中英文施工组织设计

上传人:li****i 文档编号:139107463 上传时间:2022-08-22 格式:DOC 页数:155 大小:5.35MB
返回 下载 相关 举报
中英文施工组织设计_第1页
第1页 / 共155页
中英文施工组织设计_第2页
第2页 / 共155页
中英文施工组织设计_第3页
第3页 / 共155页
点击查看更多>>
资源描述
Hansen Project Phase I 汉森传动公司一期工程Hansen Wind Energy Drives (Tianjin) Co.Ltd汉森传动(天津)有限公司CONSTRUCTION ORGARNIZATION DESIGN施工组织设计MCC TIANGONG CONSTRUCTION CO., LTD.中冶天工建设公司2008-9-15CONTENT目 录Brief introduction of the propsoal编制说明Construction Organization施工组织General Situation工程概况Sub-division item Construction method主要分项工程施工方法Work Schedule plan施工进度计划Work Schedule Guaranty施工进度保证措施Quality Assurance / rol Plan 质量控制与质量保证计划Safety and Security Plan 安全生产与管理Construction Machine & Equipment Plan and Labor Plan主要施工机具计划和劳动力计划Construction echnology Management施工技术管理Winter construction measures冬季施工措施Construction Plan 施工平面布置图Brief Introduction of the Proposal编制说明一 、Brief introduction of the Proposal编制说明 We arranged professional people to discuss and study the construction method and construction critical points as soon as we received the bid invitation. We have worked out construction organization desgin for your review.我公司根据招标文件和设计图纸的要求,对本项目的施工方案和施工难点进行了细致的探讨,精心编制了施工组织设计文件,供贵公司审阅。This constructional organization design is completed on the basis of your bids files combining our own construction experiences. During making process, we absorbed our advantages but forestalled defects so that we get this scheme improved in many sides, such as full contents, reasonable economy, updated technique and workable measures etc. We also set a higher goal in construction period, quality and civilized construction.本施工组织设计是在贵公司提供的招标文件、施工图和我公司多年施工经验的基础上编制的。在编制过程中,我们认真总结了以往类似工程的经验和不足,使方案不断地完善,并力求做到方案切实可行、科学合理,技术先进可靠、措施得力,使本工程在工期、质量、安全、文明施工上有明确的目标和可靠的保证。Our bid hereby is a general arrangement of the whole project designing. It may have difference with the actual situation on site. But we believe if we can get the project, we can do the necessary modifications when we get contract signed and drawings studied. Depending on the advantages of talent wealth, scientific management, superior technique and up-dated equipment, we can provide you with and excellent constructional project prior to finish time.本施工组织设计是对该项目工程工作内容的总体部署和安排,本施工方案在编制过程中力求减少与现场实际情况的差距,在项目的实施过程中,针对施工现场的实际情况还需对施工组织设计进行更细致的修订和补充,不断加以完善。我们将依靠我公司在人才、管理、技术、装备上的优势恪守合同、精心组织、确保工程质量达到优良并按期完成本项目施工任务。二Policies of Company公司政策 1. List it as a major project列入重点项目2. Project Safety工程安全和文明施工Try to realize our safety goal of zero accident. Strictly follow Construction Safety Produce Supervision Regulation, tighten up the management of safety, meet the owners requirement and follow TianJin” Construction Project Civilization Construction Management Temporary Regulation.确保施工零事故,严格遵循建设部颁发的建筑安全生产监督管理的规定,加强安全施工管理,严格按照业主的要求并遵循天津市建设工程文明施工管理暂行规定,项目执行过程中做好文明施工管理和交通管理的工作。3.Project Quality工程质量Construction should be conducted with strict standards put forward by the owner. The qualified percentage of unit work must be 100% and for each work items we try to meet the qualified criteria.严格按照国家现行的建筑安装工程施工及验收规范和业主要求的质量标准施工,单位分项工程的质量评定合格率达到100%,单位工程的质量评定都达到合格标准。4. Project warranty工程保修Our company warrants to Owner that from the day of completed contract work, the warranty of this project shall follow related clause described in the biding document, the owner can not be influenced by our construction process or lack of material.我公司向业主保证,在完成本项目合同,办理完竣工验收之日起,对本项目的工程保修按照招标文件中要求的规定执行,业主不会受到由于我方施工工艺或所供材料的缺陷而出现的不良影响。5.Project term工程工期Construct as owners requirement under the prerequisite of safety construction and project quality. We guarantee that we will fulfill the project on schedule without the influence of unpredictable weather.在确保施工安全和工程质量的前提下,严格按照业主的工期要求进行施工在不受自然现象的影响下,保证按工期要求完成。