燃油改天燃气燃烧加热系统

上传人:Sc****h 文档编号:131014511 上传时间:2022-08-05 格式:DOC 页数:12 大小:636.50KB
返回 下载 相关 举报
燃油改天燃气燃烧加热系统_第1页
第1页 / 共12页
燃油改天燃气燃烧加热系统_第2页
第2页 / 共12页
燃油改天燃气燃烧加热系统_第3页
第3页 / 共12页
点击查看更多>>
资源描述
燃油改天燃气燃烧加热系统Technical Data ( 技术参数 )燃料:管道天然气 NGFuel:NG热值: 8500kcal/m3Calorie Value:8,500kcal/m3燃气入口压力Inlet: 350mbar to 1000mbar.Inlet Gas pressure: 350mbar to 1000mbar烧嘴功率: 630Kw /1500Kw 1:10 Burner Capacity: Max 630Kw/ 1500Kw 炉子工作温度: Max 780Furnace Temperature: Max 780用途: 熔锌合金及热风发生器Function: Zinc Pot melt and hot air generator烧嘴数量: 4 支 (630Kw 2pcs; 1500Kw 2pcs) +整体式的燃气机一台套CONTROL PANEL:控制柜:The following control panel will be rack mounted and pre-wired to the gas train:独立的控制柜被放置在目前的位置,大小与目前相当,内置两套温度记录仪, 并且所有内部接线都安装完毕:Supply voltage 415/230/1/50Hz供应电压415/230/1/50HzKrom/schroeder Flame SafeguardKrom/schroeder火焰程序控制器Krom/schroeder Keyboard/Display Unit, (Flame signal indicator)Krom/schroeder 输入键盘/显示模块(火焰信号指示)(1) Krom/schroeder l Self-Check UV ScannerKrom/schroeder 紫外火焰探测(带自检功能)VX700R color paperless recorder( VX700R型无纸温度记录仪)Purge Timer吹扫延时继电器Pilot Interrupt Timer点火点火延时继电器Power On/Off Switch电源开关Burner On/Off push buttons燃烧器开关按钮High temperature limit controller with display高温程序控制器(带数显功能)(1) Type K ThermocouplesJ型热电偶Ignition transformer and wire点火变压器及连线Indicator lights for:指示灯显示:Power on(得电)Interlocks proven(互锁通过)Purging(吹扫)Purge complete 吹扫完成(Ready to start准备点火)Pilot On母火开Main Burner On燃烧器运行Flame Failure Alarm火焰熄灭报警An alarm-fault light reset pushbutton is employed to reset the alarm indicators. An emergency stop push button is also included. These pushbuttons are also door mounted.带报警指示的复位按钮,用来复位报警。还包括紧急停按钮。这些按钮都安装在控制柜面板上。PROCESS AIR FAN INCLUDED工艺风机AIR Fan with approximately 3000m3/hr and 9000Pa 3 sets三套供风量为3000立方米/小时,风压为7800-9000Pa的离心式风机;其中:熔锌炉两台烧嘴共用一台风机 ;Flanged process air inlet and outlet with companion flanges标准法兰连接的工艺风入口和出口CONSTRUCTION FEATURES:组件喷涂事项All Gas piping painted “Yellow”所有燃气管路-喷涂黄色Rack surfaces and components painted “White”架装表面和组件-白色Control Panel enclosure “Power Coating RAL 1008”控制柜喷塑丰田白Heater Section painted “Silver”炉体部分-银白色DOCUMENTATION:交货文件:System operation manuals will be provided for the skids, which include:系统操作手册,包括:Electrical schematic pre-wire drawing电路图Mechanical Drawings机械组装图Recommended Spare Parts Lists推荐备件清单Component literature组件表Pipe train test sheets管路测试规格表PRE- TESTING:试车前测试The following pre- tests and inspections will be performed at Job side:以下测试和检验将在现场组装完毕后检测All pressure switches will be tested for correct operation using Air, regulated to demonstrate trip point, both rising for high-pressure switches and decreasing for low-pressure switches.所有压力开关出厂前都将使用空气进行打压测试,All pressure gauges shall be tested for correct readings.所有压力表都经过打压测试并标定读数All safety shut off valves will be tested to confirm proper opening and closing sequences.所有安全切断阀都经过开启和关闭动作测试All control valves will be tested for full range of motion.所有控制阀都经过全行程动作测试All wiring and terminals will be checked for proper routing and continuity.所有接线和端子都经过严格检查The entire pipe train will be pressure tested to at least 1.5 times the maximum operating pressure and verified to be leak free.管路系统经过打压测试,测试压力至少为最大工作压力1.5倍。
展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 图纸专区 > 幼儿教育


copyright@ 2023-2025  zhuangpeitu.com 装配图网版权所有   联系电话:18123376007

备案号:ICP2024067431-1 川公网安备51140202000466号


本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。装配图网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知装配图网,我们立即给予删除!