁场建设时间为2008年8月2008年12月,建场期共计4个月,预制场建好后,试验梁生产计划于2008年12月1日开始,进行3个月的试生产,并按照铁道部铁路桥梁生产许可证管理办法进行技术评审和生产许可证发证检查、考核,在取得生产许可证后,于2009年3月开始进行正式批量生产。根据箱梁出厂砼龄期45天和对供梁速度的要求确定梁场生产能力。b.生产能力计算:根据后张法预应力砼简支箱梁各工序时间横道图,详见“后张法预应力砼简支箱梁单孔梁施工工艺流程图” 可知:预制一孔箱梁底、侧模占用96小时,内模、外模占用54小时,端模占用50小时,钢筋预绑台座占用8小时,根据梁场配置的台座、底、侧模、内模和端模数量计算生产能力计算式如下(每月按30天计):由于预制场所配备的模板与制梁台座比例为1:2,根据以上各工装的占用时间,应按底、侧模占用时间进行计算较为准确。则有:月理论生产能力(孔/月)=侧模数量24(h)30/每孔梁侧模占用时间(h)=30孔月 考虑箱梁预制受天气、机械故障等各种因数影响,故箱梁在实际生产时按24孔月计算。4.3.4梁场建设方案临时设施本着“相对独立、便于管理、注重环保、方便施工”的原则进行布置,同时考虑临时征地在施工任务完成后易于恢复原貌。临时设施沿线路一侧布置,便道、动力线路、水管等均未跨越本线。施工便道就近与既有公路连接;施工用电考虑到用电负荷较大,就近连接高压线路引入梁场变配电室;位于线路左侧约0.4km秀山山脚有一座已建水塔及水井,而且沿秀山至化工厂道路铺设有DN100mm输水管线,该供水系统完全可以满足梁场施工、生活用水的需要。4.3.4.1三通一平4.3.4.1.1施工道路预制场施工便道:预制场紧靠乡村公路,路宽6 m,施工交通便利。拟修环场道路、2条场内主干道,路面一条6m宽,一条8m宽,用厚20cm、的C25砼硬化。4.3.4.1.2 施工及生活用电根据对当地供电情况,并与当地供电部门协商,梁场施工、生活用电从附近的高压专线接入,梁场修建两个变配电室,安装2台500KVA的变压器和1台240KVA的变压器,梁场自备1台250Kw发电机组,以保证施工中和停电应急。4.3.4.1.3施工、生活用水、排水等计划在梁场内埋设100mm供水主管道与秀山水塔连接,在锅炉房、砼拌合站等引设50mm供水支管,分别连接20mm供水龙头,可满足现场以后生产及生活用水。为确保混凝土拌和用水,拟在拌和站旁设一座50m3蓄水池。场区内施工废水全部设盲沟排至集水坑,经过隔油和沉淀处理并经检验合格后排放。3414通讯制梁场领导及各部、室均安装程控电话。设值班调度项目部和制梁场及其他有关方的信息传递并上传下达。计算机采用宽带上网,采用专用软件建立基于互联网的信息管理系统,实现数据网络传输,信息共享。主要领导、施工负责人、技术负责人、安全人员配备移动电话以便及时取得联系。制梁现场调度指挥人员、班组配备对讲机进行现场联络,对讲机频率报请当地公安局批准后使用。4.3.4.2生产区厂房布置坚持经济性、合理性和实用性原则。减小受天气和温度变化对箱梁预制的影响,确保全天侯生产,钢筋加工区、配件加工区设在生产厂房内,为保证雨季混凝土灌筑不受影响,在制梁台座区设置活动式鲒遮雨篷。并在骨料存放区搭设防雨篷,其结构为钢结构和轻钢屋盖。4.3.4.3基底处理 由于箱梁的大体积、大吨位,对于制、存箱梁用台座,移运箱梁轨道基础以及砼拌和站基础等需对其基础底部进行处理,具体处理方案视地质勘探报告决定。4.3.4.4混凝土拌合站根据生产需要,现场建2*HZS120型混凝土搅拌站2座。并在旁边附建砂石料存放场。1座搅拌站共配6个散装水泥罐仓,每个罐仓储量200t共计6个;2个散装粉煤灰罐仓,每个罐仓储量200t共计2个;2 个矿粉罐仓,每个罐仓储量150t;满足10孔以上箱梁的备用料。根据拌和站设备基础图,进行定位放线,严格按照施工图纸施工,保证预埋件位置精确,待基础混凝土强度达到80%后进行拌和站设备的安装。