三、Working-out Basis编制依据1 Working-out Basis of Construction Organization Design施工组织编制依据This construction organization design is worked out according to current national specification, code & quality procedure documents compiled by our company in conformity with quality criteria system ISO9002, administration standard for venture and successful management experience of CTMCC and tendering documents and drawings provided by the project owner. 本施工组织设计依据国家现有规范、标准,及我单位按照ISO9002质量体系标准编制的质量体系程序文件,企业管理标准和成功的管理经验,业主提供的本工程招标文件和施工图纸编制。2 Major current national construction criteria & code quoted is as follows:主要引用国家现行施工规范和标准如下:Quality Acceptance Specification for Architectural Sub Grade Construction建筑地基基础工程施工质量验收规范 GB50202-2002Quality Acceptance Specification for Underground Waterproofing Engineering地下防水工程质量验收规范 GB50208-2002Uniformed Quality Acceptance Specification for Architectural Construction建筑工程施工质量验收统一标准 GB50300-2001Construction of Concrete Structure Works and Acceptance Specification混凝土结构工程施工及验收规范 GB50204-2002Steel Rebar Welding and Acceptance Specification 钢筋焊接及验收规范 JGJ18-96Test & Evaluation Criteria of Concrete Strength混凝土强度检验评定标准 GBJ107-87Quality Acceptance Specification for Roof Works屋面工程质量验收规范 GB50207-2002Quality Acceptance for Architectural Ground Floor Works建筑地面工程施工质量验收规范 GB50209-2002Quality Specification for Architectural Drainage & Heating Construction建筑给排水及采暖工程施工质量验收规范 GB50242-2002Safety Specification for Temporary Electric Power in Construction Site 施工现场临时用电安全技术规范 JGJ46-88Safety Test Specification for Architectural Construction建筑施工安全检查标准 JGJ59-99Quality Test & Evaluation Criteria for Engineering Decoration Project建筑安装工程质量检验评定标准 TJ303-88Industrial Metal Pipe Construction and Acceptance Codes工业金属管道工程施工及验收规范 GB50235-97Industrial Devices and Pipe Insulation Construction and Acceptance Codes工业设备及管道绝热工程施工及验收规范 GBJ126-89General Situation工程概况一、General 工程概述The project is located in the crossing of Hi-Tech Road and Jingtong Road in BEDA, main workshop is 31204 m2 including production area, logistic area, public and office area, with pre-stressed pipe pile base, foundation of concrete C30, bedding course of concrete C10. The column foundation is sole reinforcement concrete and connect with steel structure column by embedded hold-down bolts. The workshop is single layer and 5 spans of 30.00m, 25.50m, 14.00m, 3x24.00m, and total length is 237.25m, width 142.20m. basic distance between column is 4.5m and several 24m, with roof of dual slope drainage, the max top level of column is 17.2m, main structure members include steel column, solid steel plate girders, solid bracket beams, and crane girders. The main steel structures should be connected with high strength bolts, the max weight of column is 5.5 tons, the max truss of roof 9.5 tons, total weight is 4250 tons, the cladding panels will be applyed to roof and walls. 本工程位于天津北辰科技园高新大道和景通路交口,主厂房建筑面积31204平方米,包含生产区,物流区,公用站房区和办公区,预应力管桩地基,基础采用C30砼,垫层采用C10砼,车间厂房柱基础为钢筋砼独立基础,钢结构柱与基础为预埋螺栓联接。 为单层连续五跨(跨度30.00m、25.50m、14.00m、3x24.00m)钢结构厂房,厂房全长237.25m,宽度142.20m,基本柱距4.50m(个别约24.0m),屋面为双坡有组织排水系统,最大柱顶标高17.20m,主要构件包括:钢格构柱、实腹钢板梁,实腹托架梁及吊车梁等。主要构件之间连接采用高强螺栓,最大格构柱重量约5.50t;最大屋架重量约9.50t,钢结构总量约4250t。厂房围护结构屋面及墙皮采用夹层保温彩钢板。Currently the nature level is about -0.8m, the site is plane after completion of piles construction.目前场地自然标高约为-0.8m。桩基已施工完毕,场地开阔平坦。 The lay out and section sketch of workshop see 1-1 and 1-2厂房结构平面示意图及剖面示意图见图1-1、图1-2。 图1-1、 图1-2图12二、Engineering Speciality工程特点1. The work schedule management must be emphasized based on the schedule sheet according the extension work , short time limited of this project. This project will be constructed in Summer and Winter seasons, and some work undertaken at the same days.本次工程为扩建项目的工作,工期短,而且处于雨季和冬季两个季节,多工种交叉施工,因此,施工中必须依靠进度计划加强施工进度管理。2. The pre-phase work of construction should be fully prepared as lot of the labor, the machinery once operated and the tools centralized at the very beginning. The work sequence should be arranged properly and utilized the labor resource and machinery to save the cost of the construction. 施工现场的人员多,一次性投入的机械、周转料具使用量大,相对集中,施工前期的准备工作要充分。施工中必须合理安排施工顺序,有效利用人力资源和施工机具控制工程造价。3. To pay special attention on the security because the number of the plan labor and each classification of workers are high centralized during construction. 本次施工任务计划投入的人力较多,各专业之间相互穿插作业人员集中,安全工作必须狠抓落实。4. Take efficient steps to strengthen the management of the civilized construction, and embody the civilized construction level of our company.采取得力措施,加强现场文明施工管理,体现我公司的文明施工水平。5. Roof system is complex with various structure shape and joint, roof waterproof work is the key and specialty for the project.屋面系统结构复杂。本厂房结构屋面系统结构形式变化多,不同结构界面相交多,屋面防水施工难度大,是本工程的特点和重点。6.the workshop is continuous 6 span liner arrangement, its is convenient to execute at several spans simultaneously, and possible to deploy more resource and expedite the progress.本工程厂房连续6跨呈线性布置,便于多跨工作面同时展开,对安装工程资源配置和加快工程进度十分有利。7.it is required high manufactory skill for the large mumbers members and types, the most important thing is to hold tightly the structure members management and corporation of conctruction resources,in order to ensure the smooth progress and completion of key target.构件数量大,品种多,对制作工艺水平要求高,难度大;安装工程重点应注意加强对整个工程现场的构件管理和施工资源的工效及协调控制,保证整个工程按计划顺利协调进行,保证过程控制的重要节点目标的完成8.the key point, difficulty and measures工程重点难点及主要应对措施8.1the key point and difficulty of the project is including fabrication and installation of column and beam of workshop, bracket beam and crane dirder. The system installation and waterproof is the key point and difficulty.本工程重点难点:厂房主体结构主要构件包括柱梁、托架梁及吊车梁的制作安装及屋面系统安装是本工程的重点及防水工程是本工程的难点也是重点8.2 the main measures主要应对措施8.2.1 work out the fabrication, transportation and installation methods, considering the complex nature during execution. Establish the measure to assure the quality, progress and safety, and specify authorized persons.编制针对性强的制作、运输和安装工艺方案(作业设计方案),充分考虑方案实施过程中的复杂性。制定落实保证质量、进度和安全控制措施,落实到责任人。8.2.2 ensure the fabrication and transportion capacity during manufacture, arrange 5 line to produce the members, 3 lines for the main members, 2 lines for the others. The main members should mathch with other members for the stabilization requirement of installation units. It is essential to transfer the main member to site on time and safely.制作工程主要保证工厂加工能力和运输能力。安排5条生产线加工构件,其中安排3条加工主要构件,2条加工次要构件。主要构件和次要构件加工应配套出厂,确保安装单元的空中稳定性要求。重要构件运输安全可靠准时运至安装现场,是十分必要的8.2.3 according to the integrated principle, reduce sited assembling and welding, ensure the main member manufacture, delivery and lifting in whole.按照整体性原则。减少现场拼接及结构安装焊接量,应最大限度保证主要构件整体制作,整体出厂,整体吊装。8.2.4 exactly calculate the data according to the lifing equipments technical parameters and environment conditions, ensure the number and capacities of transportion vehicle and lifting equipments to meet the requirement of safety and reliability.依据重要构件安装和主吊机械的技术参数及工作环境条件等综合因素进行精确计算,确保运输车辆和主吊机械的数量和性能满足工程的安全性可靠性要求三、Organization of Project Department项目部组织机构This project here is handled totally by our company and set up project department, which execute the projects organization and construction work. The main labor resource is the constructional company, which we belong to. Personnel in project are composed by technicians and administer who have rich expenses in project management.本项目由公司直接管理,组建公司级项目部,成立该工程项目部,代表公司进行项目的组织和管理,由项目经理部统一组织和协调施工。施工劳动力以公司所属建筑工程公司为主体,项目部的工程技术人员和管理人员由具有较强工程管理经验的人员组成。