4.3.4.5存梁台座根据箱梁运输支点距梁端3m和存梁支点距梁端1.5m的要求,进行存梁台座垫石位置的确定及布置;同一台座的两端支点垫石中心间距为30.6m,存梁时箱梁每端悬出长度为1.0m;由于梁体的自重较大,天然地基承载力较差。根据所提供的地质资料,受力性能不太好,均需要进行处理。存梁台座施工图梁两端为扩大基础即承台基础然后逐层缩小断面,共设4个支点垫石,采用板式橡胶支座600*104*450支撑。4.3.4.6 450t移梁台车行走基础当箱梁在预制台座初张拉完毕后需将箱梁转运至存梁台座,然后进行后面的工序。根据提梁机的结构形式及其自身的重量、箱梁的自重等,对移梁机的行走线路要进行特殊的处理。对地基承载力不满足设计要求时均需作加固处理。4.3.4.7制梁台座方案由于箱梁的自重大,在设计台座时,考虑台座的强度、刚度、变形及其稳定性。台座采用C30钢筋混凝土结构。根据预制梁设计图、梁场地质资料及制梁台座施工图,进行制梁台座的施工,其梁端部设计为扩大基础即端部承台、底板基础及条形基础,基坑开挖成型后,必须检测地基承载力,保证承载力200KPa,对承载力小于设计值时,必须进行换填或加固处理。钢筋加工及绑扎时,保证钢筋型号、间距、根数及焊接接头的长度等满足设计要求,确保保护层厚度。模板安装时保证断面尺寸,加固结实,混凝土浇筑时严格按照配合比施工,精确控制塌落度,防止出现混凝土离析现象,对底板基础混凝土施工时,应当按高度均匀分段、分层浇筑,用插入式振动棒从一端到另一端振动,避免碰撞模板、钢筋及预埋件。预埋件安装焊接点必须牢固,位置准确, 3道条形基础施工时,模板必须采用钢模板,确保断面尺寸误差在允许偏差范围内,顶面高程控制在2以内。4.3.5模板方案箱梁模板分侧模,端模,内模与底模四大部分。4.3.5.1底模底模通过与预埋钢板焊接与底模基础相连接,通过调节底模各段的标高预设反拱度;内模的位置固定螺杆通过预留的泄水孔与底模基础连接。底模拼装完毕后,在底模板上划出纵横向中心线,梁体端线,并且作好标志。底模在使用前,检查底模的平整度,预设反拱度,长度(考虑压缩量),宽度,对角线,直线度等参数,符合规范要求后,才能投入使用。4.3.5.2内模箱梁内模采用液压伸缩式钢结构,由顶板、纵梁、侧板、纵向移动轨道及液压系统组成。分成端截面、变截面及普通截面三大类,纵梁为箱形截面,顶板与纵梁用螺栓固定连接,侧板与顶板在转动处铰结,两边的侧板用液压缸分两次转动折叠实现伸缩。侧板的直线段和折线段分别转动折叠伸缩。内模纵梁上设升降液压千斤顶,升降液压千斤顶支持于轨道横梁上,轨道横梁固定在底模基础上,当升降液压千斤顶收缩时,通过纵梁带动顶板和已进行两次转动折叠的侧板下降,纵梁上的滑轨落在轨轮上,用卷扬机拉出整个内模,从而实现内模的脱模。为实现等高度梁共用内模,箱梁内模在设计时要考虑不同长度、不同高度之间的相互转化。内模安装:先安装底模上的轨道横梁,将收缩后的内模置于轨道上,用卷扬机拖拉内模滑入已绑扎、吊装完的梁体钢筋骨架的内腔至设计位置,启动液压系统,使内模两侧板撑开并升起顶模,从而使内模处于安装位置和状态,人工安装内模的安全斜撑杆及内模与侧模之间的箱梁腹板限位拉杆。4.3.5.3侧模4.3.5.3.1采用分节制作,相邻两节刚性联接,现场整体拼装为一整体;侧模按设计设置反拱。侧模底部与基础之间铰接,外侧安置液压油缸和铁楔子,上部水平拉杆横向固定,侧模与端模之间用螺栓连接,侧模与内模之间通过固定通风孔模具来保证箱梁腹板厚度。立模时,升起液压油缸使侧模沿铰耳转动,转动到位后即用楔子锁定;脱模时反之。侧模总装图如下图。侧模总装图4.3.5.3.2模板间接缝的处理为防止灌筑时接缝处漏浆影响梁体光洁度,侧模与侧模间,侧模与端模,端模与底模之间除用螺栓连接外,还加设有槽型橡胶止浆条;在侧模与底模之间则采用弧形橡胶条止浆。弧形胶条内侧按梁底横截面圆弧尺寸加工,外侧按侧模坡度加工,并夹持在底模面板上。