Business Scope of Management管理部门业务范围:Project manager: the plenipotentiary of the legal representative of the Company, execute Contractors rights and duties, be in charge of the performance in all aspects of the project in line with the contract work scope, contents and the contracted construction period, quality standard项目经理:公司法人代表在该工程项目上的全权委托代理人,行使合同中承包方的权利和义务,负责按合同规定的承包工作范围、内容和约定的建设工期、质量标准、全面完成本项目的建设任务。Site manager: Under authorized by project manager, implement part of the functions of project manager, contact directly client, be in charge of and coordinate the site construction, safety management, civilized construction, and quota and equipment management.现场经理:在项目经理的授权下,在施工现场代理项目经理的部份职能,直接与业主联络,全面负责和协调现场施工、安全管理、文明施工、劳动定额、设备管理等。General engineer: Be in charge of and coordination of construction technology, safety management, civilized construction, organize all construction and technical staff in all fields to accomplish the drawings examination, approval of important technical method, execute aiming management, organize quality appraisal and evaluate, take part in the investigation, analyses and the treatment of quality incident; Make the quality evaluation report to project manager in regularly.总工程师:全面负责和协调现场的施工技术、安全管理、文明施工,组织各专业进行图纸会审,确定工程重要技术方案,实行目标管理,定期组织质量评审,参加质量事故的调查分析及处理,定期向项目经理作出施工质量评估报告。Quality manager: Carry out the quality assurance program and quality plan for the project, execute the supervision, inspection and direction in all aspects to the construction quality and undertake the leader responsibility to construction quality, recheck and confirm the construction in accordance with “Quality Assurance Manual” of the Company; be in charge of the collection of construction data and file-up to the as-built data and documents.质量工程师:贯彻实施工程质量保证程序和本项目质量计划,对工程的施工质量,行使全面的监督、检查和指导,并对工程施工质量负全面的领导责任,对施工活动按公司的质量保证手册进行审查和确认,负责工程资料的收集和竣工资料整理的领导工作。Materials chief: Set up project procurement team based on the project requirement, be responsible in all aspects for the material purchase, material keeping and material delivery, manage and superintend the material consumption of construction site.材料负责人:根据项目任务的需要,组织项目采购组,全面负责本项目的物资计划、采购、保管与发放,管理和监督施工现场的材料使用。Contract chief: Attendance of project quotation and the talks to the terms of the Contract; be responsible in all aspects for the contract, budget, cost accounting, account closing and restricted financial affairs of the project.合同负责人:参加项目报价和项目合同条款的谈判,全面负责工程的合同、预算、成本、结算及内部财务工作。Site safety manager: Work independence; be responsible in all aspects for site safety construction and civilized construction; make the safety work sequence and safety work management rules; be responsible for site safety education and training.安全经理:独立工作,全面负责和协调现场安全施工、文明施工,负责指导监督现场的施工安全管理工作,制定安全管理工作程序和安全工作管理办法,负责现场的安全教育与培训。Chief EngineerSafety ManagerQ/S Dept.Safety/ Quality/ Measure./ Civilized Construction ManagementEng. Dept.Tech. ManagePlant ManageConstruction ManageSurvey ManageAdmin OfficeLogisticSecretarySecurity trainingContract Dept.Labor force/Budget /Contract ManagementFinancial Capital ManageCost ManageMaterialPlant/ Equip./Material Management Civil Work TeamSteel Work TeamOther Discipline Team Project ManagerVice PMOrganize Chart of Project Department 项目经理部施工管理组织机构(见下图)项目总工程师项目安全经理质安部安全管理质量管理计量管理文明施工管理工程部技术管理机械管理施工管理测量管理综合办公室后勤服务文 秘保 卫员工培训经营部劳动力管理预决算管理合同管理财务部资金管理成本管理物资部料具管理设备管理材料管理土建工程施工队钢结构工程施工队其他专业作业施工队项目经理项目副经理四、General Organization of Construction施工总体部署1. The goal of quality公司的质量方针Manage scientific, quality is first, promise the contract, be satisfied with client.科学管理,质量第一,信守合同,顾客满意。2. Goal奋斗目标Reasonable arrangement, scientific organization, careful construction can help us with the world- class work.合理安排,科学组织,精心施工,确保按期竣工,安全优质完成施工任务。3. Construction period and key schedule point施工周期和关键进度节点Commencement on Sept. 29, 2008, completion on Mar, 22, 20092008年9月29日开工,2009年3月22日完工。Completion the items of 1A in test bench area on Nov. 20, 20082008年11月20日完成实验区1A部分的工程内容。Completion the public area on Jan. 17, 20092009年1月17日完成车间公共区。Completion all cladding system and handing over to equipment installation on Fub. 14, 20092009年2月14日完成所有区域的围护封闭,交付所有的设备安装工作面。4. General Lay-out现场总平面布置According to the Phase I layout, firstly construct the temporary road in compliance with design after commencement, and hand over to the client after completion.根据一期平面布置图,开工后首先按照设计做法铺筑设计临时道路,施工期间作为施工临时道路,完工后移交给业主。Construct the temporary road along the outer wall of west and north, connect with designed road and form construction circle road. Remain the temporary road of pile driving in workshop till the completion of concrete foundation and filling of crushed stones for floor. While steel structure installation, the crushed stone bedding course is completed and meet the requirement of crane passage. Build the colored corrugated fence plate 2m high along the side of jintong road and high-tech road according to design, parallelly construct the fence wall with distance 15m to outside edgeof temporary road along east and south side. The span between fence wall and road will be use to stack construction tools and steel structure member temporarily.沿一期工程西侧和北侧外墙走向铺筑临时施工道路,同设计道路连通,形成施工环路。保留车间内部打桩施工期间的临时道路,待基础混凝土全部完成后,地面碎石垫层回填前再行拆除。待钢结构安装时,地坪碎石垫层已经回填完毕,可以满足吊车通行需要。景通路和高新大道侧场地围挡以2米高彩色压型钢板沿设计围墙走向布设,东侧和南侧围挡距设计临时道路外边线15米平行布设,围挡和道路之间的场地可临时堆放施工料具和钢构件。Locate the office to the north of workshop, and living area to the west of workshop, there have enough places to build dormiroty accommodated for 600 labor.办公区布置在车间北侧,工人生活区在车间的西侧, 此处场地开阔,建设最多可同时容纳600名工人的临时宿舍。Sub- division Item Construction Method主要分项工程施工方法一Civil Works Construction Scheme土建工程施工方案1.1 Measuring工程测量1.1.1 The instrument & tools will be used for the survey and setting out work included: electronic total station, level gauge, steel tape, and etc.本工程测量和放线使用全站仪、水准仪、钢卷尺、塔尺等仪器和工具。1.1.2 All surveying instrument will be checked and corrected, and the qulified certification should be applied from Authorized department.施工前应对所有测量仪器进行检验和校正,并且应有检测部门的检定合格证。1.1.3 After the plan control point work hand-overed from TRA, the control print should protect well. Two-direction control axial line of building was lead-out by the control print, and all the two sides of axial line should make the control point again and mark triangle signal. Each controlling point should be protected with the tripod of special rebar.由甲方移交的平面控制点办理完交接手续,并对现场控制点做好保护。由控制点引出建筑物两个方向的控制轴线,所有控制线的两侧都应重新做控制点,建立控制网,并做红三角标记,对每个控制点用特制钢筋三角架加以保护。1.1.4 According the elevation controlling point provided by TRA, several point shall be gain by surveying around the building. The elevation above 2nd floor will measured by steel rule and continue precise surveying from the starting point 0.00 each time.根据甲方移交的高程控制点,在建筑物周围引测若干高程控制点。1.1.5 Controlling points provided by TRAare not enough to meet the work requirement. To insure the accurate of setting out work, the plane and elevation controlling net system shall be re-built by the known coordinate, orientation, and the original data of elevation.业主提供的红线点不能满足本工程施工放线的要求。为了保证较高的施工放线精度,须以已知控制点坐标作为坐标、方位和高程的起始数据重新建立平面控制网。1.1.6 According to the general plan drawings and lay-out drawings and the speciality of the building and structure, the construction framework shown as below drawing: 根据总平面图和施工总布置图,结合建、构筑物的特点,施工控制网根据建筑物主轴线布设。1.1.7 The plane framework surveying, the proin of intersection of three longitudinal and X-line shall located from known controlling proin by the method of polar coordinate, then correct the point of intersection and the other point of framework will base on the point of intersection. The angle and distance shall measure two times with univers
展开阅读全文
相关资源
相关搜索

最新文档


当前位置:首页 > 图纸专区 > 小学资料


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!