模板安装就位后,底模胶条受侧模的挤压而自然封闭,保证灌筑时不漏浆。4.3.5.3.3按设计要求设置箱梁反拱度。4.3.5.4端模端模用8mm钢板和型钢制作,为了减小变形和安装方便,端模分为上下三部分拼装,制造时保证钢绞线锚具的定位尺寸准确,模板应平整,端模用龙门吊吊装就位后,与侧模、内模用螺栓联接。4.3.6高性能(耐久性)砼施工按照客运专线高性能砼暂行技术条件,本标段预制箱梁所用混凝土,采用高性能(耐久性)混凝土。4.3.6.1混凝土耐久性指标4.3.6.1.1混凝土耐久性指标:抗裂性、护筋性、耐蚀性、抗冻性、抗渗性及抗碱骨料反应性。4.3.6.1.2混凝土电通量不大于1000库仑。4.3.6.1.3钢筋保护层的厚度必须满足设计要求。4.3.6.1.4抗碱骨料反应性能应符合如下规定:骨料的碱硅酸盐反应砂浆棒膨胀率或碱碳酸盐反应岩石柱膨胀率应小于0.10%;因条件所限不得不采用砂浆棒膨胀率在0.10%0.20%的碱硅酸盐反应活性骨料时,由各种原材料(如水泥、矿物掺和料、骨料、外加剂和拌合水等)带入混凝土中的总碱量(干燥环境)不应超过3.0kg/m3。4.3.6.1.5由各种原材料(如水泥、矿物掺和料、骨料、专用复合外加剂和拌合水等)带入钢筋混凝土中的Cl-总量应不超过胶凝材料总重的0.06%(预应力钢筋混凝土)。4.3.6.1.6 56天抗冻性指标不小于F300。4.3.6.1.7混凝土的抗裂性通过对比试验确定达到混凝土耐久性要求。4.3.6.2高性能混凝土原材料的品质指标4.3.6.2.1水泥水泥宜采用品质稳定、强度等级不低于42.5级的硅酸盐水泥或普通硅酸盐水泥,其品质应符合GB1751999的有关规定。水泥的比表面积不宜超过350m2/kg,碱含量不应超过0.60%,游离氧化钙含量不应超过1.0%。其他要求符合国家标准。水泥熟料中C3A的含量不宜超过8%。氯离子含量不大于0.06%。4.3.6.2.2矿物掺和料a、粉煤灰粉煤灰应选用来源固定、品质稳定、来自燃煤工艺先进电厂的原状灰,也可采用磨细灰,其品质应满足下表的要求。粉煤灰品质指标混凝土强度等级细度%Cl-%需水量比%烧失量%含水率%SO3含量%CaO%C50200.021055.01.03.010C50121003.0b、磨细矿渣粉磨细矿渣粉应选用品质稳定均匀、来源固定的产品,其品质应满足下表的要求。磨细矿渣粉品质指标需水量比%Cl-%SO3%MgO%烧失量%比表面积m2/kg含水率%流动度比%活性指数,%,28d951000.024.014.03.03505001.0954.3.6.2.3 拌合水拌合水应满足JGJ631989的规定,也可采用符合国家标准的生活饮用水,不得采用海水。拌和水PH值4.5;不溶物2000mg/L;可溶物2000mg/L; Cl- 350mg/L;硫酸根离子600mg/L;碱含量1500mg/L。养护用水除不溶物、可溶物可不做要求外,其他指标与拌和水一致。4.3.6.2.4 细骨料细骨料应选择级配合理、质地均匀坚固、吸水率低、空隙率小的天然中粗河砂,细度模数宜为2.63.0。不宜使用山砂,严禁使用海砂。细骨料的品质应满足下表的要求。细骨料的品质指标序号项 目指 标C25C45C5015mm筛的累计筛余量,%01020.63mm筛的累计筛余量,%417030.16mm筛的累计筛余量,%901004含泥量(按质量计),%2.52.05吸水率(按质量计),%2.06泥块含量(按质量计),%0.57硫化物及硫酸盐含量(折算成SO3,按质量计),%0.58云母含量(按质量计),%0.59轻物质含量(按质量计),%0.510有机物含量合格11坚固性,%812
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 图纸专区 > 成人自考


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!